Aic Netbooks Case Study Analysis
AIC Netbooks: Optimizing Product Assembly

History
AIC Systems was founded in Taichung Taiwan in 1992 as a printed circuit board producer for the personal computer industry with specialization in motherboards and graphic cards. By the early 2000s, the company had evolved into an Original Design Manufacturer (ODM). As an ODM, the company actively strived in innovating and designing each new generation of components. In 2007, the company decided to diversify its product portfolio to include consumer electronics with focus on mobile technology. By entering the netbook market, AIC was able to design and manufacture a branded product in the mobile industry. The production manager and chief industrial engineer established an assembly line process for netbook production.

Issues
The issues that AIC is having are the current demand and the lack of enough employees. The current employees work 10 to 12 hour shifts which are not sustainable. The Chief Strategy Officer expects demand to be 130,000 units within the next two months. The company faces the obstacle of meeting that demand as well as improving the assembly line process in order to accomplish this goal.

Analysis In order for AIC to meet the demand stated above, there are two options. The first option is to increase the number of shifts to three. The amount of production will increase while decreasing the shift hours to eight. This will allow the company to hire more people as well as keep the efficiency up. Also with this option, there will be no need to create another assembly line and the plant capacity will be utilized. The downside to this option is that the company would have to take the time to train the new employees as well as possible resistance from the management team.
The second option would be to create a new line of production. Production will also increase with this option but there will be the initial cost of starting a new assembly line. Management would be happy to only add a few more

You May Also Find These Documents Helpful

  • Powerful Essays

    atherley furniture company

    • 2184 Words
    • 9 Pages

    Objective: Upgrade manufacturing equipment and expand the company to keep up with the strong demand for the “Caledonia” and “Atherley” models.…

    • 2184 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    Thicketwood Ltd

    • 3242 Words
    • 13 Pages

    In the Thicketwood Ltd case there are a few problems and issues that need to be addressed immediately in order to keep up with demand. The current process that involves strictly human labor is no longer efficient as the demand for cabinets continues to increase. The current process has 5 steps which include cutting, drilling, routing, assembling, and finishing the cabinets. The third step in this process takes the longest amount of time to complete and also has the highest number of employees working on it. This step causes a bottleneck and everything is becoming backed up at this stage. Management needs to implement a change in order to try to become more efficient and meet demand but also continue to make quality cabinets. The company has come across an option that they believe will eliminate the bottleneck and allow the supply to meet demand. The option the company believes would be the most beneficial is a Computer Numeric Controlled (CNC) router. The decision that must be made is either to purchase the new machine or the old machine. Each machine has a different price and different life expectancy. By purchasing and implementing this machine to the production process it would also eliminate jobs on the production line, which may result in employees being transferred to different areas or may cause some layoffs which as a result can have a negative impact on the relationship between workers and management which is currently very good as a result of wages and benefits and there have…

    • 3242 Words
    • 13 Pages
    Good Essays
  • Powerful Essays

    Shuzworld Analysis

    • 5851 Words
    • 19 Pages

    In order to improve the workflow of the assembly line, the Shanghai production facility needs to utilize the assembly line balancing tool. The assembly line balancing tool was selected because of the production facility’s goal of organizing its “assembly line to be the most efficient” by using the “correct number of workstations” (MindEdge, 2014). This tool will empower the facility to achieve its goal by…

    • 5851 Words
    • 19 Pages
    Powerful Essays
  • Good Essays

    Unit 3 Ip Econ 220

    • 697 Words
    • 3 Pages

    This paper will provide an analysis of 2 production scenarios. We will calculate costs associated with running a production facility. Furthermore, the analysis will be used to provide a basic understanding of how changes in staffing and productivity impact profit and loss.…

    • 697 Words
    • 3 Pages
    Good Essays
  • Good Essays

    There are many ways to change the way Factory Faming is conducting their operations with mass production.…

    • 940 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    We did less messing around with the lot size and priority since these were definitely less important to the overall success of your factory than the number of machines you had. We did switch the lot size to 3 by 20 early in the simulation since we know that smaller batch sizes can speed up production. We were afraid to go to the 5 by 12 because of the large setup time at stations one. We ended up with a total of 6 machines at station one, which allowed two orders to be simultaneously worked on with a batch of 3 x 20.…

    • 501 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Unit 6 Assignment

    • 1242 Words
    • 5 Pages

    (01) Building Renovation: Moving the equipment around to make sure that it is better organized. Moving the foundry to where the raw products and finished products are located right now will open up the receiving and shipping. Receiving and shipping now can be one big area with the possibility of adding more equipment to the area which would bring down the delay between the two anchors. If there is a way of dividing the manufacturing area so that the area can make both anchors at the same time instead of having that 36 hour window of changing the equipment. This will cut cost down on the down time and increase the profit margins.…

    • 1242 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Atc Research Paper

    • 479 Words
    • 2 Pages

    As output rises, a firm’s ATC declines. It is producing more and more units using the same overhead, so the cost per unit is declining. For example, if a firm builds an assembly line to turn out stereo speakers, it can lower ATC by increasing output. If the assembly line were run for just 8 hours a day, by adding a second shift, output could be doubled without incurring the expense of building a second assembly line.…

    • 479 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Toshiba Notebook

    • 729 Words
    • 3 Pages

    Toshihiro Nakamura, manufacturing engineering section head, examined the prototype assembly process heet for the newest subnotebook computer model. When every new model was designed, considerable attention was directed toward;…

    • 729 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Eagle Manufacturing

    • 862 Words
    • 4 Pages

    There are multiple major problems involving all facets of the Eagle Manufacturing Company. The primary problem, in my opinion, is the simple lack of communication between department heads, management and employees, and just within the company as a whole. The fact that the supply chain management department head has to explain attrition rates and budget cuts to operations and administration rather than that coming from upper-level management is very indicative of communication issues.…

    • 862 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Ashley Wall, Director Human Resources for one of the plants of The Treadway Tire Company situated in Lima has to submit an effective plan to resolve the issues that are faced in the plant and are impacting the productivity and efficiency of the plant.…

    • 1098 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Six Basic Strategy

    • 306 Words
    • 2 Pages

    • Production: We will grow capacity to meet the demand that we generate, avoiding second shift/overtime when possible. After our products are well positioned, we will investigate modest increases in automation levels to improve margins, but never at the expense of our ability to reposition products and keep up with segments as they move across the perceptual map.…

    • 306 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    There is increasing pressure on business to be more flexible and to deliver products and services to customers quickly. IT practices often inhibit these business goals.…

    • 2075 Words
    • 6 Pages
    Powerful Essays
  • Better Essays

    The 21st century has so much to offer with all of the technological advances that have happened in the last decade. Everything from iPods to iPhones to iPads to MacBooks have taken over today’s society. Not to mention the ton of other products available in any electronics store. Technology is everywhere, and it is being used in so many more ways than was even imaginable ten years ago. With this rails increase in the use of technology, it is important to keep everyone updated and informed on how to properly use it. It is challenging for adults to go into a work place and try to learn…

    • 2683 Words
    • 11 Pages
    Better Essays
  • Satisfactory Essays

    1.- What Price should Jowers charge DayTraderJournal.com for the Atlantic Bundle (that is, Tronn servers + PESA software tool) according to the following four criteria?…

    • 385 Words
    • 2 Pages
    Satisfactory Essays