Unit 3 Assignment 2: Simulation/ Case Study 5.1 Calcutta’s Metro

The first main concern for the construction of the project is the funds. So as the mayor of Calcutta my first step is to get the funds required to start up this project. These funds would be acquired from various sources like donations, taxes, and loans. Once the funds are acquired, the next step would be to look into the plan of the project. I would take the opinion of a few well-known engineers before an actual plan is taken up. I would make it a point to see to it that the various pros and cons of different plans are taken into consideration before starting the project. Then I would select that project which would give us the maximum benefits within the obtainable budget and least disturbances to the normal life in the city. I would consider the efficient labor to carry on the work of this project. I would play close attention and make sure that all the basic facilities that are required by the citizens would not be disturbed due to the commencement of this project. Every possible option would be exhausted to make sure that the project would not cause any kind of inconvenience to the normal life of the citizens. In my opinion there is no such thing as bad luck and nothing happens by chance. Everything is planned and has a definite purpose. It is only our hard work that will make us or break us. Therefore, it is important to take into consideration a 360 degree view of any problem before we solve it. If the situation is looked upon from only one angle, then all the disadvantages of the remaining angles will occur. Although it may be a little time consuming and painful in the beginning, it is important to know that the hard work pays it all. Had the mayor seen the consequences of starting this project from various points of view. I believe this situation would not have been escalated at all.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    The project will be initiated in which details for the project will be discussed, as well as interviews with key stakeholders will be had. Following this planning will be begun to set project dates and goals. The next step will be execution of the project, and then the project will be observed and…

    • 337 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Permit poses risk because this is something that is completely out of the organization’s terrain, it has to be submitted to the local government office and they have to come out for inspections and this has to be on their own schedule and this could be out of schedule for this project, to mitigate this, the application for permits have to be submitted on time giving more than enough time to hear back from the local government.…

    • 311 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The consideration of costs and benefits in the evaluation of an upcoming city project is a rather logical process. In fact, it is important for city managers to take into account the project costs and benefits prior to implementation of said project. The process of developing the project idea is essential and thus consideration for the best course of action becomes essential to the process. Once these measures have been weighed out it is critical to compare the costs associated with implementing the courses of action addressed in the development phase.…

    • 1074 Words
    • 5 Pages
    Good Essays
  • Better Essays

    As the Director of Public Works, it is Ms Simpson’s job to act with due diligence to prevent harm to the public and the publics’ trust in her employer. Her reputation as an engineer is what gives the public confidence in her skills, abilities and decisions. For this reason, it is important for engineers to protect their professional reputations. In this case, her employer is the Department of Public Works, which has a duty to represent the City as a whole.…

    • 1578 Words
    • 7 Pages
    Better Essays
  • Good Essays

    1. Denial from the city for plans approval – this could cause the project to stop or require negotiation with another entity or even consideration for another location.…

    • 1078 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    § If you were the alderman, what would you do to more fully promote justice in the situation? Why?…

    • 657 Words
    • 3 Pages
    Powerful Essays
  • Good Essays

    (Machiavelli P. 74-75) In this case, it is exactly the mayor should do. Being trustworthy and humane, she should report to the city prosecutor and fight for the right of the family impacted, however, she will lose her job and the city’s future if she chooses to act in such manner. Based on above paragraph, it’s safe to conclude that the town will suffer from economical impact if the company were to leave, creating social issues that would further impact the future of the city. Also, though the pollution-impacted area was small and people were few (Larson P.1-2), she may still lose her job based on reason beside economical impact.…

    • 612 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Federalism Interview 2

    • 803 Words
    • 3 Pages

    4. What were the Mayor's responsibilities prior to the hurricane? Stock the shelters with food and water, mobilize cities and school buses for evacuation.…

    • 803 Words
    • 3 Pages
    Good Essays
  • Good Essays

    This assignment was to investigate the constructor’s role so I want to talk about that a little bit. After learning about how this project failed I realized how important it is for construction managers to have a basic understanding of structural design. Had the construction manager on this Hartford Civic Center job understood the need for a structural engineer I might not be writing this paper. How he overlooked the deflection is shocking, that is a huge red light to get some structural help, especially on a job of this magnitude. In looking at the construction process a little broader than that of the construction manager; everyone involved, from the architect and engineer, to the sub-contractors doing the labor need to group together and work as a unit so failures like this don’t occur. It seems like there was a huge lack of communication between parties involved. Communication is a huge part of achieving and accomplishing a project successfully. This cannot happen or problems and failures like this will…

    • 882 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Cas Indian railways

    • 6526 Words
    • 27 Pages

    individual freight railcars (wagons) by Indian Railways. After exploring multiple ‘technological options,’ the Indian Railways decided to undertake a pilot project based on timetested Automatic Equipment Identification system using Radio Frequency Identification…

    • 6526 Words
    • 27 Pages
    Good Essays
  • Good Essays

    French Government

    • 987 Words
    • 4 Pages

    The Mayors have the strongest BATNA in the case. They could decide not to intervene if the farmers in their communes protest by blocking the roads to the project. This would adversely impact the project and the investments that have been made by Mouse and the French government. Mouse would have no control over the protests or the difficulties it would create for the project. The French government would not be able to intervene to stop the protest by using police force because it would create negative press and political issues throughout France. Therefore, the Mayors should use this BATNA as leverage to reach an agreement that addresses their positions and interests.…

    • 987 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The City Engineer’s Office functions as the engineering and construction arm of the Government tasked to continuously develop its technology for the purpose of ensuring the safety of all infrastructure facilities and securing for all public works and highways the highest efficiency and quality in construction. CEO is currently responsible for the planning, design, construction and maintenance of infrastructure, especially the national highways flood control and water resources development system, and other public works in accordance with national development objectives.…

    • 1177 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Padma Bridge

    • 593 Words
    • 3 Pages

    INTRODUCTION: The Padma Bridge is a multipurpose road raile bridge across the Padma river to be constructed in Bangladesh. When completed it will be the largest bridge in Bangladesh and the first fixed river crossing for road traffic. It will connect Louhajang, Munshiganj to Shariatpur and Madaripur, linking the south-west of the country, to northern and eastern regions. The project covers three districts — Munshiganj (Mawa point/North bank), Shariatpur and Madaripur(Janjira/South bank). The total area of land to be acquired and required for its components is 918 hectares. The requisition of land for the construction yard will be for six years on a rental basis. As per the new design, an additional 144.04 ha has been identified for acquisition, bringing the total to 1062.14 hectares. This additional land is required because project site lost significant land due to erosion, for transition structures and due to a change in railway alignment.…

    • 593 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Mumbai is India’s main center of urban economic growth and one of the largest and most crowded metropolitan areas of the world. Mumbai is a complex urban environment characterized by diverse economic development, high population density, extensive unauthorized settlement and very high land costs. Greater Mumbai is experiencing rapid population growth, much of which is in unplanned, informal settlements. Mumbai Urban Transport Project (MUTP) has designed this project with a major effort to unlock Mumbai’s transport bottleneck.…

    • 1826 Words
    • 8 Pages
    Powerful Essays
  • Satisfactory Essays

    Bengaluru Metro Project

    • 1195 Words
    • 5 Pages

    Corridor respectively. Each Reach has been given to a contractor for execution of the project.…

    • 1195 Words
    • 5 Pages
    Satisfactory Essays

Related Topics