Cost Questions
Chapter 8
Cost Estimation and Budgeting
True/False
1) Direct costs are those clearly assigned to the aspect of the project that generated the cost.
T
2) Material is an example of a cost that is recurring, variable and direct.
T
Multiple Choice
1) Which of the following is a direct cost?
A) labor
B) rent
C) depreciation on equipment
D) health benefits
2) Workers paid $15.00 per hour with an overhead charge of 1.45 and a personal time allowance of 1.15, have what total direct labor cost for an 8-hour work day?
A) $151.30
B) $174.00
C) $200.10
D) $236.80
Chapter 9 Project Scheduling: Networks, Duration Estimation, and Critical Path
True/False
1) Preceding activities are those that must occur before others can be done.
T
2)
A backward pass is performed when it is necessary to undo some work that has been performed in order to complete it properly.
F
Multiple Choice
1) The least amount of float is found:
A) in a resource-limited schedule.
B) after a burst activity.
C) on the critical path.
D) after a merge activity.
2) An activity has an optimistic time estimate of 15 days, a most likely estimate of 24 days, and a pessimistic estimate of 40 days. What is the expected duration of the activity?
A) less than 27 days but greater than or equal to 26 days
B) less than 26 days but greater than or equal to 25 days
C) less than 25 days but greater than or equal to 24 days
D) less than 24 days
Chapter 10
Project Scheduling: Lagging, Crashing, and Activity Networks
True/False
1) Finish to start lags are the same as additional activity slack.
F
2) The critical path may not contain a dummy activity.
T
Multiple Choice
1) The most common type of logical sequencing between tasks is referred to as the:
A) finish to start relationship
B) finish to finish relationship.
C) start to start relationship.
D) start to finish relationship.
2) An activity performed by a subcontractor is scheduled for 20 weeks at an anticipated cost of $100,000. Due to

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Paper cost ( 1,300 copies x .007) 9.10 Other supplies & electricity (1,300 copies x 0.004) 5.20 Total variable cost 14.30 2.) Calculate the total labor cost of these jobs Labor cost ( $ 8 x 4 hrs ) 32.00 3.) Suggest a way to assign labor and indirect costs to the cost of a copy made on that Sunday Direct Labor hours used because it is fixed and can be easily measured. 4.) Determine the full cost of one copy on the last Sunday in June, using the cost method in preceeding question. Paper cost 0.007 Other supplies & electricity Other supplies & electricity 0.004 0.004 Labor Cost (8/ hrx 4 hrs)/1300 copies 0.0246 Monthly operating cost (total cost (($5,000/30 days)/8hrs ) hourly rate ( 20.83/ hr x 4hrs )/1,300 copies 0.064 Total Full Cost per copy 0.0996 5. ) Determine the average annual full cost of one copy No. Of copies made / No. Of copies made 1,300 copies / 4hrs = 325 copies per hour Total no. Of copies made = total direct labor-hours x copies made per hour 7,280 hrs x 325 copies per hour = 2,366,000 copies Variable Cost ( 0.011 x 2,366,000 copies ) Labor cost (.0246 x 2,366,000 copies ) Other monthly cost total cost 5,000 x 12 months Total annual cost 26,026.00 58,203.60 144,000.00…

    • 657 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    "Cost estimating - Based upon the activities, their time estimates, and resource requirements, an estimate can be developed.…

    • 1088 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Managerial Statement: The expected duration of the project is 31 working days. Critical Activities are I, J, K, L, and M.…

    • 678 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Maxine Doc 315

    • 856 Words
    • 3 Pages

    Direct Costs = Costs that can be directly traced back to a cost object (Direct Materials + Direct Labor). Direct costs are valuable in the production of the navigation system at VectorCal, because it shows the company how much it is spending on a particular cost object.…

    • 856 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    UMA Week 3

    • 305 Words
    • 1 Page

    9. How many days are used to calculate the EDD? The due date may be estimated by adding 280 days…

    • 305 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Assignment 2

    • 1856 Words
    • 7 Pages

    40 days, specify the complete range of x. That is, make a list of all possible outcomes of x under…

    • 1856 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    Pm 586 Week 4 Essay

    • 415 Words
    • 2 Pages

    3. What is your budget for the Preparation Phase? What is the Preparation Phase duration in weeks?…

    • 415 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Bsbwor501 Final Exam

    • 742 Words
    • 3 Pages

    It is estimated that 10,000 direct labor hours will be worked during the year. The predetermined overhead rate will be:…

    • 742 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    liitlefield

    • 1439 Words
    • 6 Pages

    Since the average job lead time exceeded 2 days during days 43 through 46, inclusive, we thought…

    • 1439 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    * Since the foundation of the NFL in 1920, player helmet safety has come a long way with many advances being made to ensure players receive the highest degree of protection possible.…

    • 984 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    c. Often two or more activities can start simultaneously or a lag takes place between the start of one activity after an earlier activity has commenced. An example would be in a project when one activity can be labeled a ‘burst point’ to multiple successor activities.…

    • 310 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    operation management

    • 252 Words
    • 1 Page

    To conclude, we cut activity T by 2 weeks. The project can be completed in 14 weeks.…

    • 252 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    CAPD

    • 1196 Words
    • 5 Pages

    Direct costs - refer to teaching, equipment, and materials directly associated with the actual education program.…

    • 1196 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Pert Mustang

    • 2682 Words
    • 11 Pages

    Activity Duration A 2 B 4 C 5 D 2 E 1 F 8 G 3 H 5 I 4 J 7…

    • 2682 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    Nothing

    • 5246 Words
    • 21 Pages

    Which of the following would most likely be included as part of manufacturing overhead in the production of a wooden table?…

    • 5246 Words
    • 21 Pages
    Good Essays