Process Analysis - CBC

Projection of the peak demand during the season

Projection of demand for processing of cranberries can be taken as equal to the delivery load at the plant. The two major points that we considered while making the projections for the 1981 season were the fact that Mr. Schaffer had estimated the arrivals of wet berries to be 80% of the total quantity and the Cranberry Marketing Order of 1980. It is assumed that the peak load of 1981 will not exceed that of 1980 by more than 0.05%. Thus the peak load is taken as 18900 barrels.

Process Analysis

Analysis of the process has been done with some simplifying assumptions. It has been assumed that there is no build up of inventory in tool changeover and production backlogs. Lunch time has not been accounted for to make the calculations simpler. All combined capacities have been divided as per the ratio of arrivals.

Dry process: - For peak load, the dry process has an average arrival rate of 394 barrels/hour which gives a backlog of 1576 barrels/hour by the time the subsequent processes start at 11:00 am. The holding capacity in bins is 4000 barrels and the process cycle time for the dry process is assumed to be 600 barrels/hour as that is the output received from the separation unit. As per the analysis, the dry process has no bottlenecks and can be done without any major modifications. Still, another separator unit may be needed if the capacity of the dryer is increased to match all other capacities.

Wet process: - For peak load, the wet process has a average arrival rate of 1,181 barrels/hour which gives a backlog of about 4000 barrels by the start of the processing operation and the backlog never ends as the holding capacity in bins is at max 4500 barrels. This is exhausted as the arrival rate exceeds the cycle time of the process by 581 barrels/hour. That is a build up which requires a lot of overtime and waiting cost for the consumers. The waiting time will result in overtime and

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Kooool

    • 716 Words
    • 3 Pages

    the number of capable new hires in production engineering, and to assist with the packaging…

    • 716 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Spmproject File

    • 667 Words
    • 3 Pages

    The maximum long-term achievable throughput rate is determined by the resource with the least capacity. As different process routes are followed by dry and wet berries, there will be distinct and separate maximum achievable throughput rates for these two products. The capacity of the dryers is the bottleneck for the wet berries. Therefore, the maximum throughput for wet berries is 600 bbls/hr. As for dry berries, the separation process is the bottleneck. The maximum throughput for dry berries will therefore be 1200 bbls/hr.…

    • 667 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Shuzworld Analysis

    • 5851 Words
    • 19 Pages

    A. Workflow: Shuzworld produces Rugged Wear Work Boots at its Shanghai production facility using an 8-step process and an assembly line of 8 workstations. Each workstation performs a single task that can range from 3 minutes to 10 minutes to complete, resulting in a total time of 46 minutes to fully assemble one pair of steel-tipped work boots. The facility has a budget to produce 6 work boots an hour, with a 40-hour work week (48 work boots a day). The following table shows the task schedule, along with the time required for each task and predecessor information to complete the 8-step process. The graph shows the current layout of the 8 workstations in the production line:…

    • 5851 Words
    • 19 Pages
    Powerful Essays
  • Good Essays

    Boss Is Barrier

    • 835 Words
    • 4 Pages

    The following report is intended to serve as a business case and a proposal to improve overall efficiency of the operations at Raw Material Yard. For the past few weeks, as part of my role as Raw Material In-Charge, I have been focusing on understanding the whole operating system of the plant and in order to gain an insight on all the operations, for one week, I have visited the plant in all the three shifts of the day. Today, I’m more dedicated and ambitious than ever towards my profession and hence in communicating the findings of my recent analysis pertaining to inefficiencies of the operations at Raw Material Yard.…

    • 835 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Cranberry Slaughter

    • 202 Words
    • 1 Page

    The elk being introduced to Black River Falls Wisconsin have raised some concerns for cranberry farmers, cranberry’s are a large export of wisconsin and are an important agricultural product of the economy of Wisconsin. The reason for the elk being a threat to the cranberry production is “The elk themselves, trampling through cranberry beds as the fruit is ready for harvest”(Lee Bergquist paragraph 2). The elk trample the cranberries and destroy them. The elk have become a small problem for cranberry farmers and are becoming a problem for the DNR because “construction of fencing this year to keep elk out of cranberry farms at a cost of nearly $250,000”(Lee Bergquist paragraph 3). The DNR have had to pay 250,000 in building a fence to keep…

    • 202 Words
    • 1 Page
    Good Essays
  • Powerful Essays

    This paper focuses on a process design, production forecast, and implementation of said design for Riordan Manufacturing.…

    • 1778 Words
    • 8 Pages
    Powerful Essays
  • Satisfactory Essays

    The objectives of this report are to diagnose their current inventory control strategy on DC, facility and site, analyze their improved new policy and propose a better strategy to inventory management and allocation. Poisson distribution is implemented to describe the demand assumption. The three main indexes we use to evaluate a strategy are fill rate, total inventory cost and expected downtime.…

    • 295 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    By calculating implied utilization of every process, we found that the drying process for wet berries is a bottleneck ofRP1. Utilization of dryers is 180%!!! (comparing to 8~48% of other processes, it is so problematic). Because of this bottleneck, 480 bbls of wet cranberries are not processed per hour on an average “busy” day (17,280 bbls arrive over the 12-hour period). As a result, our temporary holding bins are full from 1:40pm to 11:16pm, the dumping process (=truck waiting) is kept going until 11:16pm, and RP1 shut-down time is delayed to 4:36am. This means, our company has to pay huge money for overtime and dumping cost.…

    • 867 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    According to the data provided, there is 50 % of incoming berries which were wet harvested. In the absolute terms, this amounts to 750 bbls/h. The three drying machines can only handle 600 bbls/h altogether, meaning that 150 bbls of berries have to be stored in the bins each hour while waiting for the drying process. The second bottleneck is “located” at the separators. The three separating lines have the capacity to separate 1200 bbls/h, while there are 1350 bbls/h ready to be separated. Therefore, 150 bbls of dry berries have to be stores each…

    • 895 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Littlefield Labs Report

    • 548 Words
    • 3 Pages

    1. Step 1 is the bottleneck because it has the largest average queue size compare to step 2, 3 or 4. Even though we purchased 5 machines for Step 1, the utilization rate were around 80% or 90% when demand was high. Although Step 2 and 4 do their jobs in the station, they only take 2.1 hours which is still low compare to 5.3 hours in Step 1.…

    • 548 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Ncc Case

    • 1281 Words
    • 6 Pages

    The next vulnerable bottleneck is the “Jumbo Separator” system. Once the Drying station capacity is increased to meet the input rates, the input rate (20 Trucks/hr) for Jumbo Separators exceeds the maximum capacity of the station (16 Trucks/hr).…

    • 1281 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Cranberry Case

    • 730 Words
    • 3 Pages

    In February 1971, considered the present for purpose of this case, Hugo Schaeffer, vice-president of operations at the National Cranberry Cooperative(NCC), faces two primary problems that arise at receiving plant No.1(RP1) during the annual autumn cranberry harvesting season: (1)Trucks and drivers spend too much time waiting to unload process fruit at the receiving plant. (2) Overtime costs and absenteeism are out of control. There is also a secondary problem: half of the berries graded as top quality and awarded a 50-cent premium per barrel (bbl) are not top quality and do not deserve the premium.…

    • 730 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Cranberry and Berries

    • 1276 Words
    • 6 Pages

    In the case, there is a capacity for drying process only 600 barrel per hour and capacity for the wet bin is also 3200 barrel per hour. In this case, the capacity for drying process is the bottleneck of the entire flowchart and this brings about the result that workers cannot help do overworks. Also, insufficiency of the wet bin storage capacity makes truck drivers to wait until the berries are unloaded. Because of this problem, the overtime cost were still out of control in the fall, that is the peak time, and the growers are still upset that their trucks and drivers had to spend much time for waiting to unload process fruit into the receiving plant.…

    • 1276 Words
    • 6 Pages
    Good Essays
  • Better Essays

    Since the process capacity is of bottleneck, the capacity of the cranberry process is 600 bbls/hour. Also, we have to take note that only wet berries go through the drying process and thus the processing of the dry berries are not affected by this. The process capacity of processing dry berries alone would be 1200 bbls per hour (Bottleneck = Quality Grading). However, even with the capacity of 1200 bbls per hour, all dry berries received…

    • 1389 Words
    • 6 Pages
    Better Essays
  • Good Essays

    The processing at our plant consists of a number of sequential operations performed on different equipment. Different products require different times on each equipment. The demand for each product is market driven with significant random variation. This is creating scheduling problems with frequent idle capacities or backlogs on the various equipment. This is the major problem in meeting delivery targets. The DFSS should target the idle capacities or backlogs as defects and appropriate tools should be used to design production schedules. One option that can be considered is planning for average forecasted demands. The inventory carried over from lean periods can be kept aside for periods of sudden high demands. Another option can be to lower production levels during lean periods and outsource during periods of high demand. Careful evaluation of both options is required.…

    • 620 Words
    • 3 Pages