Summary:-
4
4
Introduction
5
5
Intake Area
6
6
SEA WATER CHLORINATION PLANT
7
7
Distillers
7
8
Recarbonation plant
8
9
Chemical water treatment
9
10
General Auxiliary Building (GAB)
10
11
Fuels system
11
12
The boilers Boilers treatment by chemical
12
13
13
Steam turbines
14
14
The Generators
15
15
How electricity is produced in power stations
16
16
The gas turbine
17
17
Conclusion
19
Table of figures:
Figures NO
Name of Figures
No of Pages
1
Intake Area
6
2
Electrolyzer
7
3
The Resin
9
4
Water Treatment
10
5
Fuel cycle
12
6
Wall Tube
13
7
IP steam turbine
15
8
Steam\water cycle
17
9
Gas turbine
18
2- Acknowledgement:- First of all I like to thank ministry of electricity and water in Kuwait. Also I thank Doha West Power Station where I did my training. And I thank the employees in the station specially engineering Imad Alktan who stands with as in the training. Also I want to thank Kuwait university which receives as in Kuwait. And I tank engineering Gazi Alshameri who guided as in the training.
3- Summary:- I did my training in Kuwait in Doha West Power Station. The training was for five weeks from 3.06.2013 to 8.07.2013. First I started with general explain about the station. Then, they gave me Personal Protective Equipments (PPE.) which are coverall, safety boot, helmet and eye glasses. They explained each parte in details and then I visited each