Construction Industry Payment
CIPAA

The Proposed Enactment of CONSTRUCTION INDUSTRY PAYMENT AND ADJUDICATION ACT (CIPAA) CIPAA Background The Government has long realized problems facing parties to construction contracts in securing regular and timely payment that impacts cash flow during project implementation. In ensuring the smooth implementation of construction projects, problems of this nature must be addressed especially at the onset of the 10th Malaysia Plan. On 15th July 2009, Cabinet has agreed that CIPAA be enacted to resolve payment problems in construction industry. Following that, CIPAA has first read in the parliament on 1st December last year and read the second time in parliament on 2nd April 2012. [1] The Master Builders Association Malaysia (MBAM) wants Works Minister Datuk Seri Shaziman Abu Mansor to announce the taking effect and enforcement of the Construction Industry Payment and Adjudication Act (CIPAA).

The MBAM has also indicated it should happen, preferably, in the beginning of 2013.

"The MBAM thanks the government for the enactment of this statute which was gazetted on June 22 this year.

"The CIPAA has been long awaited by the construction industry to arrest the pervasive prevailing payment problems. [2]

Purpose of CIPAA 1. To Facilitate Regular and Timely Payment 2. To Provide a Mechanism for Speedy Dispute Resolution Through Adjudication 3. To Provide Remedies for the Recovery of Payment in the Construction Industry Scope of the CIPAA Bill Covers all construction contracts made in writing that relates to construction work carried out wholly or partly within territory of Malaysia including one that is entered into by the Government Malaysia is governed by the proposed Act. Includes local and international construction contracts. It does not apply to construction contracts entered into by a natural person for any construction work in respect of any building which is less than four storey’s high and which is

You May Also Find These Documents Helpful

  • Good Essays

    This project plans to develop a methodology to estimate future projects’ costs and their appropriate contingency reserves for changing prices in constructional projects. Based on the methodology, recommendations will be given in order to change Ministry of Construction’s policies that relates to project budgets, and how to deal with the current policies if they are not changed.…

    • 311 Words
    • 2 Pages
    Good Essays
  • Good Essays

    (Mondy, 68). In many circumstances, the OFCCP commands an AAP based on three levels of control. In this first level of control, contracts exceed $10,000 but are less than $50,000 and in this level, contractors are guided by the equal opportunity clause. The second level transpires if the contractor meets one of the following requirements if the organization has 50 or more employees, has a contract of $50,000 or more, has contracts that total $50,000 within a 12-month period, or is a financial institution that deposits any amount in government funds. The last level occurs when contracts exceed $1 million in addition to all stated requirements being met. This third and final level also gives the OFCCP the right to authorize a conduction of compliance reviews. In this particular scenario, Supreme Construction falls under the third level category and must submit an AAP because the bid accepted totaled over $1…

    • 684 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Annotated Bibliography

    • 680 Words
    • 3 Pages

    Assaf, S.A. and Al-Hejji, S. (2006) Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-57.…

    • 680 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Applied Law Essay

    • 2763 Words
    • 12 Pages

    A person must not carry out, or undertake to carry out, building work unless that person holds a contractor's licence of the appropriate class under this Act.…

    • 2763 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    2.4 What type of bond guarantees that if a contractor goes broke on a project the surety will pay the necessary amount to complete the job?…

    • 735 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    References: [1] North S, Winch GM, Dawood N, Heesom D, Kelsey J, Sriprasert S, Technical evaluation: VIRCON Task 12 report UMIST, a VIRCON project report, 2003. [2] Laufer A, Howell GA, Rosenfeld Y. Three modes of short-term construction planning. Constr Manage Econ 1992;10:249–62. [3] Laufer A, Tucker RL. Is construction project planning really doing its job? A critical examination of focus, role and process. Constr Manage Econ 1987;5:243–66. [4] Laufer A, Tucker RL, Shapira A, Shenhar AJ. The multiplicity concept in construction project planning. Constr Manage Econ 1994;12:53–65. [5] Laufer A, Tucker RL. Competence and timing dilemma in construction planning. Constr Manage Econ 1988;6:339–55. [6] Laufer A. A micro view of the project planning process. Constr Manage Econ 1992;10:31–43. [7] Turner JR. The handbook of project-based management. 2nd ed.. London: McGraw-Hill; 1999. [8] Winch GM. Managing construction projects: an information processing approach. Oxford: Blackwell Science; 2002. [9] Goldratt EM. Critical chain great. Barrington: The North River Press; 1997. [10] Barber P, Tomkins C, Graves A. Decentralised site management – a case study International. J Proj Manage 1999;17:113–20. [11] Ballard G, Howell G. Shielding production: essential step in production control. J Constr Eng Manage 1998;124:11–7. [12] Faniran OO, Love PED, Li H. Optimal allocation of construction planning resources. J Constr Eng Manage 1999;125:311–9. [13] Kelsey J, Winch G, Penn A. Understanding the project planning process: requirements capture for the virtual construction site Bartlett research paper 15, a VIRCON project report: University College London; 2001. [14] Heesom D, Mahdjoubi L. Technology opportunities and potential volume 2: project planning software, a VIRCON project report: University of Wolverhampton; 2002. [15] Rummler GA, Brache AP. Improving performance: how to manage the white space on the organization chart. San Francisco: Jossey-Bass; 1995. [16] Winch GM, Carr B. Processes maps and protocols: understanding the shape of the construction process. Constr Manage Econ 2001;19:519–31.…

    • 6037 Words
    • 25 Pages
    Powerful Essays
  • Good Essays

    Contracts involving interests in land – The statute applies to any contract for an interest in real estate.…

    • 408 Words
    • 2 Pages
    Good Essays
  • Good Essays

    As I looked into my boyfriends eyes out in 30 degree weather, in a city we have never been to, I realized how lucky I was to be celebrating my birthday in this one of a kind place, New York City. Two eighteen-year-old kids exploring this wonderful and large city all by ourselves. What could possibly go wrong? The subway got closed down unexpectedly when we needed to get back to our hotel room in order to make it on time to the untold musical story of the Wizard of OZ, “Wicked” so, we decided to just walk from Chinatown to Manhattan (where the hotel we were staying at was). Although it was a long and tiring walk, we enjoyed ourselves with all the blankets of snow covering the streets. It was our first time seeing snow. After we got back,…

    • 601 Words
    • 3 Pages
    Good Essays
  • Good Essays

    According to Institute of Construction Training and Development (ICTAD) there are about 2500 registered contractors .only 5% of them are graded as major contractors like MAGA,ACCESS,ICC…..All of them have handled nealy US $ 4billion projects during 2011.…

    • 908 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    A paper based on a lecture delivered on 24 May 2003 in Seremban to The Institution of Engineers, Malaysia (Negri Sembilan Branch)…

    • 6266 Words
    • 26 Pages
    Powerful Essays
  • Best Essays

    5) Sohail, M., & Cavill, S. 2008, ‘Accountability to Prevent Corruption in Construction Projects’ Journal of Construction Engineering & Management, Vol. 134 Issue 9, p729-738, EBSCOhost viewed September 25, 2008…

    • 1659 Words
    • 7 Pages
    Best Essays
  • Better Essays

    There are some concerns regarding the legislation issues. The construction law is considered by many specialists as too complicated and not coherent and large part of companies regard it as a great cause for concern. At this moment the legislation for the construction industry is considered as the weakest point by some of the agencies (Poland’s score at for Legal and Regulatory risks is 51.2 out of 100 according to Business Monitor International). To sum up, one of the biggest problems plaguing…

    • 1824 Words
    • 8 Pages
    Better Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Contractors Requirements

    • 3153 Words
    • 14 Pages

    The intended construction work falls within the scope of “construction work” as defined in the Construction Regulations, 2014 made under the Occupational Health and Safety Act 1993.…

    • 3153 Words
    • 14 Pages
    Powerful Essays
  • Powerful Essays

    Civil Engineering Practice

    • 6078 Words
    • 25 Pages

    The project conception lies solely in the hands of the Promoter. As he is the key member of any team engaged in a construction project and will need to establish means of acting efficiently within the team to ensure the success of the project. This period requires his close involvement. And generally, will consume the greater proportion of the total pre-contract duration.…

    • 6078 Words
    • 25 Pages
    Powerful Essays

Related Topics