1.0 Introduction
A. Project overview-
Project scope: We will contract yearly with university to create wiring network of PCs in laboratory for students with 60 PCs and maintenance it during 5 year.
Justification: we want to make the interface between students and staff and between the students themselves more easily and usefully. Recourse requirement: to make this network I need 60 computer, cables and switches, server for the internet tables and chare.
Schedules: we must finish this network in 16 days.
The problem: the data is difficult to transform between the staff and it is always redundant when it will be use and there is many resources (like printers, faxes …..)
The environment: the university with student and staff have good experience in PCs and in the network
The Constraints: can face us is the lab is so small to fit 60 PCs and the budget is very less than the cost.
B. Recommendation- planning process is to buying all thing to make the network and built it in the lab and finally is to test this network and maybe to maintenance it in the future , so I recommend to make a very professional network with 60 high speed computers and with huge hard disk and with speed access to the Internet .
2.0 System Description
A. Alternatives- to solve the problem I face is to make a wiring network ,wireless network ,or to share the data by emails or easily with flash memory
B. System description: wiring network: is network build in lab for university with cables and switches that receive data from any computer and maybe store it or transfer it to another computer, or receive a request for one of the recourses and then do it.
3.0 Feasibility Assessment
A. Economic Analysis-
TANGIBLE BENEFIT WORKSHEET Year 1 through 5
1- Error reduction.
2- Increased speed of activity.
3- Improve the planning and services
4- Cost reduction
5- Other 6,500