Preview

Bengaluru Metro Project

Satisfactory Essays
Open Document
Open Document
1195 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Bengaluru Metro Project
JOB SITE REPORT

PUTZMEISTER BOOM PUMPS WORKING AT
BANGALORE METRO PROJECT, BANGALORE

About BMRCL :
Bangalore Metro Rail Corporation Ltd (BMRCL) is a joint venture between Govt. of India and Govt. of Karnataka sharing the responsibility of implementation of Bangalore
Metro Rail Project. It is named as “Namma Metro”.
Phase I metro project started(Civil work) in June2007 .The estimated cost of project is Rs 11609 Cr.
Namma Metro phase-I network consist of two corridors :
East-West and North –South.
Project highlights: Project Routes East-West Corridor (Purple Line): Baippanahalli station to
Mysore road Terminal - 18.10 Kms
North-South Corridor (Green Line): Nagasandra station to
Puttenahalli - 24.20 KMS
Total KMS in Phase –I: 42.30 KMS
Elevated section - 33.48 KMS
Under Ground Section - 8.82 KMS
No. of Station - 40 ( 33 Elevated and 7 under ground)

PCM JSR1029

12.09.2012/Bangalore Metro/Page 1

JOB SITE REPORT

Reach and Routes:
For the implementation and execution of the project, four elevated stretches are called Reaches
& are identified so for convenience purpose. Also there are two underground sections are connecting Reach -1 and Reach-2 in East-West Corridor and Reach-3 & Reach-4 in North-South
Corridor respectively. Each Reach has been given to a contractor for execution of the project.
The details of Reaches are as under.
Section
Reach-1
Reach-2
Reach-3
Reach -3A
Reach -3B
Reach-4
Reach-4A
UG-1
UG-2

PCM JSR1029

Line
East Line
West Line
North Line
First North ext. Line
Second North ext. Line
South Line
South Ext. Line
N-S Underground Line
E-W Underground Line

Route
Cricket stadium to Baiappanahalli -6.7 kms
Leprocy hospital to Mysore Road-6.4 kms
Sampige Road to yeshwantpur -5.1 kms
Yeshwantpur to Peenya ind -4.8kms
Peenya Ind to Nagasandra-2.5 kms
National college to R V Road-4.1 kms
R V road to Puttenahalli -3.9 kms
Sampige and National College-4 kms
Cricket stadium and Magadi Road-4.8

You May Also Find These Documents Helpful

  • Satisfactory Essays

    NT1210 Unit 5 Questions

    • 821 Words
    • 3 Pages

    of a building. The per-floor edge switches have a cable connected to other switches that sit on…

    • 821 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    BUS 323 Final Project

    • 2516 Words
    • 7 Pages

    The UFV School of Business has recently learned that high school student advisors are telling…

    • 2516 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Bus 499 Bsba

    • 561 Words
    • 3 Pages

    Barney’s objective is to purchase a new vehicle. He has found one at a local dealership and if he can sell his current vehicle and the snow tires for the retail price vice the wholesale price, he will have enough to purchase the new vehicle. Billie’s objective is to purchase a vehicle for her daughter when she graduates from college in three months. She will need transportation when she starts working.…

    • 561 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    bubbaganoosh

    • 515 Words
    • 3 Pages

    Urban Constructions has several policies, procedures and practices in place to protect the client, suppliers, our staff and our contractors. Limitations placed upon our team can restrict the project to what it will produce. To make this subdivision successful, we must follow these procedures.…

    • 515 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Nvq 2 Cuting Assesnent

    • 1083 Words
    • 5 Pages

    Next take sections from each side facing the front of the client take each side section and over direct at 45’degress maintaining…

    • 1083 Words
    • 5 Pages
    Good Essays
  • Good Essays

    By: Khermouch, Gerry. Architectural Record, May2004, Vol. 192 Issue 5, p169-176, 6p, 4 Color Photographs, 1 Diagram; Reading Level (Lexile…

    • 580 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    PROJ598

    • 2385 Words
    • 11 Pages

    This will be single source negotiated contract. The instructions to the Contractor are provided below.…

    • 2385 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    With the fundamental to life we all need food, water, and shelter maybe the necessities of life, but some may argue also love is needed to live a life we want. With some great home cooking with a little love in that food you can never be mad at anyone while eating this, but what happens when that food isn't available. Today, I researched what these civil war solders ate during this terrible time trying to steer this new nation in the their path. Some ate, plain things some barely ate anything starving to death, but really what was available at this desperate time?…

    • 1120 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Delightec Case

    • 534 Words
    • 3 Pages

    The firm currently rents a 12,000-square-foot, L-shaped building. This building houses four basic sections:•the office area,•an engineering area,•a machine shop,•and an assembly area.…

    • 534 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Many people go through daily pains and medical bills that will never stop until their suffering ends. So why can’t one help them and end all the burdens life has brought them? With assisted suicide there are two options; a doctor gives the patient pills to overdose on to kill them, or a doctor, themselves, gives the patient the medication to kill them. Assisted suicide should be allowed everywhere around the world, especially for terminally ill people.…

    • 77 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Social Norm Violation

    • 1119 Words
    • 5 Pages

    There have been many social norms that society has “put” in place just to keep things as smooth and as un-awkward as possible. Everyday people follow these norms almost unconsciously. It is expected that every other person follow then them too. So, with this in mind, so my goal is to see how people react when I violate one of these norms.…

    • 1119 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Starting with the architecture and the design of the atrium, PBNDML prepared the project specifications and G.C.E. for the drawings in structural engineering. From the structural drawing, the Havens used it as a basis for shop fabrication drawings.…

    • 1510 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Subway Project Plan Overview

    • 10327 Words
    • 42 Pages

    This project entails opening two Subway Restaurant franchises. The project is described and potential problems identified. The mission, scope, and measuring the progress of the project are also discussed. The first step is applying to Subway for a franchise. Once the application has been accepted, the real work begins. Using Microsoft Project, each phase of the project can be monitored to ensure successful completion.…

    • 10327 Words
    • 42 Pages
    Powerful Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays
  • Good Essays

    dubai metro

    • 905 Words
    • 4 Pages

    ComFlor® case study Dubai Metro Project, United Arab Emirates Client: Government of Dubai Road & Transport Authority/RTA Project management and supervision: Systra-Parsons Designer: WS Atkins & Partners Overseas -ATKINS Main contractor: Dubai Rapid Link Consortium/DURL (Obayashi Corporation - Kajima Corporation - Yabi Merkezi & Mitsubishi Heavy Industrial) Decking system: ComFlor® 80 Telephone: 0845 30 88 330 The Dubai Metro urban train network is a major transport infrastructure development that is already being used by over 200,000 rail travellers a day. It carried 10 million passengers in its first six months of operation and will soon become the World’s longest fully automated metro network, surpassing the Vancouver Skytrain by one kilometre. Over 60,000m2 of ComFlor® 80 composite floor decking has been used in 38 stations, on footbridges, walkways, platforms and all elevated public areas.…

    • 905 Words
    • 4 Pages
    Good Essays