TABLE IV.1 WATER DEMAND NORMS CONSIDERED FOR MADURAI CORPORATION
Sl No Description Units Demand Norms Remarks
1 Per Capita Water Supply lpcd 135 As per CPHEEO norms
2 Fire Fighting Demand kl/day 100√P
P = Population in Thousands It is desirable that one-third of the fire fighting requirements form part of the service storage.
3 Bulk , Industrial and other Demands MLD 10% of Total Demand As per the TWAD Board Norms.
4.2 WATER LOSSES IN THE SYSTEM
As per CPHEEO 15% of the losses in the distribution system shall be considered as UFW losses. The same will be considered during demand assessment.
4.3 DEMAND ESTIMATION
The demand assessment as calculated Madurai Corporation for various horizon years has been worked out and presented in Table IV.2.
TABLE IV.2 DEMAND ASSESSMENT FOR MADURAI CORPORATION
Sl No Description Demand (MLD) Remarks 2011 2014 2029 2044
1 Domestic 154.7 164.2 217.1 278.5 @ 135 LPCD
2 Fire 3.4 3.5 …show more content…
For smaller size pipes upto diameter 200 mm, HDPE pipes are recommended. HDPE pipes are flexible and can bend to some extent, thus reduces use of specials like bends, elbows etc. This speeds up the construction activity. In addition, it also minimizes leakages as there are less no of joints.which are welded and are least prone to leakages. HDPE pipes have excellent track record of making good house service connections. Hence can reduce the UFW to the maximum extent. They are tough and can handle heavy traffic loads to some extent which also reduce the vulnerability of pipe breakage due to heavy traffic