A/Prof. Lee Der-Horng TA: LI Siyu (lisiyu@nus.edu.sg)
Department of Civil and Environmental Engineering National University of Singapore
1
NUS Campus Concept Plan 2030 areas: Kent Ridge and UTown New Campus Area
• Current NUS has two major campus • Future development include two new
campus areas. The purpose of such development is to aggregate all education resources nearby and make the new area a major college park. Major deployment of new road, bridge, tunnel and other infrastructure. (2) Improvement of regional public transportation and internal shuttle bus, in terms of route and service level.
• The future development may require: (1)
New Campus Area
Department of Civil and Environmental Engineering National University of Singapore
2
Assignment
You are required to • Determine the study area of the project and breakdown the study area in to traffic
• Design road network for the study area. When necessary, you may add new roads • Wrap all results in VISUM.
analysis zones. Also show your development plan for the campus new areas by specifying the purpose/functionality of each zone. or other infrastructure to existing network.
Deadline: 12 September 2013, 17:00 via IVLE
Department of Civil and Environmental Engineering National University of Singapore
3
Addition Note on Background
You are also encouraged to generate the background yourself.
• Both background picture scaled at 1:6000 and OpenStreetMap file are provided. • VISUM can import OpenStreetMap file, which will ease your pain when drawing all
the stuff by hand. When used with background in combination, the network can be both accurate and readable.