Donner Company, started in 1985, manufactures printed circuit boards, technically called as “soldermask overbare copper” boards
It faces a competition from around 750 manufacturers in United States.
The firm has developed new processes and application and holds patents for these. Process Order
Whenever an order was received, price was quoted based on estimations of labor and material costs. Based on acceptance by the client, delivery time of 3 weeks was quoted for orders below
1000 boards and 5 weeks for rest.
Meanwhile some rush orders were accepted which needed to be served in four days
Manufacturing Process Flow
Preparation Stage
Master Artwork, Punching Location holes Image Transfer Stage
Drilling Of Holes, Electroplating,
Chemicals
Fabrication Stage
Solder Mask, Testing, Profilling
Cont’d
Order Processing
Problem
Productivity
Quality
Delivery
Problem
Clients often found the necessity to change the product specifications because of some error and this required worked to be stopped on that product.
Internal factors like improper management and procurement policies for raw material requirements also introduced delays in the manufacturing process.
The problem is majorly because most of the shipments are dispatched towards the end of the month.
Recommendation
Hold an inventory of raw material to reduce the time an orders spends waiting for the purchase to happen.
Change the policy of shipping more in second fortnight of the month, make it more equally distributed. It may not be possible to stock all raw materials, but key items should be stocked.
Especially those related to the start of the manufacturing process
Changing Information Transmission
Recommendation
Keep the small and special order in cell