Preview

CDV-2 Deck Valve User Manual

Powerful Essays
Open Document
Open Document
1376 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
CDV-2 Deck Valve User Manual
RONGDE CDV-2 甲板阀技术条件 CDV-2 甲板阀技术条件 CDV-2 Deck Valve Technical Specification
/ 文件号/Doc. No.: 2301-01-0-02 2301-01-0-02 01-0-0 : 船 厂/ Shipyard: DAI DUONG JOINT STOCK COMPANY, YIETNAM

: 船 名/ Ship Name: DYNAMIC OCEAN 05 船 号/ Hull No.:

上海融德机电工程设备有限公司
SHANGHAI RONGDE ENGINEERING EQUIPMENT CO. LTD CO.,LTD
ADD: DD: Room1401, Xingyu Building No.1 Lane 1695, Pudong Ave Shanghai, China PC: 200135 TEL: 0086-21-68532791 FAX: 0086-21-58212204 E-mail: sale@rongded.con Website: http://www.rongded.com

RONGDE

CDV-2 甲板阀 技术条件 CDV-2 DECK VALVE TECHNICAL SPECIFICATION

Doc.No.:2301-01-0-02

产品信息/ PRODUCT INFORMATIONS: 产品信息 信息/
船 厂/ SHIPYARD: SHIPYARD: 船 名/ SHIP NAME: NAME: 产品名称/ PRODUCT: 产品名称 PRODUCT: 名称/ 产品数量/ Quantities: 产品数量/ Quantities: DAI DUONG JOINT STOCK COMPANY, YIETNAM DYNAMIC OCEAN 05 (油轮/ OIL TANKER) (油轮/ CDV-2 甲板阀/ CDV-2 DECK VALVE 甲板阀/ / 12 只/ 12 PIECES PIECES、

技 术 条 件 TECHNICAL SPECIFICATION
1. 2. 3. 4. 产品名称/ Product name: 产品型号/ Product type: 船级社/ Society class: 环境条件/ Ambient conditions: 甲板阀/ Deck valve CDV-2 CCS 应满足在油轮露天甲板上正常使用的要求 To be capable of operating satisfactorily under the open deck conditions on oil tanker 油类、油气和水,以及同类型介质 Oils, oil-gas, water and equivalent media 露天甲板(货油舱、污水舱顶部) Open deck (on the top of cargo oil tanks or slop tanks) PN 0.2 MPa DN 50 JIS - 5K - 50, B2220-2004 1" 快速接口/ 1" Quick coupling interface 2" 螺纹接口/ 2" Thread interface

4.1 4.2 5. 5.1 5.2 5.3 5.4

环境温度/ Ambient temperature: -25℃ ~ +45℃ 适用介质/ Applicable media: 安装条件/ Installation conditions: 工作压力/ Operation pressure: 公称通径/ Nominal diameter: 连接法兰/ Connection flange: 测量接口/ Measuring interface:

(适用于融德公司油水界面仪和密闭取样器,及同类设备/ Be available for RONGDE UIT meters and Hermetic samplers, or equivalent equipment)

6. 6.1 6.2 6.3 7. 7.1

材料/ Material 阀体/ Valve body: 其他金属件/ Other metals: 密封件/ Seals: 试验项目 外观检查/Visual Inspection: 检查外观,结构,材料,确认符合图纸和设计规格 Examine the lay-out, structure and material for conformity with drawings and design data 0.3 MPa (1.5 倍工作压力/ 1,5 times of

You May Also Find These Documents Helpful

  • Good Essays

    Answers Lab06 BP

    • 1971 Words
    • 17 Pages

    What event within the heart causes the AV valves to open? Ventricular pressure Ͻ atrial pressure…

    • 1971 Words
    • 17 Pages
    Good Essays
  • Powerful Essays

    China plant location. The summary will be the basis for a systems plan for more effective…

    • 2729 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    Unit 4222-371

    • 20924 Words
    • 84 Pages

    Sealed Primary System ............................................Page 18 Open Vent Primary System .....................................Page 19 Domestic Hot Water .................................................Page 20 Electrical ....................................................................Page 21 Functional Flow Charts ............................................Page 24 Installation ................................................................Page 27 Commissioning…

    • 20924 Words
    • 84 Pages
    Powerful Essays
  • Good Essays

    The responses by the American people to the Great Depression varied over the 1930s. From the years 1929-1933 when President Hoover was in power, there was a deep sentiment of cynicism within the country. Hoover failed to properly attend to the needs of the populace and was subsequently replaced by President Roosevelt in 1933. Roosevelt’s charismatic and optimistic demeanour helped set a new national tone of hope, persistence and courage. The American people were known to have taken on this positive spirit throughout the 1930s despite the adversities they faced.…

    • 199 Words
    • 1 Page
    Good Essays
  • Powerful Essays

    FIN680 CASE 43

    • 1494 Words
    • 5 Pages

    Bill Fender, president of Flinder Valves & Controls Inc. (FVC) and Tom Eliot, CEO of RSE International are trying to determine final details on RSE acquisition of FVC. Formal conversation have been going-on for approximately 3 months. During this time they and their respective advisors have:…

    • 1494 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Your client requests your company to present a bond, or banker’s guarantee, for 20% of…

    • 509 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    h7 experiment

    • 636 Words
    • 3 Pages

    • Includes precision valve for precise flow control and a Header Tank for good laminar flow…

    • 636 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Life Cycle Check

    • 17335 Words
    • 70 Pages

    Preface …………………………………………………………….. 2 1. Introduction …………………………………………………… 4 1.1 User guide ……. …………………………………………… 5 2. Choice of product……………………………………………… 6 3. The service provided by the product ………………………… 7 3.1 The functional unit ……………………………………….. 11 3.2 Secondary services………………………………………….. 13 4. The product life cycle ………………………………………….. 15 4.1 Overview of the product life …………………………….. 15 4.2 Interactions with adjoining systems .…………………….. 23 5. Preliminary environmental assessment ……………………. 25 5.1 Materials ……………………………………………………27 5.2 Energy ………………………………………………………. 28 5.3 Chemicals………………………………………………….. 34 5.4 Other…

    • 17335 Words
    • 70 Pages
    Satisfactory Essays
  • Powerful Essays

    2. Anonymous (2011). Bridgestone. Annual Report 2010. Operational Review. pp.02-05. Available:http://www.bridgestone.co.jp/corporate/library/pdf/bs_annual_2010_operational.pdf (accessed 8 November 2011).…

    • 2016 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Bat Tap

    • 505 Words
    • 3 Pages

    Chương 1: Các khái niệm và nguyên lý cơ bản 1.1. Biễu diễn sơ đồ khối của một hệ thống sưởi với các thành phần như sau: • • • • Nhiệt kế - tín hiệu vào là nhiệt độ phòng và tín hiệu ra có dạng ON/OFF Valve solenoid – tín hiệu vào là ON/OFF từ nhiệt kế và tín hiệu ra là dòng khí chảy đến lò sưởi. Phòng – tín hiệu vào là nhiệt từ lò sưởi và tín hiệu ra là nhiệt độ phòng. Lò sưởi – tín hiệu vào là dòng khí và tín hiệu ra là lượng nhiệt truyền vào phòng.…

    • 505 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Wilkerson Case Study1

    • 1513 Words
    • 9 Pages

    1. Valves- high quality and highest tolerances in the industry; this product is what the company started from.…

    • 1513 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    The identification number, model number, and serial number is recorded. Confirm that the equipment delivered and installed conforms to specifications. Materials of Construction: Vendor certification of materials of construction must conform to specifications. Valve Types and Connections: The valve types must conform to specifications. All connections in the equipment and from the equipment to utilities must conform to specifications.…

    • 410 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Life Cycle Cost

    • 1061 Words
    • 5 Pages

    – – – – – – – Engineering (e.g. design and drawings, regulatory issues) The bid process Purchase order administration Testing and inspection Inventory of spare parts Training Auxiliary equipment for cooling and sealing water…

    • 1061 Words
    • 5 Pages
    Better Essays
  • Good Essays

    case: CMI

    • 4826 Words
    • 36 Pages

    U.S. automobiles. Both the Ford and Chrysler valve designs required a high temperature seal to hold…

    • 4826 Words
    • 36 Pages
    Good Essays
  • Satisfactory Essays

    Heat Load

    • 1557 Words
    • 7 Pages

    Supply flowrate [m3/h] 7758 17.5 400 3 50 Not available [l/s] 2155 Face velocity [m/s] 2.51 2490 1370 1200 452.58 1 RH RH 8000 global 69 [dB(A)] 87.9 38 [dB(A)] 77.9 33 [dB(A)] 74.0…

    • 1557 Words
    • 7 Pages
    Satisfactory Essays

Related Topics