Implementation is the carrying out, execution, or practice of a plan, a method, or any design for doing something. As such, implementation is the action that must follow any preliminary thinking in order for something to actually happen. In an information technology context, implementation encompasses all the processes involved in getting new software or hardware operating properly in its environment, including installation, configuration, running, testing, and making necessary changes. Implementation management team has a vast experience in a wide variety of industries to make sure your project is a success. Remstar provides smartly designed, cost effective integrated material handling systems that are focused on meeting your business objectives. Our business is the research, design, engineering, installation, system commissioning, and training throughout the …show more content…
whole project. Remstar's project managers are responsible for all aspects of your project and we work closely with the leading equipment manufacturers to make sure your system is operating at its maximum capability and effectiveness. From managing the schedule to ensuring the quality of installation at your site, our project manager is the single point of contact simplifying the whole process for you. The installation of the hardware and software is a very complex task, which required a lot of work and attention to detail.
Making sure all components are working to getting is the top priority of RemStar. The installation is outline if phases for the first week CanGo will be preparing the location for the installation of the ASRS. By the second week the hardware will be delivery for installation. During this time the programmers will be working with RemStar software department to integrate their software into our system. In week three and four the software will be installed and tested for operational usage. By this time the installation for the hardware will be completed, to allow system integration of the hardware and the software coming on line together. This in-turn will allow for the programmers to fine the system to specification. And finally during week five and six testing will be finalize system will be further fine to CanGo Specification. Once all components have been proven operational to CanGo's and manufacture standard product will be delivered to
CanGo.
IMPLEMENTATION SCHEDULE Weeks 1-2 Weeks 3-4 Weeks 5-6
Hardware Installation:
Talk to Vendors & Compare Pricing
Removal old equipment X
Prep Location X
Delivery of Equipment X
Installation and testing of Hardware X
Software Installation:
Meet with Systems Analysts to begin
Installation of Software to new computers X
Test software X
Final Testing of Hardware & Software:
Integrate hardware & software components X
Perform test of hardware & software
Working together X
Perform testing moving boxes and robotic arms on the conveyor system X
Finalizing testing and Delivering equipment to CanGo X Upon implementation the software will be able to automated material handling systems that direct and optimize the material flow and information requirements in a distribution center or production buffer for all control levels of an Automated Storage/Retrieval System (AS/RS). The Material Handing Software optimizes and prioritizes the routing and storage of goods through the facility including conveyance with conveyor systems. It directs and optimizes the operation of lift trucks via RF or voice based upon the assigned characteristics of the product being transported or stored. For outbound orders, the software optimizes the retrieval of goods based on the equipment, and organizes the requests based on the type of product including the types of containerization such as pallets, cases, and split case picking