- Donald accepted HMC roles as an alternate to Patti
- Michal asked Donald to check with Trillby Burton for role training requirements pertaining to the position.
- Facility maintenance POC Robert (Primary) and Joe (Alternate)
- Michal or Robert needs provide Joe the training requirement for ESAM
- Joe accepted VPP roles and responsibilities as an alternate to Robert
- Joe raised a concern about the gradual linkage of nitrogen gas.
- Don agreed to speak to David Butler group about the nitrogen gas linkage.
- David Butler has been contacted about the Rubber Seal linkage.
- David Butler promised to get back with Don regarding cost of fixing (150/250) rubber seal.