Preview

Discuss the impact of capacity planning when trying to implement JIT

Satisfactory Essays
Open Document
Open Document
1452 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Discuss the impact of capacity planning when trying to implement JIT
Question 3 A – Discuss the impact of capacity planning when trying to implement JIT
Aylesbury pressing has been in business for over a century so their way of working and their pricniples followed with regard to manufacturing has always been creating buffer stock at every stage at their production area and their assembly only starts when all various products have accumalted and at the moment normal manufacturing lead times is 6-8 weeks. Implementing JIT is going to be a problem because at the moment people have set job functions and the JIT procedures and disciplines wants people to multi task and states team measurements will be done instead of individual performance, JIT needs a demand for work but at the moment AP is just producing and because of sales increasing they need a proper system in place or the business will not be able to satisfy customer demands.
Capacity is calculated: (number of machines or workers) × (number of shifts) × (utilization) × (efficiency) and works in harmony with JIT, managing lead times and eliminating waste. Implementing a JIT system requires management to consider issues of worker stress, cooperation and trust among workers and management, and reward systems and labor classifications. In a JIT system, workers must meet specified cycle times and workers feel pushed and stressed, causing productivity losses or quality reductions and due to AP staff mindset been on doing a single activity per person it is going to take a lot of time for proper implementation. Workers at AP might feel that they have lost some autonomy because of the close linkages in materials flows between stations with little or no safety stocks due to elimination of waste through capacity planning.The fluctuation of demand creates problems regarding the procurement of resources to meet the customer demand and due to AP merely keeping up with demand JIT is going to be difficult to implement within a short period as capacity decisions are strategic in nature and is

You May Also Find These Documents Helpful

  • Powerful Essays

    DRAPER INSTRUMENTS

    • 4341 Words
    • 18 Pages

    Issues: How can DI motivate employees to achieve JIT objectives and track progress on the implementation of the JIT system? How can DI successfully move towards implementing and utilizing a JIT system?…

    • 4341 Words
    • 18 Pages
    Powerful Essays
  • Satisfactory Essays

    Sm C102 Quiz #2

    • 650 Words
    • 3 Pages

    Correct Question: Capacity planning involving hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is considered as which one of the following planning horizons? Your Answer: Intermediate range…

    • 650 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Assume Portion

    • 227 Words
    • 1 Page

    The JIT or Just in time inventory system is an inventory strategy in which the company brings in inventory just at the time that it is needed, not before or after the start of production. This will reduce the high inventory level but will require a strong supply chain. The idea behind JIT is to help company reduce inventory since it will reduce storage and staff. It also help reduce waste for materials that have expiration dates so there will be less products to throw away. Since large manufacturing companies work off a forecast of future sales it is necessary for them to have as close as an accurate forecast as possible since this will determine what products they will need to have and when. Not only will this method minimize excess inventory it also help manufacturing companies to adjust their manufacturing strategy accordingly to customers demand since the global market is always changing and people’s needs changes. Since the company can reduce cost in managing inventory they can use that resource to invest in other areas to improve business.…

    • 227 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    National Cranberry

    • 620 Words
    • 3 Pages

    3. Recall the definition of a capacity bottleneck from Module 1. Identify the potential capacity bottleneck(s) in the…

    • 620 Words
    • 3 Pages
    Good Essays
  • Better Essays

    The company’s plan to grow and become more efficient, requires a review of the capacity constraints (bottlenecks, or road-blocks) at its current manufacturing sites. Strategic capacity planning allows an approach to determine the capacity level of capital-intensive resources (such as machinery, facilities, and labor force) that best supports the…

    • 1017 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Anogene Inc Essay

    • 384 Words
    • 2 Pages

    Refer to items 3 and items 4, what role does practical capacity, expected production, and actual production play in formulating an approach for assigning overhead? How are these matters useful to managers? Draw on text and readings for your answer.…

    • 384 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Jit Management

    • 2938 Words
    • 12 Pages

    Supply Chain Management is a term used to describe the relationship that exists between an organisation and its network of suppliers and buyers. Just-In-Time (JIT) management is the ability of an organisation to integrate its systems and processes with that of the supply network. Describe a supply chain where this occurs and discuss the challenges and benefits of the JIT methodology.…

    • 2938 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    Barilla Spa Case Study.

    • 1033 Words
    • 5 Pages

    1. Diagnose the underlying causes of the difficulties that the JITD program was created to solve. What are the benefits and drawbacks of this program?…

    • 1033 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Wk 3 Self Assessment

    • 381 Words
    • 2 Pages

    The goal of JIT is to drive all inventory queues to a moderate level thus…

    • 381 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Wescott case study

    • 475 Words
    • 11 Pages

    Question 3: Use the information and your knowledge of the situation to develop a complete plan for Jason to use in the future. Part of this plan should be to build and demonstrate the approach to master scheduling for the data given in the case.…

    • 475 Words
    • 11 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Org Management

    • 924 Words
    • 5 Pages

    1. What are the major inputs, constraints, and outputs of the aggregate production plan (APP)?…

    • 924 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    bibbbu

    • 378 Words
    • 2 Pages

    Key Capacity issues: What: can the facility, process, or equipment accommodate the existing goods and services and adapt to changing demand in the future? How large should facility, process, or equipment capacity be? When should capacity changes take place?…

    • 378 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    U.S. Stroller: Case Study

    • 1595 Words
    • 5 Pages

    The purpose of this case is to show how a batch system can be dramatically improved by JIT or Cellular concepts. The case clearly describes the changes that must be made in the production system to achieve the benefits desired. This amounts to a complete change in layout of the production floor and a substantial overhaul of the MRP system. The case nicely ties together some of the material from the text on JIT, GT, EOQ and MRP.…

    • 1595 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    capacity in the long-term, schedule in such a way as to minimize operation costs, keep inventory…

    • 6643 Words
    • 42 Pages
    Powerful Essays