Preview

Cv Sunny Yeung

Satisfactory Essays
Open Document
Open Document
398 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Cv Sunny Yeung
CV OF SUNNY K YEUNG Registered Architect, Barrister – Inner Temple, Accredited Mediator, Adjudicator

Sunny Yeung has worked in China, Hong Kong and Australia, developing an impressive depth of experience and ability in all facets of the practice of architecture and project management and is well experienced in assessment of claims, arbitration, dispute resolution and expert testimony. He has also been actively involved in land-use applications, lease modifications, land and DMC matters, marketing and product disposal, syndicate loan negotiations and assets enhancement. He is also experienced in client – consultant dispute resolution and professional negligence litigations.
EDUCATION:

1977 1979 1991 1996 2000 2005

BA(Arch Studies) Hons, HKU B Arch. HKU Cert. Quality Management (RAIA) Diploma of Law - Metropolitan Manchester University MA(Arb & DR)(Distinction) - City University of HK LLM – University of London Corporate Member, Hong Kong Institute of Architects Fellow, Royal Australian Institute of Architects Barrister, Inner Temple, London Fellow, Chartered Institute of Arbitrators Authorised Person (Architect) - Hong Kong Registered Architect, (NSW) Australia Graded Arbitrator - Australia Panel Mediator - Hong Kong International Arbitration Centre Construction Adjudication – Chartered Institute of Arbitrators Licenced Estate Agent – HK Estate Agents Authority

PROFESSIONAL 1981 QUALIFICATIONS: 1992

1997 2001
REGISTRATIONS:

1982 1989 1991 2000 2005 2008

BRIEF EMPLOYMENT HISTORY:

July 2008 2005-2008 1994-2004 1993-1994 1982-1993

Executive Director – Sino Land Co. Ltd. Associate Director – Sino Land Co. Ltd. Assistant Project Director - Wharf Limited Associate Director - NFA Architects Associate Director - Denton Corker Marshall - HK and Sydney 1981-1982 Associate - Ho & Ip Architects 1979-1981 Project Architect - Antonio Alunan & Associates HKIA Certificate of Merit, Wayfoong Plaza AILA Merit Award, Tsuen Wan Town Square AILA Project

You May Also Find These Documents Helpful

  • Best Essays

    In 1987, the trustee of a property trust employed CDG Pty Ltd (the first respondent) to design the foundations of a commercial building. The second respondent was a civil engineer employed by the first respondent and was its project manager in relation to the complex’s design and construction.…

    • 2813 Words
    • 10 Pages
    Best Essays
  • Satisfactory Essays

    bubbaganoosh

    • 515 Words
    • 3 Pages

    Urban Constructions has several policies, procedures and practices in place to protect the client, suppliers, our staff and our contractors. Limitations placed upon our team can restrict the project to what it will produce. To make this subdivision successful, we must follow these procedures.…

    • 515 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    The MW-1 2003 Contract was developed and published by the Royal Australian Institute of Architects (RAIA) and the Master Builders Association (MBA). This contract is the revised edition of the original ABIC MW-1 2001 contract…

    • 2001 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    Hnc Forms of Construction

    • 3301 Words
    • 14 Pages

    Contents 1.0 Introduction 2.0 Methodology 3.0 Inception 4.0 Feasibility 4.1 Overview of stage 4.2 Assessing the feasibility 4.3 Site investigation 4.4 Effects on design 5.0 Then brief 5.1 Overview of stage 5.2 What the brief should cover 5.3 What the brief should include 5.4 Consultants at this stage 6.0 The concept/outline proposals 6.1 Overview of stage 6.2 Requirements to proceed with concept design 6.3 Developing the brief into concept design 6.4 Planning permission 6.5 Building regulations approval 6.6 Achieved at this point 7.0 The design development 7.1 Overview of stage 7.2 Developing the design 7.3 Finalisation of design 7.4 Planning proposal 7.5 Building regulations 7.6 Sampling and testing 7.7 Health and Safety 7.8 Achieved at this stage 8.0 Technical design 8.1 Overview of stage 8.2 Implications on design 9.0 Production phase 9.1 Overview of stage 9.2 Design implications 10 Other construction projects…

    • 3301 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    The Batek of Malaysia

    • 623 Words
    • 3 Pages

    By: Beswick, Jon. Architectural Review, Oct2010, Vol. 228 Issue 1364, p080-083, 4p, 8 Color Photographs…

    • 623 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Contract Breach

    • 1284 Words
    • 6 Pages

    Situations that involve written and oral contracts between clients and contractors happen every day. Quite often, a price is agreed upon based on a completion date and the performance that happens along the way. One such situation that I have experienced was when my Dad decided to purchase a brand new townhouse in a downtown Cincinnati residential redevelopment project. A private contractor named Drees had won the rights from the city to be the only firm that could be used in the construction project and they are very popular there. A contract was signed between my parents and the developers that a new home would be built to their specifications and delivered within a six month period and upon that date they could move in. The focus of this analysis is to bring the contract under scrutiny that existed between Drees and my parents and how the contractor performed their duties.…

    • 1284 Words
    • 6 Pages
    Better Essays
  • Best Essays

    The Architectural Apprenticeship: Architect: Sean Godsell… | 15 March 2010 | [WEBSITE] Available at: http://thearchitecturalapprenticeship.blogspot.com.au/2010/03/architect-sean-godsell.html?_sm_au_=iVV07Lj5N5kDNHsP [Accessed 24 May 2015].…

    • 1754 Words
    • 8 Pages
    Best Essays
  • Satisfactory Essays

    References: Bawden, D. (2002). Making Alternative Dispute Resolution Work for You. Professional Remodeler. Vol 6 Issue 12, p45-47, p70.…

    • 329 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project management

    • 1280 Words
    • 7 Pages

    Provide evidence for grading criterion P1. (identify the various stages of the construction process for a low-rise domestic or commercial building)…

    • 1280 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    building services essay

    • 1054 Words
    • 5 Pages

    Learners Declaration : I certify that the work submitted for this assignment is my own…

    • 1054 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Human Trafficking

    • 1016 Words
    • 5 Pages

    : To inform my audience about the global issue of human trafficking and how to stop it.…

    • 1016 Words
    • 5 Pages
    Powerful Essays
  • Better Essays

    The Planners Boey Kim Cheng Andrew Annear and Edward Scrimgeour Biographical details • Boey Kim Cheng was born in Singapore in 1965. He received his Bachelor of Arts and Masters of Arts degrees in English Literature from the National University of Singapore. • Worked for some time in America as a probation officer • Disillusioned with the state of literary and cultural politics in Singapore, Boey left for Sydney with his wife in 1996. • in Australia, Boey completed his Ph.D. studies with the University of Macquarie.…

    • 850 Words
    • 4 Pages
    Better Essays
  • Good Essays

    some directions of how the envelope or the massing of the buildings will be (Master of Architecture).…

    • 587 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Resort

    • 14779 Words
    • 60 Pages

    A Research Project submitted in partial fulfillment of the requirements for the degree of Master of Architecture Professional Unitec Institute of Technology, 2011…

    • 14779 Words
    • 60 Pages
    Good Essays
  • Powerful Essays

    Alhambra Palace

    • 6373 Words
    • 26 Pages

    OMAR M. AMEIREH Department of Architecture, Faculty of Engineering and Technology, University of Jordan, Amman, Jordan oma_amir2000@yahoo.co.uk…

    • 6373 Words
    • 26 Pages
    Powerful Essays