The Copyright of this document belongs to BCA. No part of this document may be used, disclosed, transferred, reproduced, stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying recording or otherwise to any person not authorized to use it without the express written permission of BCA 1
Continual Assessment 1 (1hr) 15% Continual Assessment 2 (1hr) 15% Final Examination (2.5hrs ) 70%
2
Productivity
Overview of Productivity Construction Management and Productivity Buildable Design Appraisal System (BDAS)
3
Quality
Overview of Quality ISO 9001 Quality Management System Internal Audit Quality Control Circle CONQUAS 21 and BSCQ
4
Environmental, Health & Safety
ISO 14001 Environmental Management System (EMS) OHSAS 18001 Occupational Health and Safety Management System Construction QEHS Management
5
Resource Materials SS ISO9000/ 9001/ 9004 ISO9000 In Construction by CIDB (1994) BCA CONQUAS 21 Manual * Bonus Scheme for Construction Quality (BSCQ)* SS ISO14001/ 14004 OHSAS 18001 / 18002 Guide to the Buildable Design Appraisal System* * Available at BCA Website
6
MSC – Part 1
Productivity Construction Management and Productivity
7
Concept of Productivity
What is
Effectiveness? Efficiency? Productivity? Buildability?
8
Meaning of Effectiveness
Effectiveness - Extend to which planned activities are realized and planned results achieved (ISO9000) Effectiveness is the capability of accomplishing a purpose, sometimes without much regard to the quantity of resources used in the process. An organization is said to be effective if it gets the job done.
9
Meaning of Effectiveness
Items Planned Activities Planned Results 50m Extend achieved? 35 m (70%) 200 sqm (100%) 0 units ( 0%)
10
1.
Laying of water pipelines Casting 6th Storey Slab Plaster 2nd Storey classroom
2.
200 sqm
3.
5 units
Meaning of