1. INTRODUCTION: The project titled ‘The Agora Mall’ in Dubai is taken up for the construction project analysis. The project initiated in 2006 at the prime boom time taken up the ground works by early 2007 but ultimately got suspended in 2012 due to prolonged financial and other related issues which are covered in detail in the following sections. The present stage of the project is at basement level that too under partial completion and awaiting financial assistance from a leading bank in Dubai with whom the Employer has a financial tie up. The project been promoted by Ahmed Ramadhan Juma (ARJ) group having head office in Dubai, United Arab Emirates and according to the company website was found in 1964 headed by the Chairman and comprise of board members from the family and the core management team comprise of financial managers and engineers with the total work force around 1000 personnel covering the various trades operated by the organisation. The above mentioned project falls under the real estate division of the organisation developing retail, commercial & residential properties in Dubai’s prime areas such as Silicon oasis, Dubai marina and Jumeriah where the topic project is located. The project was the brain child of the founder and the Chairman of the ARJ group in the year 2006 who passed away in 2010 during its construction period and was taken up by his two sons who were the then board of directors promoted as Chairman and Managing Director respectively. The presenter of this project analysis was an employee of the Local Consultant at the capacity of Quantity surveyor till 2009 and was still in touch with the ex-colleagues to know about the



References: 1. Ahmed Ramadhan Juma Group : Employer of the project ‘The Agora Mall’ http://www.arjgroup.com/ 2. Modern Executive Systems Contracting LLC : Main Contractor for the project http://www.mesc.ae/en/ProjectDetails.aspx?pid=176 11 feet meters 600 200

You May Also Find These Documents Helpful

  • Powerful Essays

    Hnc Forms of Construction

    • 3301 Words
    • 14 Pages

    Contents 1.0 Introduction 2.0 Methodology 3.0 Inception 4.0 Feasibility 4.1 Overview of stage 4.2 Assessing the feasibility 4.3 Site investigation 4.4 Effects on design 5.0 Then brief 5.1 Overview of stage 5.2 What the brief should cover 5.3 What the brief should include 5.4 Consultants at this stage 6.0 The concept/outline proposals 6.1 Overview of stage 6.2 Requirements to proceed with concept design 6.3 Developing the brief into concept design 6.4 Planning permission 6.5 Building regulations approval 6.6 Achieved at this point 7.0 The design development 7.1 Overview of stage 7.2 Developing the design 7.3 Finalisation of design 7.4 Planning proposal 7.5 Building regulations 7.6 Sampling and testing 7.7 Health and Safety 7.8 Achieved at this stage 8.0 Technical design 8.1 Overview of stage 8.2 Implications on design 9.0 Production phase 9.1 Overview of stage 9.2 Design implications 10 Other construction projects…

    • 3301 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    This project plans to develop a methodology to estimate future projects’ costs and their appropriate contingency reserves for changing prices in constructional projects. Based on the methodology, recommendations will be given in order to change Ministry of Construction’s policies that relates to project budgets, and how to deal with the current policies if they are not changed.…

    • 311 Words
    • 2 Pages
    Good Essays
  • Good Essays

    ��������������������������������������������������������������������������������������������������������������������������������������������������������������� 36 10 Who are the stakeholders?�������������������������������������������������������������������������������������������������������������������������������������������������������������������������� 37 11 The project team’s perspective ������������������������������������������������������������������������������������������������������������������������������������������������������������������� 38 12 Performance ������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������ 41 13 Risk��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� 43 14 Resilience and adaptability ������������������������������������������������������������������������������������������������������������������������������������������������������������������������� 45 15 Value for money ������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� 47 PART 3: BUILDING DESIGN 16 General design considerations ������������������������������������������������������������������������������������������������������������������������������������������������������������������� 50 17 Core facilities…

    • 25693 Words
    • 103 Pages
    Good Essays
  • Powerful Essays

    Construction Congress, Walsh, K. D., American Society of Civil Engineers., M.E. Rinker, Sr. School of Building Construction., & International Council for Building Research, Studies and Documentation. (2000). Construction Congress VI: Building together for a better tomorrow in an increasingly complex world : proceedings of the congress : February 20-22, 2000, Orlando, Florida. Reston, Va: The Society.…

    • 1188 Words
    • 5 Pages
    Powerful Essays
  • Better Essays

    3. Customer perspective: Commercial Building project could give us a way to provide better product and service quality, timeliness of project deliverables, degree of satisfaction in customer business relationships, and image and reputation in the…

    • 816 Words
    • 4 Pages
    Better Essays
  • Satisfactory Essays

    Construction and installation methods are identified which optimise the economical use of resources & meet statutory & contractual requirements Methods of construction: sequencing of work; organisation of resources (labour, plant, materials, finance); construction & installation techniques; temporary works…

    • 739 Words
    • 3 Pages
    Satisfactory Essays
  • Best Essays

    The paper discuss the need and justification of the PMP for this construction project, areas that are discussed further in this paper are the audiences of the PMP and why they need to sight the PMP, the major stakeholder, the project owner (Village Investments) is found to be the main audience for this projects as the project owner needs to approve the PMP for the project to continue. In the last section of the body of the paper, it identifies the PMBOK guide as the base of the structure and contents of the PMP, it identify the PMBOK’s nine functions of project management are in the Clift’s PMP in some way with the major function having a lot more detail put into them. The major functions discuss were scope, time, cost, HR, quality and procurement management. One major lesson to be learnt is in the HR management plan with the stakeholder analysis, the school next to the car park was not inputted into the analysis and issues occurred with the closure of the access point to the school, the project anger needs to spend more time on external orientation of the stakeholder analysis to reduce issues in the future. The project manger had a simple PMP that was useful within the budget restraints and time allocated to prepare it, if more time was allowed in preparing this plan some issues during the project may have been reduced or stopped.…

    • 3230 Words
    • 13 Pages
    Best Essays
  • Good Essays

    Riba Design

    • 574 Words
    • 3 Pages

    Construction strategy needs to be cinsidered including offsite fabrication and develop health and safety strategy. Sustainability strategy is the strategy for delivering the sustainability aspirations. Maintenance and operational strategy is the strategy for the maintenance and operation of a building, including details of any specific plant required to replace components. Handover strategy and risk assessments have already been defined. Research and development is project-specific research and development responding to the initial project brief or in response to the concept design as it develops. Project execution plan is produced along with the project lead and lead designer. The construction strategy is a strategy which considers certain aspects of a design that may affect the building or logistics of a construction project or possible the health and safety aspects. The health and safety strategy covers all aspects of health and safety on a project. The sustainability checkpoint for this stage is 2 and the information exchanges demand the concept design including defined structural and building services design, related project strategies, preliminary cost information and final project…

    • 574 Words
    • 3 Pages
    Good Essays
  • Best Essays

    “I am Burj Khalifa,” reads the last line of a quote imprinted on a wall of the building to which the quote refers. A perfect quote, that personifies a building that in its short lifetime (its doors opened only three years ago) has generated many decades worth of criticism and opinion. If this quote seems arrogant or conceited, that is perhaps exactly what the Burj Khalifa wants, and standing as the world’s tallest building by a staggering 1000 feet, it has every right to be. Designed by Adrian Smith, formerly of the firm Skidmore, Owings, and Merrill, the Burj Khalifa has been a headline grabber ever since developer Emaar Properties initiated a design competition for its architect. The Burj Khalifa, or Burj Dubai as originally intended, certainly has its merits aesthetically and in terms of engineering prowess, however much of its criticism has been with the political and economic circumstances surrounding its construction and opening. It may seem impossible to overlook a building that soars half a mile into the sky, but that, in a sense, is what has happened to the Burj Khalifa.…

    • 3681 Words
    • 15 Pages
    Best Essays
  • Powerful Essays

    Construction Economics

    • 1230 Words
    • 5 Pages

    c) Use graphical illustrations to examine the impacts of supply and demand on construction industry…

    • 1230 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Bahrain Bay Case

    • 440 Words
    • 2 Pages

    Bahrain Bay’s mission is to develop an island into a vibrant metropolitan location and to attract investors around the world. Moreover there goal is to create a long-vision term and a long-term ecinomic success for everyone. By embrasing high development and archtectural standards their goal is to construct one of the world’s most sought after residential, commercial and retail properties.…

    • 440 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Architecture

    • 939 Words
    • 4 Pages

    The architecture of a country acts like a mirror for understanding the way of living and also the developments of the place that have led to the creation of the country as it looks today. The architecture of a country gives an insight into a country's developments over the years. Many times architecture also helps us predict what type of traditions have been followed in the country over a large span of time. The thesis mainly deals with analyzing whether the direction of development of architecture taken by UAE after seeing an oil boom is justified or not with an aim to understand the role of oil boom in the development of UAE's architecture. The thesis also deals with analyzing whether the country has lost its traditional heritage by building highly modernized buildings. The thesis deals with the important topic of deciding whether a country should go with its traditional methods or would go towards highly modernized architecture in order to attract larger number of tourists and earn higher revenues or should it maintain its traditional architecture which is unique to a country. In my view for a country it is important to plan its architecture in a way that it promotes revenues and also keeps some uniqueness for the country this could be achieved only when the country's planners decide to develop their architecture keeping in mind the traditions of the country.…

    • 939 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Parliament selected the Architect and design involved various stake holder in the process and entrusted the construction company to implement the same design. The total cost of the project was £50million and construction was not responsible for any of the decisions including of course site, design, cost, time etc. Company completed the work 2 years later than the schedule with almost 10 times cost over run.…

    • 511 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    spoohv

    • 54337 Words
    • 245 Pages

    Giddens, A (1991) Modernity and self-identity : self and society in the late modern age.…

    • 54337 Words
    • 245 Pages
    Good Essays
  • Satisfactory Essays

    Resume Architecture

    • 794 Words
    • 4 Pages

    DUTIES AND RESPONSIBILITIES To meet new clients and take their requirements & measurements and present the conceptual plan to the client.  To prepare design/drawings, specifications and other construction documents for the use of contractors and present the same to clients/ contractors.  To supervise and monitor the construction/execution of Project on site and coordinate with clients/ contractors.  To supervise and coordinate with staff/ consultants for preparation of drawings and related documents.  To conduct feasibility studies and financial analyses of the building project.  To settle fee for services and collect payments from the Clients on behalf of firm as and when due and deposit in the bank account of Ideal arch.  To maintain accounts of expenditures/receipts.  To submit a weekly status report with respect to all the projects. PROJECTS UNDERTAKEN RESIDENTIAL:  Construction and interiors for the residence for Mr. Neeraj Nayyar at Chheherta, Amritsar.  Construction and Interiors, residence for Mr. Kuljit Singh at Garden Estate, Amritsar.  Renovation and Interiors for the residence for Mr. Ravi Katari at Model Town in Ludhiana. COMMERCIAL  50 bedded Hospital for Dr. Anil Marwaha at Pakhowal road Batala.  Hotel Raj Tirath Residency, near Golden Temple in Amritsar …

    • 794 Words
    • 4 Pages
    Satisfactory Essays