Baldwin Water Works
Table of Contents
Introduction page 3
Objectives, Scope of Work, Budget page 3
Diagram 1. Work Breakdown Structure page 6
Life Cycle, Time Plan page 7
Risks Identification and Responses page 9
Monitor and Control page 10
Key Achievements and Conclusions page 11
References page 13

Introduction
In 1996 the city of Cleveland began a $750 million Plant Enhancement Program. The program’s goal was to renovate and modernize the city’s four water treatment facilities, which are among the 10 largest in the US, and were built in 1856; over 500 million gallons of water are pumped to Cleveland residents daily. In the following paper I attempt to provide with an overview of the Baldwin Water Work Plant Enhancement Program (PEP) (one of the four water treatment facilities) scope, time plan, costs, and objectives; describe the program’s life cycle stages required to execute all projects involved; indentify and analyze the possible associated risks, and present the respective risk responses; define the controlling and monitoring process of the program; indentify and analyze the framework items of the program’s plan that were critical to reach key achievements.
Objectives, Scope of Work, Budget
The first step towards the definition of the Plant Enhancement Program’s (PEP) objectives is indentifying the need that this set of projects attempt to satisfy: developed in 1924, Baldwin Water Works Plant is in need of renovations and improvements. The next step is for the program management consultant (PMC) to comprehend the programs objectives. In this business case, as in many other cases, PMC is not assigned early enough in order to participate in the formation of the objectives; the objectives are established by the program’s sponsor (City of Cleveland Water Division) (Kerzner 2013, pg. 509). Furthermore, in order to understand and validate PEP’s objectives must, the PMC must take under consideration PEP’s public



References: Bowens Associates Inc. (2013) Baldwin Water Plant. Retrieved from www.rlba.com City of Cleveland, Department of Public Utilities Diebel, J. Catalano, L. (2011). Providing for Aurora. Civil Engineering. 81, 9, 58-74. doi: 08857024 Hallows, J Khan, A. (2006). Project Scope Management. Cost Engineering. 48, 6, 12-16. Retrieved from http://ehis.ebscohost.com Lewis, J., P Project Management Institute (2012). Baldwin Water Works: Reconstructing Cleveland’s Water System. Retrieved from www.pmi.org Shehab, T Shiferaw, A., T., Klakegg, O., J. (2012). Linking Policies to Projects: Identifying the Right Public Investment Projects. Project Management Journal. doi: 10.1002/pmj Shook Construction (2013) United States Environment Protection Agency (2013). Drinking Water. Retrieved from www.epa.gov

You May Also Find These Documents Helpful

  • Better Essays

    Mt435 Unit 6 Assignment

    • 1155 Words
    • 5 Pages

    (03) Getting the plant up to code needs to be a short term goal, as they could be shut down since they are not up to US safety and environmental standards. The company cannot afford a shut down or huge fines for not being in compliance. The EPA offers many services that can help the company to get in compliance and to help the company stay in compliance also and the company needs to seek their help to ensure they are meeting the standards.…

    • 1155 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Through the use of Cost Benefit Analysis, the City of Sanford City Management and board of county commissioners addressed the costs and benefits to the project at a time when the economy was starting to take a downturn. It was therefore critical to…

    • 1074 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    IPMA directs attention to the portfolio aspect as well as project management on a global scale. IPMA also includes public sector project management for governments and other public agencies.…

    • 321 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    I am filing this complaint due to the dishonesty associated with West Laurel Water Association. West Laurel Water District asked ($4,500.00) forty-five hundred dollars to provide a water meter and water service for my new home construction. Two (2) representatives from West Laurel Water Association came out to my families' property and told us to temporary hook into a family member's water line for temporary service until grant money could be used to reduce the installation of my very own water meter to the more reasonable cost of ($500) five-hundred dollars. After this promise was made, we personally undertook the cost of ($250) two-hundred fifty dollars, along with the associated labor, to hook into a family member's water line for temporary…

    • 325 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Eurotechnologies Inc

    • 442 Words
    • 2 Pages

    Our company recognizes the urgency from the city to deal with water quality,air quality and road maintenance,escalating demands ,and the overall climate of the industry accompanied by the financial limitations placed by city of tamarack office。Based on this knowledge,the following lists embody the issue and…

    • 442 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    After her tour of the facilities, she’s presented with three water-filled glass containers and challenged to assign each container to a selection of choices: tap water, traditionally treated wastewater, and purified sewage water. This test is obviously to prove the quality of the facility’s purification process because the purified sewage water is aesthetically the cleanest and purist. After this demonstration, Heffernan was immediately engaged and supportive of the San Diego AWPF’s mission and project. She also explains that because of the reoccurring droughts, many residents of California are starting to favor the idea of reusing sewage water, with the stipulation that all purified sewage water be released into reservoirs before use, a process known as indirect potable reuse. The San Diego Public Utilities Department also recommends this procedure but suggested an extra step. Known as direct potable reuse, this method would intensify the purification process and skip the reservoir, sending it straight to the tap. No one knows which technique will be implemented, but, Heffernan explains that whichever process does succeed will persuade California regulators in the…

    • 1194 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    In her article, “Flint Water Crisis: What Happened and Why?,” Susan J. Masten (2016) first acknowledges that “many warnings and concerns were voiced regarding the use of the Flint River as a community water source.” In particular, Brian Larkin, then associate director of Michigan’s Governor’s Office of Urban and Metropolitan Initiatives, and Mike Glasgow, laboratory and water quality supervisor, cautioned that the situation is ‘less than ideal’ (Masten, 2016, 23). Masten (2016) also explains that the inadequacy of the Flint water treatment plant and the failure to install a corrosive control plan largely contributed to the crisis: “Since the Flint plant had not been fully operational in almost 50 years, was understaffed, and some of the staff were undertrained, it is not surprising that it was difficult to achieve effective treatment.” She notes that the Flint water plant did not undergo sufficient pilot testing and corrosion testing before the switch of water sources and even after the switch, there was no method for corrosion control (2016,…

    • 1594 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Pinto, Jeffrey K. (2000). “Understanding the role of politics in successful project management.” International Journal of Project Management, 18(2), 85. Retrieved September 1, 2011, from http://journals.ohiolink.edu/ejc/pdf.cgi/Pinto_Jeffrey_K.pdf?issn=02637863&issue=v18i0002&article=85_utropispm…

    • 2001 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    WCP1 Waterways Corporation is a private corporation formed for the purpose of providing the products and the services needed to irrigate farms, parks, commercial projects, and private homes. It has a centrally located factory in a U.S. city that manufactures the products it markets to retail outlets across the nation. It also maintains a division that provides installation and warranty servicing in six metropolitan areas. The mission of Waterways is to manufacture quality parts that can be used for effective irrigation projects that also conserve water. By that effort, the company hopes to satisfy its customers, provide rapid and responsible service, and serve the community and the employees who represent them in each community. The company has been growing rapidly, so management is considering new ideas to help the company continue its growth and maintain the high quality of its products. Waterways was founded by Will Winkman who is the company president and chief executive officer (CEO). Working with him from the company’s inception was Will’s brother, Ben, whose sprinkler designs and ideas about the installation of proper systems have been a major basis of the company’s success. Ben is the vice president who oversees all aspects of design and production in the company. The factory itself is managed by Todd Senter who hires his line managers to supervise the factory employees. The factory makes all of the parts for the irrigation systems. The purchasing department is managed by Hector Hines. The installation and training division is overseen by vice president Henry Writer, who supervises the managers of the six local installation operations. Each of these local managers hires his or her own local service people. These service employees are trained by the home office under Henry Writer’s direction because of the uniqueness of the company’s products. There is a small Human Resources department under…

    • 5675 Words
    • 23 Pages
    Powerful Essays
  • Best Essays

    Haynes, Wendy, and Andrew Whipple. "Transportation Megaprojects: Comparing Project Management and Oversight Approaches." Public Manager 38.2 (2009): 72-77. Print.…

    • 2235 Words
    • 9 Pages
    Best Essays
  • Good Essays

    → sustainability challenges and advancements in environmental regulation result in growth of demand for higher water treatment standards…

    • 1498 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Fayette, Fulton, Forsyth, Gwinnett, Hall, Henry, Paulding and Rockdale counties are invited to participate in…

    • 295 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Chapter 16 Psychology

    • 440 Words
    • 2 Pages

    16. What are social roles? What was Phillip Zimbardo’s experiment in relation to social roles?…

    • 440 Words
    • 2 Pages
    Powerful Essays
  • Good Essays

    The water treatment plants in Lake Erie must be upgraded to handle severe pollution. Another reason Lake Erie becomes polluted is due to various toxins released: “Some blooms are harmless, but others can produce toxins that can sicken humans and kill birds and marine animals unlucky enough to ingest them” (Mone 20). Although many of the algae blooms are harmless, people must take precaution because, some are very dangerous. A couple of years ago Toledo, Ohio was taken by shock when the water became undrinkable: “In 2014, the water supply for more than 400,000 people in Toledo, Ohio, was declared unsafe because of the presence of microcystins, a toxin released by algae blooms in Lake Erie” (Fultz 34). The water must never get to a undrinkable level again. The water contamination issue must be solved and never happen again: “Because more than 500,000 customers of Toledo's water system were without drinkable water when toxic microcystin from blue-green algal blooms on Lake Erie contaminated the system, the mayor has called for a broad approach to solving the water-quality problem” (Troy, "Mayor…

    • 1065 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Bibliography: Anderson J. E, Public Policymaking, 4th ed., Houghton Mifflin Company: Boston, 2000. Dye T. R, Understanding Public Policy, 9th ed. Upper Saddle River, New Jersey: Prentice Hall, 1998. Dunn W. N, Public Policy Analysis- An Introduction, 2nd ed. Upper Saddle River, New Jersey: Prentice Hall, 1994. Heineman R. A et al, The World of the Policy Analyst, Rationality, Values & Politics, 2nd ed., Catham House Publishers, Inc. Catham: New Jersey, 1997. Howlett M, and Ramesh M, Studying Public Policy, Policy Cycles and Policy Subsystems, Oxford University Press: Canada, 1995. Hughes O.E, Public Management & Administration: An Introduction (2nd Ed), Antony Rowe Ltd, Chippenham, Wiltshire, 1998. Lindblom C, The Policy Making Process, Prentice Hall: Englewood Cliffs, 1968. Miyakawa T, The Science of Public Policy- Essential Readings in Policy Sciences 1, Routledge: London, 1999. Simon H. Administrative Behaviour, Second Edition, Macmillan: London, 1957. Simon, H.A. Models of Man, The Free Press: New York, 1957. Simon, H.A. (1979), "Rational decision making in business organisations", American Economic Review, September, pp.493-513.…

    • 2813 Words
    • 12 Pages
    Powerful Essays

Related Topics