BSOP 429 Midterm Exam 1
Page 1
1. (TCO 12) _____ is the objective under JIT and time-based competition.
2. (TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system?
3. (TCO 3) What happens to inventory as the number of kanban cards increases?
4. (TCO 1) In managing supplier relations, which of the following is a beneficial setup?
5. (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered?
6. (TCO 9) Which of the following is true?
7. (TCO 4) According to Elyahu Goldratt, the TOC system uses a scheduling approach called _____.
8. (TCO 5) The amount of time covered by the basic MRP record is called the _____.
Page 2
1. (TCO 1) Please explain PAC. (Points : 20)
2. (TCO 2) How does input from other areas into PAC and the feedback PAC provides impact PAC? Explain. (Points : 20)
3. (TCO 6) Discuss the differences between MRP and JIT. (Points : 20)
BSOP 429 Midterm Exam 2
Multiple Choice
1. (TCO 12) Formal systems for shop floor control under JIT are _____.
2. (TCO 2) An operation setback chart _____.
3. (TCO 3) In order to minimize the number of orders waiting in the queue and maximize the number of orders processed in a center, which of the following rules should be used?
4. (TCO 1) Which of the following is true?
5. (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered?
6. (TCO 9) Which of the following is true?
7. (TCO 4) How much of total lead time is accounted for by queue time?
8. (TCO 5) Gross requirements in an MRP record are _____ because they are stated as unique items for a given period.
Essay Type
1. (TCO 1) List and briefly discuss the five main parts of the operations planning control (OPC) system.
2. (TCO 2) What information should be provided into PAC as feedback and why they are important?
3. (TCO