Preview

Chennai Port Details

Satisfactory Essays
Open Document
Open Document
822 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Chennai Port Details
CHENNAI PORT TRUST MARINE DEPARTMENT No.1 Rajaji Salai, Chennai – 600 001.
Website www.chennaiport.gov.in.

No.M/K6/935/2009/SE(Marine)
BUDGETARY OFFER – Budgetary Offer for towing Trust’s Floating Craft ‘Thangam’ as per MMD Rules and Regulations – Called for – Regarding. *****
Chennai Port Trust invites budgetary offers for towing the Trust’s Floating Crane Thangam as per MMD/ Regulations. The Technical details of the FC ‘Thangam’ are furnished below: a) b) c) d) e) f) g) Crane Capacity Length Breadth Draft Weight GRT NRT 150 Ton Main Hook & 40 Ton Auxillary Hook 55 M 22.5 M 2.64 M 1887 Tons 1948 Tons 520 Tons

It is therefore requested to submit your Budgetary Offer on or before 11.03.2011 for towing the FC Thangam as per the attached Schedule ‘A’ and Schedule ‘A1’ (Cost Schedule). For enquiries and any clarifications regarding this you may contact the Marine Engineer (9444418606) on all Trust’s working day between 10.00 hrs and 17.00 hrs. ELIGIBILITY CRITERIA: The firm shall have the class certification for carrying out these jobs and also approved by DG Shipping/IRS OR the firm shall have minimum three years experience in the relevant categories of works. Documentary proof for the same may be attached along with the offer. (The detail of such works carried out in the last 3 years).

DEPUTY CONSERVATOR CHENNAI PORT TRUST.

Specifications for towing Trust’s Floating Craft ‘Thangam’ as per MMD Rules and Regulations. SCHEDULE - A Chennai Port Trust invites budgetary offers as per the enclosed Schedule – A1 format for towing its Floating Crane Thangam as per MMD/ Regulations for dry docking in any one of the following Dry Docks/Ship Repair Yards: 1) 2) 3) 4) 5) 6) 7) 8) Hindustan Shipyard, Vizag Garden Reach Ship Builders & Engineer, Kolkatta Hoogly Dock & Port Engineers, Kolkatta Shalimar Works, Kolkatta Cochin Shipyard, Cochin Goa Shipyard, Goa Aclock Ashdown, Gujarat Mazagon Docks, Mumbai

The Principal parameters of the Craft are as follows: a) b)

You May Also Find These Documents Helpful

  • Good Essays

    Now, you may have come to know where towing services are taken. There are many goods and products that are unable to be loaded by labors, there needs a service which can easily lift up quintals heavy goods and put it comfortably at the targeted place. If you have ever gone to warehouses or to a harbor, you would have found containers of the largest size, have you ever thought, how these containers are moved from one place to another, of course with the towing service. Towing services bring many benefits to logistic and transportation services.…

    • 418 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    The Boat Harbour element of the project is proposed to be developed in three stages and includes an Inner…

    • 2444 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    Resume Mehanical Engg

    • 600 Words
    • 3 Pages

    • Researched on structural mechanics and used advanced mathematics to design a scaled crane catalogue in AutoCAD to ease the planning of onsite crane operations in rural Mauritius, which was approved by the engineering manager…

    • 600 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Branch Tech Case

    • 528 Words
    • 3 Pages

    The cranes use huge claws to move the shipping containers onto the giant barges. Smaller trucks transport the containers to the base of the crane on the dock. The cranes take them off of the truck and are able to position them onto the barge in an orderly fashion. The aerial view from the operation deck allows the workers to position the containers on the boat in a fashion that reduces the extra space allowing the boat the carry more. Drone’s use precise measurement and transports the information back to the crane operator which allows them to place within centimeters without bumping. This process has helped in transporting with less freight damage. The overall placement is precise and the closeness of the containers allows for little movement during…

    • 528 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Meli Marine Case Study

    • 1391 Words
    • 6 Pages

    • Global commerce trade is primarly dependent on trans-ocean shipping; roughly 90% of general cargo is shipped via container Based on the container shipping value chain, there are several segments to expand and integrate the business and enter the market. This would provide benefit of business diversification hence decreasing risks According to the volume of growth of shipping lanes (Exhibit 6), every lane has steadily increased during the last years and is expected to grow further in the future…

    • 1391 Words
    • 6 Pages
    Satisfactory Essays
  • Powerful Essays

    Meli Marine

    • 4486 Words
    • 18 Pages

    Teeh-Sah indicated that pricing for the 16 vessels would be attractive. The question that David Tian…

    • 4486 Words
    • 18 Pages
    Powerful Essays
  • Powerful Essays

    Career Episode

    • 4424 Words
    • 18 Pages

    CAREER EPISODE No.1 PIRANHA HANGAR BASE CONSTRUCTION PROJECT Place in Colombia INTRODUCTION 1. This first episode is based on my experience as Project and Quality control Manager for the project related to th construction of two piranha hangar base. This project was executed by XXX, the Company which I worked for, and the Contractor was the ZZZ. This construction project took place from August 2004 to August 2005. BACKGROUND 2. The main scope of this project was to build two hangar bases for “piranha” motor boats. These hangar bases provided different facilities to military personnel that need some support during their military operations and each one had fuel storage and supply facilities, warehouse, dinning and temporary housing facilities .Thus, it was necessary to build a potable water system, sanitary system, fuel storage and distribution system, air conditioning system, bilge and ballast system, electrical network, including generator set. Hull, deck and roof structure were built on steel structure with different specs and coating schema. Each piranha hangar base weighted 209 tons and had two storeys. 3. The Hull was composed by five pontoons each one of 8 meters length x 1.20 meters width x1.5 meters depth and a main section of 24 meters length x 3.5 meters width x 1.5 meters depth. Each pontoon had a specific function, pontoon number 3 was designed for sewage system, pontoon five was used for ballast system and included sea box. Inside other pontoons there were installed pipe lines for fuel, sanitary, electrical, bilge and ballast system. Hull main section was designed to fuel and…

    • 4424 Words
    • 18 Pages
    Powerful Essays
  • Good Essays

    Port Jackson

    • 1023 Words
    • 5 Pages

    On the 13th of May, in 1787, the British Government sent a fleet of 11 ships on a mission to start up a new colony led by Captain Arthur Phillip. Captain Arthur Phillip was born on the 11th of October, 1738, in London. Phillip went to school at Greenwich and later served an apprenticeship in the merchant navy. He was then transferred to the Royal Navy during the Seven Years War but then retired to become a farmer in Hampshire. After he served his time as Captain in the Portuguese Navy, Phillip re-joined the Royal Navy. Phillip was then asked to be governor of the penal colony at Botany Bay which brings us back to our story.…

    • 1023 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Regal Marine’

    • 500 Words
    • 2 Pages

    “With great innovation and leadership development to enhance a diverse cognizant membership, “Regal Marine” strives to preserve and promote an inclusive environment for its member”…

    • 500 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Unknown. (2009, 01 08). Visionary Concepts for Vessels and Floating Structures. Retrieved 03 05, 2010, from IVT: http://www.ivt.ntnu.no/imt/courses/tmr4850/Visions%202009/BA1-Scenarios.pdf…

    • 3167 Words
    • 13 Pages
    Better Essays
  • Powerful Essays

    Asbatankvoy Charter Party

    • 5750 Words
    • 23 Pages

    IT IS THIS DAY AGREED between ...................................... chartered owner/owner (hereinafter called the "Owner") of the SS/MS ..............................(hereinafter called the "Vessel") and ............................ (hereinafter called the "Charterer") that the transportation herein provided for will be performed subject to the terms and condition of this Charter Party, which includes this Preamble and Part I and Part II. In the event of a conflict, the provisions of Part I will prevail over those contained in Part II. PARTI A Description and Position of Vessel: Deadweight: tons (2240 lbs.) Classed: Loaded draft of Vessel on assigned summer freeboard ft in. in salt water. Capacity for cargo: tons (of 2240 lbs. each) .....% more or less, Vessels option. Coated: 0 Yes 0 No Coiled: 0 Yes 0 No Last two cargoes: ....... Now: .................... Expected ready: .........…

    • 5750 Words
    • 23 Pages
    Powerful Essays
  • Satisfactory Essays

    ASSISTANT GENERAL MANAGER (For Sanction) : Relationship Manager (ME) (For Recommendation) : Forex Department (For Necessary Action) : NEGOTIATION UNDER LC |01. |Name of the Applicant |: |SVR ELECTRICALS PVT LTD | | | | |Account No. 30118412067 | |02. |Group, if any |: |None | |03. |Registered Office at |: |PLOT NO. 14, BLOCK NO.37, IDA, | | | | |AUTO NAGAR, GUNTUR – 522 001 | |04. |LC No. |: |IL/A 037197…

    • 652 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    • Estimated cost: HK$8.2 Billion • Terminal Building and first berth to be commissioned in mid 2013 • Second berth will be commissioned in 2014…

    • 313 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Case Study: Underpinning

    • 1533 Words
    • 7 Pages

    : Projek Mass Rapid Transit Lembah Kelang : Jajaran Sungai Buloh-Kajang (Underground Works-Installation of Micro Pile For Underpinning Works…

    • 1533 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    Starting as a dredging operating company, HSL has progressed over thirty years to become a leader in this engineering market field in Sarawak. The company has technical expertise, qualified staff, a comprehensive portfolio of marine equipment and necessary official registrations and licenses. This includes the licenses of PKK, JKR Class A and LLYOD’S Register Quality Assurance ISO9001 to enable the group in undertaking road projects of any size. Besides that, HSL has both state (UPK) and national (PKK G7, CIDB) accreditation. These are essential to perform most of the projects in Sarawak.…

    • 1047 Words
    • 5 Pages
    Better Essays