PROPOSED PROJECT: PROPOSED TWO STOREY RESIDENCE
OWNER:
LOCATION:

GENERAL SPECIFICATION

This set of Specifications shall govern the methods of construction and the kind of materials to be used for the proposed project shown on the accompanying plans and details drawings. The plans, details drawings and the Specifications shall be considered as complementing each other so that what is mentioned or shown in one, although not mentioned or shown in the other, shall be considered as appearing in both. In case of conflict between the two, the same should be referred to the designing Architect / Engineer for clarification.

GENERAL CONDITIONS

All parts of the construction shall be finished with first class workmanship to the fullest talent and meaning of the plan and Specification, and to the entire satisfaction of the Architect / Engineer and the owner.

Any defective material or poor workmanship shall be replaced or improved by the Contractor without additional cost for the owner.

The construction shall conform to all the requirements of the National Building Code, as well as the rules and regulations in the locality.

CLEARING THE SITE

The building site shall be leveled according to the plans, and cleared of rubbish, roots and other perishable and objectionable matters to a suitable grade.

Such unsuitable materials shall be spread over the areas adjacent to the proposed building, or disposed of as may be directed by the Architect or Engineer in charge of the construction.

STEAKING OUT THE BUILDING LINES

The building lines shall be staked out and all lines and grades shown in the drawing established before any excavation is started. Batter board reference marks shall be erected at such places where they will not be disturbed during the excavation of the building’s foundation.

EXCAVATION

All excavation shall be made

You May Also Find These Documents Helpful

  • Good Essays

    Nt1330 Unit 5

    • 800 Words
    • 4 Pages

    5. Are there any encroachments between the structure and 900mm of the site boundary or 1.8m of other buildings in the same allotment? (Except Facias, gutters, downpipes, eves with non-combustible linings, flues, chimneys, pipes. Domestic fuel tanks cooling or heating appliances, light fittings,…

    • 800 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Once the owners and the general contractor have selected an electrician, plumber, and master carpenter, they will all meet to review the architectural plan and make any necessary changes. At this time the plan will be submitted to the city for approval. After approval is received, excavation is completed, and the actual construction has begun, the owners will have weekly meetings with the general contractor to closely monitor the progress of the…

    • 1988 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Quote Invocare 250714

    • 2058 Words
    • 9 Pages

    Building owners must satisfy themselves that the recommendations are appropriate for their application. By referencing this…

    • 2058 Words
    • 9 Pages
    Good Essays
  • Satisfactory Essays

    bubbaganoosh

    • 515 Words
    • 3 Pages

    Urban Constructions has several policies, procedures and practices in place to protect the client, suppliers, our staff and our contractors. Limitations placed upon our team can restrict the project to what it will produce. To make this subdivision successful, we must follow these procedures.…

    • 515 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    8 CONSULTANT’S PROPOSED DESIGN & CONSTRUCTION SCHEDULE ........................... 8 CONSULTANT DESIGN SCHEDULE ........................................................................................ 9 BID DOCUMENT CONSTRUCTION SCHEDULE…

    • 13739 Words
    • 88 Pages
    Powerful Essays
  • Powerful Essays

    Rfp Inventory Control

    • 5649 Words
    • 23 Pages

    The following section entails information that Just Seeds Unlimited Co. requires of bidders when preparing the response bid proposal:…

    • 5649 Words
    • 23 Pages
    Powerful Essays
  • Good Essays

    Demolition. Demolition of buildings {describe permanent structure(s)} within the Subject Area shall not be permitted.…

    • 1325 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    Arb Part 1 Sample

    • 3118 Words
    • 13 Pages

    • Researched information informs the design; with guidelines/constraints, such as Local Authority and Conservation Policy (A9), along with specialist consultant’s reports – including Day Lighting and Sunlighting Report (dealing with potential changes in lighting) (A20), and the Arboricultural Report (A21) (detailing construction proximity in conjunction with a Tree Preservation Order)…

    • 3118 Words
    • 13 Pages
    Powerful Essays
  • Good Essays

    Bolene

    • 1986 Words
    • 8 Pages

    The following planning and designing principles should be considered when building or renovating school facilities.…

    • 1986 Words
    • 8 Pages
    Good Essays
  • Powerful Essays

    busi 414 final paper

    • 3812 Words
    • 11 Pages

    A quality plan is a document that is unique to every construction project (Chung, 1999). In the construction industry, the owner, or his perspective representative’s, such as the architect or engineer, indicate in the contract what must be included in the quality plan (Chung, 1999). A quality plan should be drawn up, or at least a draft of the plan, should be drawn up and submitted to the client with the bid documents. Chung (1999) feels that this will show the client the contractors’ dedications to quality in the project. He also believes that the key elements of the project quality plan is the companies’ quality manual, quality procedures, statutory regulations, inspection and test plan, and procedures specific to the project. When drafting the project plan, the project manager must keep in mind that the quality plan should be updated periodically to ensure it encompasses contract changes (Chung, 1999).…

    • 3812 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    building a new structure

    • 1808 Words
    • 8 Pages

    (a) The successful contractor must be a certified installer of the infrastructure components being provided and show proof thereof.…

    • 1808 Words
    • 8 Pages
    Good Essays
  • Better Essays

    When designing buildings, engineers are obliged to follow the National Society of Professional Engineers (NSPE) canons of ethics. (Accredation Board of Engineers and Technology, 1977)…

    • 1817 Words
    • 8 Pages
    Better Essays
  • Good Essays

    The company guarantees materials and workmanship will meet the specification that are requires for the upcoming contract if they are giving it.…

    • 1010 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Before beginning construction civil engineers plan layout and every other aspect of a building. As the article “Architecture (building)” on Microsoft® Encarta® remarks “Architecture must satisfy its intended uses, must be technically sound, and must convey aesthetic meaning” because “Architecture is a social art” (page 1 of 19). Structural engineers are principally concerned with the structural form of a building, whereas architects are concerned with the integration of the building functions, form, mechanical system, as well as the building itself. It is through their collaboration that complex building can be designed. Designing the overall frame of a building is the first step in constructing a viable and stable structure. According with the Attila Lawrence’s article on the “architectureweeek” web page, “ In today’s competitive business environment, corporate cultures tend to focus on improving product quality while minimizing costs and managing risks”, (page 1 of 2). Furthermore, the English poet Sir Henry Wotton said: “ Well building have three conditions: Commoditie, Firmenes, and Delight” (qtd. In Architecture (building) page 1 of 19). Structure and aesthetics of a building are related through efficiency, lightness, elegance, and the principles of minimizing weight and using the least material possible to control cost. Civil engineers and architects together design in detail the various components of a building…

    • 1200 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Note on Re Wall Work

    • 20222 Words
    • 81 Pages

    Users of various civil engineering codes have been feeling the need for explanatory handbooks and other compilations based on Indian Standards. The need has been further emphasized in view of the publication of the National Building Code of India in 1970 and its implementation. The Expert Group set up in 1972 by the Department of Science and Technology, Government of India carried out in-depth studies in various areas of civil engineering and construction practices. During the preparation of the Fifth Five-Year Plan in 1975, the Group was assigned the task of producing a Science and Technology plan for research, development and extension work in the sector of housing and construction technology. One of the items of this plan was the production of design handbooks, explanatory handbooks and design aids based on the National Building Code and various Indian Standards and other activities in the promotion of the National Building Code. The Expert Group gave high priority to this item and on the recommendation of the Department of Science and Technology, the Planning Commission approved the following two projects which were assigned to the Bureau of Indian Standards : a) Development programmc on engineering construction, and b) Typification for industrial code implementation for building and civil…