PUTZMEISTER BOOM PUMPS WORKING AT
BANGALORE METRO PROJECT, BANGALORE
About BMRCL :
Bangalore Metro Rail Corporation Ltd (BMRCL) is a joint venture between Govt. of India and Govt. of Karnataka sharing the responsibility of implementation of Bangalore
Metro Rail Project. It is named as “Namma Metro”.
Phase I metro project started(Civil work) in June2007 .The estimated cost of project is Rs 11609 Cr.
Namma Metro phase-I network consist of two corridors :
East-West and North –South.
Project highlights: Project Routes East-West Corridor (Purple Line): Baippanahalli station to
Mysore road Terminal - 18.10 Kms
North-South Corridor (Green Line): Nagasandra station to
Puttenahalli - 24.20 KMS
Total KMS in Phase –I: 42.30 KMS
Elevated section - 33.48 KMS
Under Ground Section - 8.82 KMS
No. of Station - 40 ( 33 Elevated and 7 under ground)
PCM JSR1029
12.09.2012/Bangalore Metro/Page 1
JOB SITE REPORT
Reach and Routes:
For the implementation and execution of the project, four elevated stretches are called Reaches
& are identified so for convenience purpose. Also there are two underground sections are connecting Reach -1 and Reach-2 in East-West Corridor and Reach-3 & Reach-4 in North-South
Corridor respectively. Each Reach has been given to a contractor for execution of the project.
The details of Reaches are as under.
Section
Reach-1
Reach-2
Reach-3
Reach -3A
Reach -3B
Reach-4
Reach-4A
UG-1
UG-2
PCM JSR1029
Line
East Line
West Line
North Line
First North ext. Line
Second North ext. Line
South Line
South Ext. Line
N-S Underground Line
E-W Underground Line
Route
Cricket stadium to Baiappanahalli -6.7 kms
Leprocy hospital to Mysore Road-6.4 kms
Sampige Road to yeshwantpur -5.1 kms
Yeshwantpur to Peenya ind -4.8kms
Peenya Ind to Nagasandra-2.5 kms
National college to R V Road-4.1 kms
R V road to Puttenahalli -3.9 kms
Sampige and National College-4 kms
Cricket stadium and Magadi Road-4.8