Preview

Case Study: When Esu's Were The One Stop Shop For Cutter Support

Satisfactory Essays
Open Document
Open Document
278 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Case Study: When Esu's Were The One Stop Shop For Cutter Support
Do you remember when ESU’s were the “one stop shop” for Cutter support? Ideally, if your Cutter had an electronic casualty and needed to order a part, you would generate a CASREP and request ESU acquire the part. Then things changed. Cutters transitioned to ALMIS and ESU’s morphed into Base C4IT Departments (BCD’s). BCD’s functioned only as the “checkbook”, purchasing parts when requested by the Cutter Product Lines (PL). Technically, BCD’s simply stepped in when requested by PL’s, TISCOM, or C3CEN. Now, if you needed a NTNO item, you still created a CASREP and requested BCD assistance. However, if your item was Coast Guard owned, then you addressed it in ALMIS and SFLC Product Line would request the assistance from BCD. Confused yet? Simply put, Cutters would no longer request BCD assistance unless it was for a NTNO item. …show more content…
Now, the BCD’s will no longer process requisitions for either AFC 42 or AFC-80 purchases. Instead, this task will be performed by C4ITSC-FSD. Starting with an Initial Funds Request generated from an ALMIS/EAL discrepancy, C4ITSC-FSD will determine if AFC 42 or AFC 80 funds are to be used. If the request is for NTNO (AFC 80), the Cutter must first follow 2M/MTR procedures “if applicable” to determine if the part can be fixed locally. If it cannot, the Cutter will draft a CASREP and enter the discrepancy into ALMIS/EAL. If AFC 42 funds are required, C4ITSC-FSD will process requisition and purchase the item(s) Note, if the request is for a “Service”, then it will be sent to the local Port Engineer (BCD) first, who will locate and forward a quote to

You May Also Find These Documents Helpful

  • Good Essays

    The sales agreement is dated September 14, 2010. ACI agrees to deliver the mixer segment and molding segment to EMI by September 25, 2010, as ACI has those two components of the assembly line system on hand at the time the sales agreement is entered into. The sales agreement does not provide EMI with a general right of return for any components of the assembly line.…

    • 838 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Army Fleet Support (AFS) has written Non-Destructive Inspection (NDI) Certification Procedures AFS-M-0119; and IAW Quality Procedures AFS-M-0100, para. 8.2.4.2; and C.12.4.9) and AFS-M-0117 (Training) for performance of Non-Destructive Testing.…

    • 104 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    Depot — The repair is made at a major facility for repair by contractor or Government…

    • 1175 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Did other branches express the need to become a Qualified Facility certified in Canada for repairs? (This is not the CSA factory certification)…

    • 212 Words
    • 1 Page
    Good Essays
  • Satisfactory Essays

    This paperwork of IT 244 Week 3 Checkpoint Toolwire Smart Scenario Business Continuity Disaster Recovery consists of:…

    • 367 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Replacement Ltd. has a strong network of suppliers that supply the company each week with pieces of china, crystal and silver that they locate from estate sales, auctions, flea markets and antique stores. Replacements provides its suppliers the current price the company is willing to pay for a particular piece.…

    • 497 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Based on our analysis, the current old policy maintains the fill rate of DC at about 97%. However, total inventory in DC is $30658.5, which is very costly. Meanwhile the total expected downtime for all 219 parts is about 1000days, which is about 5days per part. Compared with the old one, new policy improves the fill rate by 2% and decreases the inventory cost of DC to $24079. The expected downtime is reduced by 70%, which is about 304 days and 1.388 days per parts.…

    • 295 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The United States Army has many different forms of ordering systems put in place in order to give the proper support for any situation. The Supply Support Activity also known in the supply world as the SSA is the principal way to order all types of tools, parts, supply items and any other stuff the company or unit will required. In the company supply level these orders can be place in several ways. Blasting is known as one of the most common forms to order items, this happens by logging in into P-buse and order items through P-buse. Most items are already loaded into the system and all that is needed is to enter the National Stock Number (NSN), if by any reason the National Stock Number cannot be found, a user created upload can be done by fed-loging the item or looking it up on sites such as webflis. A walk-thru can also be done by completing a DA Form 2765-1. The Supply Support Activity will track all these items in their box and hand out monthly or bi-monthly Reconciliation Reports. The Reconciliation Reports list all the items that the Supply Support Activity is tracking that are being order. It is the job of the company supply representative to proof read the items and double check to see if the items have been received or need to be cancelled due to any circumstances. All the items in the Reconciliation Report are tracked by document numbers. The Supply Support Activity also has a very important function from the big Army point of view, it helps keep control of the supply command discipline program. Depending of the deployment and locations units will have restricted items. It is the function of the Supply Support Activity to automatically identify those items and notify the unit that the orders were cancelled due to whatever circumstance. The Reconciliation Report also shows the status of the items that are ordered. Different set of letters mean different things, for example; BB…

    • 566 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    In the 19th century people with additional support needs were segregated from society. These people were shut away in single sex institutions for life or sterilised. Separate “Special Schools” and day centres were set up that denied both disabled and non-disabled people the day to day experience of living and growing up together. Purpose built institutions (Asylums) housed people who were described as “mad or feeble minded”, the residents had little choice and were not valued as people.…

    • 836 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Stryker Case Study Essay

    • 1341 Words
    • 6 Pages

    Teamwork Challenges at Stryker Corporation The Stryker Corporation was built on innovation. “When Dr. Homer Stryker, an orthopedic surgeon from Kalamazoo, Michigan, found that certain medical products were not meeting his patients’ needs, he invented new ones. As interest in these products grew, Dr. Stryker started a company in 1941 to produce them. The company’s goal was to help patients lead healthier, more active lives through products and services that make surgery and recovery simpler, faster and more effective.” Homer Stryker started Orthopedic Frame Company to sell devices for moving patients with spinal injuries. A short time later he invented the first power tool  the oscillating cast saw  for removing plaster…

    • 1341 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    SureCut shears case study

    • 873 Words
    • 4 Pages

    What assumptions did Mr. Fischer make when he prepared the forecasts shown in case Exhibits 1 and 2? Were these assumptions reasonable?…

    • 873 Words
    • 4 Pages
    Good Essays
  • Good Essays

    GE case study

    • 1119 Words
    • 4 Pages

    GE Oil & Gas was established in 2012 when GE Energy was divided into three new business units of General Electric. Prompted by poor financial performance, GE Oil & Gas was created in an effort to simplify business and also make General Electric more visible to its shareholders ("Working Environment | GE.com", n.d., p. 1). GE Oil & Gas has grown to become one of the key players in the energy sector. Operating in more than 100 countries and employing 43,000 people, GE Oil & Gas delivers equipment and services that enable its customers to access and make more efficient use of the world’s energy resources. With a variety of extremely complex technologies fueling numerous industry-milestone projects, GE Oil & Gas has helped make it possible to extract reserves in the most remote and extreme locations. One example, the Gorgan Project, is one of the world’s largest natural gas projects and provides energy to most of Western Australia. The Gorgan Project provides insight to some of the staffing challenges facing GE in today’s global and complex energy industry("Introduction - Workforce planning in the global oil and gas environment - GE Oil & Gas | GE Oil & Gas case studies, videos, social media and information | Business Case Studies", n.d., p. 1) .…

    • 1119 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Cutting Tool

    • 2661 Words
    • 11 Pages

    Clearance angle (b) Heel cleared away allowing leading edge to enter the workpiece, cutting action.…

    • 2661 Words
    • 11 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Ano Ang Barangay

    • 290 Words
    • 2 Pages

    * Monitors CM transactions by Accounting and transfer finished units to its proper location for those with CM.…

    • 290 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Sales and Inventory

    • 2595 Words
    • 11 Pages

    Haldimand Auto Supply purchased their items to their supplier through phone and supplier visit. The in charge person only makes purchased order when he noticed that the item is only below 3 pieces, because some supplier of certain items has longer lead time wherein the items runs out of stock. Sometimes the supplier will go to the store and ask the owner if what…

    • 2595 Words
    • 11 Pages
    Satisfactory Essays