Preview

Broach Bilt Manufacturing Case Study

Good Essays
Open Document
Open Document
536 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Broach Bilt Manufacturing Case Study
Broach Bilt Manufacturing (BBM Inc.) is a minority (women) owned contract manufacturer of printed circuit board assemblies, specializing in surface mount and thru hole technologies, add parts, as well as cable and wire manufacturing services, programming and test services, box builds and mechanical assembly, packaging/shipping services, parts procurement and stocking services. The idea of BBM Inc. started in our CEOs kitchen in April of 1990. Sara Broach (CEO) had just left her job as a legal assistant and decided to be a stay at home mom to her three boys. At that time, her husband, Dwight Broach, was working for another electronic manufacturer where his customers were disappointed with the lack of quality and constant late shipments they were receiving. Dwight knowing that he would soon lose his valuable customers because of this, took this as an opportunity and asked his boss if he could take those customers with him to his new company. With his boss's blessing, BBM Inc. …show more content…
I obtained a better understanding of how contract manufacturing works and how the company operates on a daily basis. BBM Inc. prides itself in utilizing lean manufacturing in its processes which in essence is the relentless pursuit of the elimination of waste. BBM Inc. is a leader in the industry, and strives to accommodate the needs of its customers to the fullest degree. The automated processes help the company accomplish this goal and provide customer satisfaction on all levels. In order to be successful in the lean manufacturing philosophy, BBM Inc. also needs to ensure that scheduling and resource management are being executed properly and in a timely manner. Since the company was started due to customers being dissatisfied with their late shipments, BBM strives to provide on time delivery to all its

You May Also Find These Documents Helpful

  • Good Essays

    They first order the products that are needed. Then these items are shipped to Riordan manufacturing warehouse. Once truck arrives each item must be scanned to ensure they are receiving every item, the correct items, and making sure it was not over ordered. As they scan each item in it is electronically put in to their warehouse system and then if all information is accurate they put it all away in the warehouse at that time. There new system has stopped them from wasting time in areas that they did before, which was what their goal as a business was to…

    • 766 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Ball Corporation (BLL), based in Broomfield, Colorado, is also a leading provider of consumer goods in the manufacturing industry. The financial reports are for the twelve month period ending December 2008. The Yahoo! Finance (2010) website was used to obtain the financial statements for the Ball Corporation.…

    • 2439 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    Disillusionment with Naos

    • 1188 Words
    • 5 Pages

    In the past three decades or so, Western manufacturers have pursued world-class manufacturing status through a shotgun blast of three-letter acronyms: TQM (total quality management), JIT (just-in-time production), DFM (design for manufacturability), QFD (quality function deployment), QPD (quick product/process development), CIM (computer integrated manufacturing), ERP (enterprise resource planning), SCM (supply chain management), CRM (customer relationship management), and so on. The power of these NAOs (new approaches to operations) in improving quality, production scheduling, product development, supplier management, etc. has been forcefully demonstrated in a number of leading companies such as AT&T, Hewlett-Packard, Motorola, Xerox, etc. leading thousands of others to strive to emulate them and their Japanese role models.…

    • 1188 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Westmills Carpets Limited

    • 451 Words
    • 2 Pages

    Third, dependability of delivery and good quality are always important in maintaining good customer relationship. But Westmills' quality and delivery problem are the worst ever. One reason is the difficulties of coordination between some departments, such as urgent sales order cause manufacturing department unable to schedule properly, which rise up the quality problem and make customer unsatisfied. Then it will be difficult to get order from this customer again. The other reason is half-finished control system, with shortcoming from order entry to cost control, are unable to keep reasonable effective or efficient standard.…

    • 451 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Bim Consulting Case

    • 264 Words
    • 2 Pages

    RO B IN M BO W E Y A RT H U R IN GE KU N A L MA N C H A N D A Agenda • About BIM Consulting • Review current Information Systems at Riordan • Review current financial status and balance sheet • Review and compare replacements for legacy systems • ERP Application Recommendation BIM Consulting • BIM is a consulting group owned by three partners.…

    • 264 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Supply Chain Managment

    • 848 Words
    • 4 Pages

    Boeing’s supplier relations program is quite expansive and addresses all notable concerns of big a business. In order to reduce inventories by way of its supply chain relations program, Boeing has set in place guidelines and/or procurement policies which act a framework and are applied in order to help govern all necessary purchases. One of the organization’s overarching procurement tenets, which effectively aids in the reduction of unnecessary inventories, is to purchase “materials of the right quality, in the right quantity, at the right time, at the right price and from the right sources” (Boeing Corporation, 2010). In addition to inventory controls set in place by prudent supply chain management, Boeing is also known for their incorporation of leand principles and techniques which help to maximize efficiency while improving quality and overall safety (Boeing Corporation, 2004).…

    • 848 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Herman Miller

    • 1138 Words
    • 5 Pages

    They focus on a growth strategy, through innovative products and production processes. Reinvention and renewal. They survived the Great Depression and multiple recessions, recovered from the dot-com bust and were able to continue expanding overseas. They adapted to save the company, by introducing new designs. In 1996, Herman Miller began an aggressive drive to reinvent its operations and established a fruitful relationship with the Toyota Supplier Support Center. Unique to the office furniture industry, the relationship enabled the company to adopt and implement world-class, lean manufacturing processes based on the Toyota Production System principles. Through the Herman Miller Production System (HMPS), the company dramatically reduced manufacturing square footage and inventories, cut lead times for standard product from 8 weeks to as little as 10 days, and significantly grew sales and profitability. Another component of the HMPS lean initiative focuses on the company’s people and their development, complementing Herman Miller’s long history of employee participation. Herman Miller believes its success in achieving operational excellence depends on the motivation and thinking of its people to solve problems and drive improvement.…

    • 1138 Words
    • 5 Pages
    Powerful Essays
  • Best Essays

    Riordan's Plan

    • 1371 Words
    • 6 Pages

    Supply Chain Management is about the delivery of a product to a customer in a timely manner regardless of its location of the globe. Providing the right component, the correct quantity ordered, and at the right price is what customers value the most. To enhance customer value and satisfaction a customer relationship integration team should exist and bring together each facility, its services, and its employees into the CRM process. Integrating the available information of an organization allows employees to have immediate access that may be crucial to a customer’s delivery. Customers value the open visibility of their supplier to track any material that has been shipped.…

    • 1371 Words
    • 6 Pages
    Best Essays
  • Good Essays

    1. Can a factory be fast, dependable, flexible, produce high-quality products, and still provide poor service from a customer’s perspective?…

    • 776 Words
    • 4 Pages
    Good Essays
  • Good Essays

    The long cycle time is creating a bottleneck in getting the products to the customer on time. Additionally, the process is a made-to-order system, as opposed to made-to-stock, so the product is not created until the order is received. The variance in the way the company receives the orders is also creating problems,…

    • 629 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    The Boeing Company is the world’s largest aerospace company and one of the top aircraft manufacturers in the world (Boeing, 2014). The company employs over 170,000 people across 70 countries and exports products to 150 countries. In 2003, Boeing decided to adopt Toyota’s supply chain strategies for production of a new aircraft, the Boeing 787. This strategy involved moving all manufacturing to its Tier 1 suppliers who would be responsible for coordinating with all Tier 2 and Tier 3 suppliers and then the finished parts would be shipped to Boeing for assembly and distribution (Collins, 2010). This created an extreme shift in Boeing’s supply chain causing some significant issues for the company. They struggled with quality, delivery, communication, and control. This paper will outline the shortcomings of the 787 project and explore the significant changes Boeing has implemented as a result.…

    • 1589 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Supply Chain Management

    • 3521 Words
    • 15 Pages

    In the past, companies focused primarily on manufacturing and quality improvements within their four walls; now their efforts extend beyond those walls to influence the entire supply chain including customers, customers’ customers, suppliers, and suppliers’ suppliers. Today’s supply chain is a complex web of suppliers, assemblers, logistic firms, sales/marketing channels, and other business partners linked primarily through information networks and contractual relationships. SCM systems enhance and manage the relationships.…

    • 3521 Words
    • 15 Pages
    Good Essays
  • Powerful Essays

    Over the last 30 years, the manufacturing industry has undergone a notable shift in terms of pushing geographic and cultural boundaries. An increased dependence on global trade, offshore labor and a worldwide supply chain are the determining factors for where, what, when and how produced goods reach consumers in an increasingly level global playing field. This shift has been particularly prevalent in the automotive sector, as automotive manufacturers obtain parts from hundreds of suppliers, and the standards for quality are becoming more stringent. A complex organizational structure is therefore required to line up the end-to-end logistics of supply chain management, financials, customer relations and human resources. With a centrally developed and coordinated manufacturing strategy, individual facilities must execute the various tactics for quality management. In this environment, opportunities for business success can be fleeting. Even under ideal circumstances, an unforeseen, outlying factor can determine whether a company wins or loses an important contract. It is critical to establish a competitive advantage in order to simply maintain profits, let alone increase revenues. Businesses can simultaneously reduce costs and remain competitive by investing in process improvements that increase quality. For example, identifying and implementing efficiencies in…

    • 2058 Words
    • 59 Pages
    Powerful Essays
  • Powerful Essays

    The critical dimensions that a process or supply chain must possess to satisfy its internal or external customers, both now and in the future.…

    • 1267 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    On the provider side, VM is a company that was practicing a lean demonstrate while using modified model of the Toyota Generation Framework, so they had to search the right distribution partner that would work with them in idealizing and coordination their supply chain. As a lean company VM was already working towards communication with their distributors about decreasing defects which fit right into what O&M was looking to do. O&M had realized that 7.4% of that cash that they spent on distribution and purchasing functions was rework money. O&M offer their ability in lowering costs for suppliers through “services designed to streamline the supply chain” and their inventory management ability included just-in-time administrations which is precisely what VM practiced on a day by day. However, they found out that their JIT demonstrate was not precisely working as well as they deal with VM. But with any lean practicing company they were willing to analyze the process and find some solution that were more…

    • 1889 Words
    • 8 Pages
    Powerful Essays