“A case study on Bi-Mechanism Bridge at Madhapar”
A PROJECT REPORT On Project I
Submitted by
1. Rushikesh J Dabasia (140850106011)
2. Ruchit M Dabasiya (140850106012)
3. Kiran K Hirani (140850106032)
4. Prakash V Hirani (140850106047)
5. Vikrant D Patel (140850106064)
Team ID.:- 2827
In fulfilment for the award of the degree
Of
BACHELOR OF ENGINEERING
HJD INSTITUTE OF TECHANICAL EDUCATION AND RESEARCH, KERA-KUTCH
Gujarat Technological University, Ahmedabad Chapter 1 Introduction
1.1 Project work introduction:
Title: A case study on Bi-Mechanism Bridge at Madhapar
A bridge is a structure built to span physical obstacles such as a body of water, valley, …show more content…
It will be working with help of both, the hydraulic jack and the cables.
o They both are provided so that in case if any of the one is failed, another system is there to handle it.
o Cables will be winded with the help of heavy duty motors and the hydraulic jack will be filled with oil.
o We are going to design a bridge in which we are providing a fully automatic system in which water level is provided on two sides, as the water level rises the sensor will activate and the bridge will automatically lift up. The bridge will be approx. one foot up above the flowing water.
o When the bridge will be lifting up the alarm or the announcement will be done and the LED screen will be displaying that "WARNING THE BRIDGE IS LIFTING UP". And all the vehicles will be cleared on the bridge