1.0 WELCOME AND OPENING PRAYER

1.1 The 140th Aerodrome Security Committee meeting was chaired by Mrs. Lindy-Ann Horsford-Redman, Manager Airport Operations and Services (Ag.). The morning’s proceedings commenced with a prayer.

2.0 READING AND CONFIRMATION OF MINUTES

2.1 Confirmation of Minutes:

2.1.1 Correction: 6.7.1. Immigration.

2.1.2 Correction: 6.12 Ms. De Souza.

2.2 The minutes of the 138th meeting was confirmed on a motion by Ms. De Souza and seconded by Insp. Dennis.

3.0 MATTERS ARISING OUT OF THE MINUTES

3.1 Emergency Fuel Shutoff System antenna has been replaced and the issue resolved.

3.1.1 Mr. Chance stated that a Caribbean Airlines Agent requested a session (orientation) and clarification as to when the system should be activated.

3.2 The issue with the PA
…show more content…
Consultations are on the way for solutions on reducing bird strikes. No operational disruptions occurred due to incidents.

3.5 Stray animal issue have been addressed to some extent. Stray dogs caused a delay in operations. AATT -Maintenance Department have been working on minor breaches to the fence.

4.0 INTERNAL MODIFICATION WORKS

4.1 Attendees were informed that the Internal Modification Scope works are 100% completed. Variation items are being closed off by Lifetime Roofing. Lifetime Roofing are the only active contractors on the compound.
4.1.1 Alpha Internal Modification Scope have been completed. 2 to 3 Alpha staffers are on site for closing adjustments.

4.1.2 Minor projects such as customs preventative and SITA Office is still pending. Signage depicting what the Airport should look like after modifications are being removed.

4.1.3 Unable to be completed in project was the extension of driveway roof to deter rain from blowing in. Project will be pursued at a later date.

4.1.4 Ms. Piggott reported leakages in the baggage hall, the entrance of Customs and Excise, as well as, the assigned kitchen

You May Also Find These Documents Helpful

  • Good Essays

    Nt1330 Unit 4

    • 4542 Words
    • 19 Pages

    The project's deliverables have all been finished. The project came in on schedule but over budget.…

    • 4542 Words
    • 19 Pages
    Good Essays
  • Good Essays

    Nt1330 Unit 3 Assignment

    • 447 Words
    • 2 Pages

    We cannot complete the construction at this point in time due to the extension of the building project.…

    • 447 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Because these Grant Assurances relate to planning and implementation of projects, the Airport Compliance Manual, Order 5190.6B is not a primary reference source. Rather the current and prior version of the AIP Handbook, Order 5100.38C and 5100.38D are primary sources. Order 5100.38C is included as a reference because in some cases, it may explain the requirements of the Project Specific Grant Assurances more extensively than Order 5100.38D. If there is conflict between the two versions of the order, the latter (5100.38D) takes precedence.…

    • 1888 Words
    • 8 Pages
    Good Essays
  • Satisfactory Essays

    Ilab Week7

    • 297 Words
    • 2 Pages

    According to the Project summary, this project is currently on schedule. The project summary is currently indicating that the project is coming in under budget by $1,720.00.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    1. Service & Staff – second phase now complete; total of 8,000 additional staff now in store…

    • 15898 Words
    • 64 Pages
    Powerful Essays
  • Good Essays

    The Property Registry is in the process of moving forward to a complete makeover and I hope it all works out without too many job losses and to the benefit of existing staff and the…

    • 1036 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    completed. This resulted in the project commencing prior to the full scope of works being…

    • 1250 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    Birkenhead Outlet

    • 1245 Words
    • 5 Pages

    These projects will complement the ground floor works that were completed in late 2012 with expanded…

    • 1245 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    The budget increase was approved and the project number (673615.PS.D1) should be reopened by tomorrow. Please transfer your suspense time by the end of this week. The budget was based on the hours that were previously provided to me, so please make sure there are no significant changes from hours provided. The number will be closed again within the next week or two.…

    • 64 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    If the matter is not resolved at such a meeting, a further meeting will be…

    • 1837 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    A cyber-attack is a deliberate exploitation of computer systems, technology-dependent enterprises, and networks (Janssen, n.d.). There are 11 potential security threats thought to be the top security threats for 2013; targeted attacks and cyber-espionage, hacktivism, nation-state-sponsored cyber-attacks, legal surveillance tools, clouds and malware, privacy threats, fake security certificates, ransomeware spreading globally, MAC OS malware, mobile malware, and vulnerabilities and exploits (Davis, 2013). Symantec’s 2013 Internet Security Threat report finds that there was a 42% increase in targeted attacks in 2012…

    • 1317 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    Week 5 Discussion

    • 292 Words
    • 2 Pages

    A staff meeting has been called for all members of the administrative department at the hospital where you work.…

    • 292 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The pipeline project designs are at 90% complete for Subtropic/West Road., Hacienda Road., Tumin Road and Casalero Dive. I am waiting for information from the City of La Habra Heights on paving to incorporate into the design. I will beginning the bidding process in November, with the board approving at December board meeting.…

    • 88 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    So far, we do not know the afore-mentioned aspects of the project and hence only this information is insufficient to provide us ant help in defining the milestones of the project.…

    • 576 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    In the meantime, we are experiencing a serious cash flow problem which is affecting our ability to complete a number of our other contracts; including the access road extension project (PLC- 10-21743). As you know, any delay in completion of the access road will have a negative impact on a number of other Phase 2 contracts.…

    • 3556 Words
    • 15 Pages
    Powerful Essays