COST OVERRUN FACTORS AND PROJECT COST R
COST OVERRUN FACTORS AND PROJECT COST RISK ASSESSMENT IN CONSTRUCTION INDUSTRY - A STATE OF THE ART REVIEW
SAVITA SHARMA
1
& PRADEEP K. GOYAL
2

1
Senior Lecturer, Department of Civil Engineering, Govt. Polytechnic College, Ajmer, Rajasthan, India
2
Associate Professor, Department of Civil Engineering, Govt. Engineering College, Ajmer, Rajasthan, India
ABSTRACT
This paper presents a state of the art review of major and frequently occurred cost overrun factors and project cost risk assessment models in construction projects. Construction industries play an important role in economic growth and development of any country. Recently it has witnessed that a large number of construction projects are facing the problem of cost overrun due to some factors. These factors are associated with some form of risk and uncertainty of the project. Therefore, project cost risk assessment is an important step for making decision in construction projects. Findings from the review are presented in form of tables and charts that classify cost overrun factors, ranking of the cost overrun factors. Project Cost risk assessment models and applicability of the past studies in Indian construction industry are also discussed. Then, directions for further future research for India is introduced.
KEYWORDS:
Cost Overrun, Risk Assessment, Construction Industry, Modelling, Fuzzy Logic INTRODUCTION
The infrastructural development and socio-economic progress of a nation utterly depend upon the conceptual visualization of major projects. Construction industries play an important role in economic growth and development of any country especially for developing countries like, India. In recent development, witnessed globally, it is observed that the construction industry has become one of the largest industries and its contribution is more than 10% of global economy. On account of characteristics possessed by the construction industry it is very prone to risk and uncertainty. Such

You May Also Find These Documents Helpful

  • Best Essays

    Patterson, Dan. Managing Project Cost Risk. Morgantown, US, 2006. Last updated 2010-06-07. Copyright American Association of Cost Engineers 2006. ProQuest Document ID 208172428.…

    • 1664 Words
    • 7 Pages
    Best Essays
  • Satisfactory Essays

    Increased cost and time are a major concern in this project, the probability is low however, if it does occur the impact will be quite high, because it will definitely cause an overrun in the budget and or missed schedule. This risk can be mitigated by closely monitoring the budget against the actual cost and making sure that the project is always within the allocated cost and on schedule.…

    • 311 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Unit 6 Assignment 2

    • 878 Words
    • 4 Pages

    Without going into details regarding the theory of project risk management we present still, the definition of this concept as it is proposed by the Project Management Institute professionals who, in The Project Management Body of Knowledge Guide, [Duncan, W., R.,…

    • 878 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    One of the most important factors to the success of a project is how well the project is estimated, as well as how overall costs are managed during the execution phase by the project manager. Project costs and estimates are vital to the success of any organization to remain competitive in the market. Cost estimating for organizations rely heavily on resources that can sometimes be difficult to obtain. Forecasting and utilizing historical return costs are just a couple of ways that organizations rely on estimating. Experienced planners are often a sought trade within the market; this paper will discuss some often used project cost estimating techniques.…

    • 746 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    References: Kendrick, T. (2009). Identifying and managing project risk. (2nd ed., pp.2-89). New York: AMACOM.…

    • 1379 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    This project plans to develop a methodology to estimate future projects’ costs and their appropriate contingency reserves for changing prices in constructional projects. Based on the methodology, recommendations will be given in order to change Ministry of Construction’s policies that relates to project budgets, and how to deal with the current policies if they are not changed.…

    • 311 Words
    • 2 Pages
    Good Essays
  • Best Essays

    economics 365

    • 2287 Words
    • 10 Pages

    The construction industry has been a result of a lot of change in the past few years. The construction industry consists of small business to the very large corporation. A small business in the construction industry can be considered a simple handyman business. A large business in the construction industry can be considered a new commercial builder. With the limited barrier of entry the construction industry has been threaten by new companies entering the market. New companies entering the marking have posed a threat in which causing the existing construction companies to have a strategic plan to prevent from closing their doors. With a strategic plan in place the existing construction companies will have the tools needed to compete with newer companies entering the market.…

    • 2287 Words
    • 10 Pages
    Best Essays
  • Better Essays

    Proj595 Risk Paper

    • 1690 Words
    • 7 Pages

    Cited: Cooper, D. F., Grey, S., Raymond, G., & Walker, P. (2005). Project Risk Management Guidelines:…

    • 1690 Words
    • 7 Pages
    Better Essays
  • Best Essays

    PUSPASARI, T.R.. (2005). FACTORS CAUSING THE POOR PERFORMANCE OF CONSTRUCTION PROJECT . Available: http://eprints.utm.my/3723/2/TatianaRinaPuspasariMAD2005ABS.pdf. Last accessed 10/11/2012.…

    • 2267 Words
    • 10 Pages
    Best Essays
  • Better Essays

    References: Cooper, D., Grey, S., Raymond, G., and Walker, P. (2005) Monitoring and Review. Project Risk…

    • 1074 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Risk management is a crucial step of the project planning stage that continuously evolves throughout the project. During phase one of the case study this stage is considered a high importance and value step thus resulting in the proper planning of the risks based of off the WBS. The objectives of phase one are clearly identified and the intention to identify major risks of the project, which will be used as a baseline when comparing each individual tender to the project’s risk outcomes, is clear and all major steps to do so are taken. Step one of the creating the tender phase one case study calls for the “project structure to be reviewed with the project manager and key staff” and creating “an agreed risk WBS”.…

    • 1084 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    References: 1. J.R. Meredith and S.J. Mantel, “Project Management — A Managerial Approach” (New York: John Wiley & Sons, 1995); C. Chapman and S. Ward, “Project Risk Management” (Chichester, United Kingdom: Wiley, 1997), 7; and R.L. Kliem and I.S. Ludin, “Reducing Project Risk” (Hampshire, United Kingdom: Gower, 1997), 10-25. 2. C.B. Chapman, “A Risk Engineering Approach to Project Risk Management,” International Journal of Project Management 8 (1990): 5-16. 3. For more examples of projects with variation, see A. De Meyer and C.-C. Hwee, “Banyan Tree Resorts and Hotels: Building the…

    • 5514 Words
    • 23 Pages
    Powerful Essays
  • Good Essays

    References: 1. Mattock, l. H. , "Desiqn .:md Construction of a Helical staircase," Concr~te and Constructional Enqineering (London), v. 52, No. 3. March 1957, pp. 99-105. Morgan, V. A., "Comparison of Analysis of Helical S·tairs," Concre·te 2nd Constructional En9ineering (London), v. 55, No. 3. March 1960, pp. 127-132. Cusens 1 A. R., and 'I 'ri.rojna Supachai, "Helicoidal St~ircasc Study ' ', A.C.I. Journal, Proceedings, v. 61. January 1964, pp. 85-101. Holmes 1 J. M. C., "Analysis of Helical Beams Under Symmetrical Loading", Proceedings 1 lSCE, v. 8 3, ST6, November 1957, pp. 1437-l to 1437-37. Scordelis, ZL C. , "Internal Forces ln Uniformly Loaded Helicoidal Girders," !~.C. I. ,Journal, Proceedings, v. 56, No. 10, April 1960, pp. 1013-1026. Bergman I v. R. I "Eelicoidal s·taircases of Reinforced Concrete," l:c.C.I. Journal, Proceedings v. 53, No. 4. October 1956, pp. 403-412. Cohen, J. S. , 11 Desig·n of Helical Staircases," Concrete and Constructional Engineering (London), v. 50, No. 5, May 1955, pp. 181-194. Magnel (:!., "!…

    • 1570 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    Sedimentation

    • 4747 Words
    • 66 Pages

    A student of PhD in Civil Engineering at University of Engineering and Technology Taxila Pakistan and…

    • 4747 Words
    • 66 Pages
    Powerful Essays
  • Powerful Essays

    Flood Monitering

    • 7518 Words
    • 31 Pages

    Department of Civil Engineering, University of Engineering and Technology, Taxila, Pakistan. Department of Civil Engineering, University of Engineering and Technology, Lahore, Pakistan.…

    • 7518 Words
    • 31 Pages
    Powerful Essays