Supervisor :- Mr Sane.
Present Production Rate :- 315 units/day
Desired Production Rate :- 420 units/day
Estimated contribution :- Rs 30 per unit
No of workers employed :- 7
Hourly regular wage :- Rs 30 per hour

Activity
Activity Time
(Seconds)
Immediate Predecessor
1
30
None
2
50
None
3
40
1
4
50
1
5
20
2
6
10
3
7
10
4,5
8
20
2
9
10
6
10
40
9
11
20
7
12
30
7
13
50
9
14
50
10
15
10
11
16
40
8,12
Total Lead time (Sum of all activity Time) = 480

working day has 8 working hours (with rest period) gives 7 hrs working time

Cycle Time for 315 units = 420 (min) /315 units = 1.33 min/unit = 80 seconds/ unit
No of workstations required = (Production Units x Lead Time)/ Available Time
= (7 x 420)/480 = 6 Work Stations

Current Usage 315 units

Work Station
Activity
Time(Sec)
Time (Min)
Ideal Time (Min)
1
1,3
30+40=70
1.16
0.163
2
2,5
50+20=70
1.16
0.163
3
4,8
50+20=70
1.16
0.163
4
6,9,13
10+10+50=70
1.16
0.163
5
7,10,11
40+20+10=70
1.16
0.163
6
14,15
50+10=60
1
0.33
7
12,16
30+40=70
1.16
0.163
Available Time (Min) = No of Workstations x Cycle Time = 7 x 1.33 = 9.31
Ideal Time (Sum of All ideal Times above) = 1.31
Efficiency % = 8 (Rounded off from 7.95)/9.31 (Min) = 85.93

Desired Usage 420 units

Cycle Time for 420 units = 420 (min) /420 units = 1 min/unit = 60 seconds/ unit
No of workstations required = (Production Units x Lead Time)/ Available Time = 8 Work Stations

Work Station
Activities
Time (Sec)
Max Prod Capacity
(Total Sec in day /
Time per work station)
1
2
50
504
2
1,5
50
504
3
3,8
60
420
4
4,6,7
70
360
5
9,13
60
420
6
10,11
60
420
7
14,15
60
420
8
12,16
70
360

However, at workstation no 4 and 8 the total production capacity is limited to 360 and is thus bottleneck for the desired total production of 420 units per day.

Recalculating with 9 workstations

Work Station
Activities
Time (Sec)
Max Prod Capacity
(Total Sec in day /
Time per work station)
1
1
30
840
2
2
50
504
3
3,5
60
420
4
4,6
60
420
5
10
40
630
6
7,11,12
60
420
7
9,13
60
420

You May Also Find These Documents Helpful

  • Better Essays

    JGT Task 1

    • 1830 Words
    • 6 Pages

    The assembly line is budgeted to produce six work boots in a 40 hour week. This is equivalent to 480 minutes of production time in one eight hour day. The line can make 48 boots in an eight hour shift. This leaves a cycle time per boot of 10 minutes. In order to figure how many workstations are appropriate for the cycle time of 10 minutes, I calculated the total task time of the boots by the cycle time. The total task time is 46 minutes, divided by the cycle time of 10 minutes; leaves minimum necessary workstations of 4.6 or 5. This gives the production line the most efficiency. The assembly line was previously working with 8 stations with the longest cycle time of 10 minutes. There were several stations that had over 5 minutes of idle time. Idle time increases waste through not using employee’s time efficiently. By combining several of the work stations less idle time was created making the process more efficient. The fewer work stations also decreases the amount of time used to move items from station to station which is additional wasted time in production. When figuring the efficiency rate of the assembly line I multiplied the number of stations by the longest cycle time, and then divided that by the overall task time to make a pair of boots. The original process of the assembly line was operating at 58% efficiency. When I recalculated this using the 5 stations with a cycle time of 10 minutes, the efficiency rate was 92%. This is a significant increase. It would be recommended that the employees cross train in performing the tasks to help keep the process moving…

    • 1830 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    Exercise 7-47: Cycle Time and Velocity, page 327 1. Compute the velocity (per hour) for the first quarter. 80,000 speakers/20,000 production hours = 4 units per hour 2. Compute the cycle time for the first quarter (minutes per units produced) 20,000 hours/ 80,000 speakers =…

    • 98 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Pm3110 Unit 4

    • 854 Words
    • 4 Pages

    (10 pts) A processor makes two components, A and B, which are then packaged together as the final product (each product sold contains one A and one B). The processor can do only one component at a time:…

    • 854 Words
    • 4 Pages
    Good Essays
  • Better Essays

    Hilcrest Auto Case

    • 973 Words
    • 3 Pages

    machine takes 0.06 seconds per tube (60 seconds per 1000 tubes). Each of these processes runs…

    • 973 Words
    • 3 Pages
    Better Essays
  • Better Essays

    JGT2 ALL

    • 10845 Words
    • 44 Pages

    produces 6 workboots in one hour with a 40 hour work week making this the most appropriate layout for the…

    • 10845 Words
    • 44 Pages
    Better Essays
  • Satisfactory Essays

    Kristen's Cookies

    • 491 Words
    • 2 Pages

    In this process the Step 3 & 4 have the longest processing time of 10 minutes which means this is the bottleneck in the process. We know that the bottleneck determines the maximum output of the process. The bottleneck time is also referred to as the cycle time.…

    • 491 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Bus 630 Case Study

    • 392 Words
    • 2 Pages

    To meet the volume of 5,800 hrs: 5,800 hrs needed2,000 hrs per equipment=2.90 or 3 pcs of equipment…

    • 392 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Find an option that would be best suited for Pharma to meet current and future demand.…

    • 717 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Littlefield Case Study

    • 875 Words
    • 4 Pages

    At this point, our team should have reevaluated our decisions, and purchased a new machine for Station 1, in order to get production moving faster to Station 2. As our utilization was remaining at a constant 100%, our lead times were also increasing. With full utilization, we were unable to produce enough product to meet our order demands, further increasing the queues at each station and increasing our lead times (as shown).…

    • 875 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    b. Assuming 30 customers per hour arrive, complete the process capacities and utilizations for all resources.…

    • 486 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Satelite Problem

    • 506 Words
    • 3 Pages

    100,000 labor hours for per unit x 4.802 = 480,200 total labor hours for the whole project of 8 satellites…

    • 506 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    The sum of the task times is 583 seconds. To figure this out, I used the efficiently calculation of only including tasks performed at the work stations using labor and omitted the 310 seconds of software download. Efficiency = work content/(actual number of workstations X cycle time) = 583/6(120) = 80.97%…

    • 593 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Benihana Operations Case

    • 500 Words
    • 2 Pages

    It takes 60 minutes for one customer to eat dinner, and there are 112 seats in the dining area. Therefore 112 people eat every 60 minutes (throughput). On average a dinner cycle is completed every 60 minutes/112 people = 32 seconds per person (cycle time). We know that dinners are processed in batches of 8, so on the average a table of 8 finishes every 256 seconds…

    • 500 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    operation management HW1

    • 1231 Words
    • 5 Pages

    units. The workstation produces this part at the rate of 200 units per day. What…

    • 1231 Words
    • 5 Pages
    Good Essays

Related Topics