Career episode for planning and cost control engineer
Career Episode 2
A) Introduction

I started working on this project of “Rehabilitation and Modernization of Jinnah Baarge” on July 2012. This career episode describes my job rotation inside the company in DC&S (Domestic construction and Services) business area in the PMS (Project Management Systems) department. PMS provides project monitoring and control support at all domestic projects.

Geographical Location where experience was gained This project was carried with Descon Engineering Limited located in its Head office Lahore, Pakistan. Descon Engineering Limited is an integrated engineering services and manufacturing company operating in Pakistan and the Middle East. The company offers services cover engineering, procurement, manufacturing, construction, commissioning and maintenance. Descon is a multinational company renowned in the region for its quality, safety and on-time delivery of projects and products. Name of Organization Descon Engineering Limited. Title of Position Planning & Cost Control Engineer

B) Background
Jinnah Barrage project was conceived by Government of the Punjab through PMO(Project Management Office) for Punjab Barrages, Rehabilitation & modernization projects..
Jinnah Barrage is situated about 203 kilometers (126.138 miles) downstream of Tarbela
Dam. It is 5 Km away from Kalabagh town. The site is connected by road with the Karachi seaport, the road distance between Jinnah Barrage and Karachi is about 1159 km, the main road gauge railway connecting Karachi to Peshawar via Kundian Daud Khel-Attock passes close to the Jinnah Barrage. Daudkhel is the nearest railway station which is about 6 km from the barrage site.
This project is a Joint venture of Descon and CCC (China national Electric Wire & Cable Imp / Exp ).Project has commenced on June 18, 2012 after receipt of letter from the Engineer(Consultant) to commence whereas a formal agreement was signed on May

You May Also Find These Documents Helpful

  • Good Essays

    It is highly probable that in an adults work, disagreements with others will occur. In the majority of cases, this is down to a lack of communication or miscommunication. However, these disagreements should be handled very carefully so that the negatively feelings disappear afterwards. Adults can misread or perceive information wrongly and might think someone has communicated something that is the completely the opposite of what they actually were trying to communicate. Blame is often put on others for saying things that can be ambiguous or for having a different view.…

    • 485 Words
    • 2 Pages
    Good Essays
  • Good Essays

    British Raj

    • 649 Words
    • 3 Pages

    After the arrival of some British in Karachi at the end of eighteenth century, they had established a factory at the present SITE location, but it was closed down following a disagreement with the then local Sindhi rulers. Subsequently, British troops occupied Karachi in 1839 and the city served as landing port for British during the First Afghan War. The province of Sindh was then conquered by Charles James Napier in 1843.…

    • 649 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    The construction of the barrage is one of the largest engineering projects in Europe. Completed in 1999, it has created a 500 acre freshwater lake with 8 miles of waterfront and it is hoped it will stimulate the future development of the Bay as a tourist and leisure destination.…

    • 432 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    | : Titas, Habiganj, Narsingdi, Kailashtila, Jalalabad, BibiyanaMoulvi Bazar, Rashidpur, Bianibazar & Bangura Gas Fields.…

    • 14047 Words
    • 57 Pages
    Powerful Essays
  • Powerful Essays

    Ipma Level B Report

    • 5084 Words
    • 21 Pages

    Description / Title Introduction Definitions and Salient Points Employer’s Background Project Background Project Context and Scope of Work Project Objectives Project Organization Project Complexity and Interfaces Project Risks Project Management Challenges Role and Responsibilities of the Project Manager Post-Project Appraisal Lessons Learnt…

    • 5084 Words
    • 21 Pages
    Powerful Essays
  • Powerful Essays

    REGIONAL OFFICE BALOCHISTAN Bungalow No. 15-A Chaman Housing Scheme Airport Road, Quetta. Tel: (081) 831623, 831702 Fax: (081) 831922 helpdesk-qta@smeda.org.pk…

    • 10649 Words
    • 43 Pages
    Powerful Essays
  • Satisfactory Essays

    Bhakra-Nangal Project is a joint venture of Punjab, Himachal Pradesh and Haryana. Under this project, two dams have been constructed over the river Satluj. They are the Bhakra Dam and the Nangal Dam. The Bhakra-Nangal Project is an example of water management on scientific lines on the largest scale.…

    • 644 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    I appreciate the administration for thinking this plan which may be beneficial to the populace. However, it saddens me how can the government propose this project if it will be worthless after how many years? It is too ridiculous how these “hope of the people” spend too much on a dam which will be destroyed in an earthquake hit. The people’s safety should be the top priority of these officers but how come they attend to their own needs first? Yes, indeed, it has advantages but these are being overwhelmed by the great number of disadvantages. The natives will be helpless if this project will be constructed for they will lose their valued homes and agricultural livelihood.…

    • 370 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Ntpc Barh Bihar

    • 5227 Words
    • 21 Pages

    The project site is located about 3kms east of Barh town in Patna district in the state of Bihar, location being Latitude – 25o 28' N & Longitude – 85o 45' E.…

    • 5227 Words
    • 21 Pages
    Powerful Essays
  • Satisfactory Essays

    to visit orphanage

    • 839 Words
    • 8 Pages

    with this project, It was situated in Hyderbad near Giridhar’s house, I was in the project visit for…

    • 839 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    High School and View Map

    • 1191 Words
    • 5 Pages

    38a, Near Southern Avenue, Lake Place, Sarat Bose Road-Deshapriyo Park, Kolkata - 700029 | View Map…

    • 1191 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    It was the capital of Pakistan until Islamabad was constructed as a capital in order to spread development evenly across the country and to prevent it from being concentrated in Karachi. Karachi is the location of the Port of Karachi and Port Bin Qasim, two of the region's largest and busiest ports. The city is located in the south of the country, along the coastline meeting the Arabian Sea. It is spread over 3,527 km2 in area. It is also known as the "City of Lights".…

    • 2082 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Kalabagh Dam

    • 366 Words
    • 2 Pages

    Kalabagh Dam is a dam which will add more than 3,500 megawatts to the national grid and it will be able to solve the problem of load shedding. The project was proposed many years ago, but different governments of the country have had conflicting views regarding the dam.…

    • 366 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Bistro Case Study Solution

    • 1484 Words
    • 6 Pages

    Location: Al Karama Wasl Ruby Building No. R1002 Zabeel Road near Karama Post Office Behind Home Options Building,Karama,DubaI…

    • 1484 Words
    • 6 Pages
    Satisfactory Essays
  • Powerful Essays

    Digital Communicaton

    • 2051 Words
    • 9 Pages

    The Department of Electronic Engineering welcomes you as a student to the Faculty of Engineering and Technology at the Vaal University of Technology.…

    • 2051 Words
    • 9 Pages
    Powerful Essays

Related Topics