Action Plan for Improvement of Performance
ACTION PLAN FOR IMPROVEMENT OF PERFORMANCE BASED ON 1st HALF YEAR REVIEW

| | | | |
|Sr No |KRA |Area of Improvement |Plan/Steps for improvement |
|1 |Achieve Planned target of Tower ‘B’ |) Micro Scheduling |1)If VFC drawings are not received in well in advance then|
| |Completion of RCC work upto Mar 2010 |2) Strict Progress Montoring |the work should be carried as per available design and |
| |upto 19th slab (Subject to obtain CC |3) Fixing Mile Stone to track the |drawings. 2) If Contractor is not performing then the |
| |upto Terrace & Clearance of working |Schedule intermediately |contractor should be penalised or another contractor |
| |drawings well in advance) |4) To get the work done |should be deputed for the work. 3) If the material is |
| | |5) To get the material in time |shortage then we should arrange for the material |
|2 |Civil Finishes :- A) B/W, Plaster & |) Micro Scheduling |1)If VFC drawings are not received in well in advance then|
| |other finishing Items of Typ. Toilet & |2) Strict Progress Montoring |the work should be carried as per available design and |
| |Typ. Lobby (excluding P1 & P6 Lobby) |3) Fixing Mile Stone to track the |drawings. 2) If Contractor is not performing then the |
| |B) Services Co-ordination |Schedule intermediately |contractor should be penalised or another contractor |
| |

You May Also Find These Documents Helpful

  • Powerful Essays

    Once the owners and the general contractor have selected an electrician, plumber, and master carpenter, they will all meet to review the architectural plan and make any necessary changes. At this time the plan will be submitted to the city for approval. After approval is received, excavation is completed, and the actual construction has begun, the owners will have weekly meetings with the general contractor to closely monitor the progress of the…

    • 1988 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    Proj 598 Pp1

    • 3918 Words
    • 16 Pages

    Note: Click somewhere within your table of contents, press F9, select the “update entire table” radio button, and click “OK” to refresh it automatically.…

    • 3918 Words
    • 16 Pages
    Powerful Essays
  • Powerful Essays

    Pm 598 Course Proj Part 1

    • 1222 Words
    • 5 Pages

    Starting September 1, 2012, BSE Inc. will begin soliciting proposals from contractors for the new baseball field located at 1218 Alabama Avenue, Selma Alabama.…

    • 1222 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    Palmer Bird

    • 4419 Words
    • 17 Pages

    and masonry work on the exterior cladding of the building and hired an engineering firm,…

    • 4419 Words
    • 17 Pages
    Powerful Essays
  • Satisfactory Essays

    bubbaganoosh

    • 515 Words
    • 3 Pages

    Urban Constructions has several policies, procedures and practices in place to protect the client, suppliers, our staff and our contractors. Limitations placed upon our team can restrict the project to what it will produce. To make this subdivision successful, we must follow these procedures.…

    • 515 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Ngc 3

    • 6484 Words
    • 26 Pages

    |1. Handrail at the entrance to the building has become | |Make a temporary repair until a welder can be |Immediate |…

    • 6484 Words
    • 26 Pages
    Good Essays
  • Good Essays

    Atul Gawande Case

    • 706 Words
    • 3 Pages

    So, finally master construction schedule is prepared by taking in confidence all trades concerned with constructing building to solve routine problems Still, there are surprising issues, as uneven settling bringing about a huge dimple in the floor. For these, there are "submittal timetables" determining correspondence undertakings, assignments that rundown individual W will chat with individual X on date Y about Z. This strengths correspondence and speedy choice…

    • 706 Words
    • 3 Pages
    Good Essays
  • Good Essays

    | |contractors/builders carrying out work on the premises. This is the main legislative framework that|…

    • 1335 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Site work will be limited to Monday through Saturday, 0800 to 1800 according to Camp…

    • 459 Words
    • 2 Pages
    Good Essays
  • Good Essays

    • If there is a shortage off Materials and If I know where to go to get more then I be able to do it myself…

    • 3809 Words
    • 16 Pages
    Good Essays
  • Satisfactory Essays

    Interim Delivery 1: Your project is based on the Conveyor Belt Project. Complete Part 1. Complete…

    • 1577 Words
    • 8 Pages
    Satisfactory Essays
  • Good Essays

    The contractor indicates that the work will last for about six weeks, and no additional funds will be needed. However; the contractor’s crew starts the work in the building three weeks after the agreed date and after eight weeks later the work is finished only about 50 percent. In addition, the work is of poor quality as well as the materials used. Mr. Smith tried to contact the contractor but failed to receive any answer on the project.…

    • 610 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Design-­‐Build Project Delivery Method DEFINITION The term “Design-­‐Build”, is used to refer to the procurement process in which an owner of a project establishes a contractual relationship with a single entity for both design and construction services. The entity, or “designer-­‐builder”, is not only responsible for the construction phase but also the design of the project. The Design-­‐Build entity can be arranged in many ways depending on the agreements established between the owner and the Design-­‐Builder. For example, the design-­‐builder may be a single company or it may be a consortium or joint venture.…

    • 3220 Words
    • 13 Pages
    Powerful Essays
  • Powerful Essays

    and site proposal to yield the possibility of excavation. This is to determine the role and…

    • 1789 Words
    • 8 Pages
    Powerful Essays