Preview

Drlling Rig Cyclones - Mud Cleaner

Powerful Essays
Open Document
Open Document
153403 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Drlling Rig Cyclones - Mud Cleaner
NOTICE INVITING TENDER FOR COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT BHUBANESWARI OCP OF

JAGANNATH AREA MAHANADI COALFIELDS LIMITED VOL – I

A Mini Ratna Company

JULY 2011

Office of The General Manager(E&M) P.O. – JagrIti Vihar, Burla, Dist – Sambalpur – 768020 (Orissa ) Gram : SAMBCOAL, FAX : (0663) 2542797 Tel. : (0663) 2542973 E-mail : gm-enm.mcl@nic.in

A Mini Ratna Company

TENDER DOCUMENT VOL – I (Part-I)
NAME OF WORK : Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Commissioning & Trial Run of Coal Handling Plant with SILO Loading Arrangement at Bhubaneswari OCP, Jagannath Area complete with Civil, Structural, Electrical & Mechanical works of Conveyor System & SILO having Rapid Wagon Loading System along with allied auxiliary facilities such as Dust Suppression System, Passenger Lift, Fire fighting System, Plant Cleaning System , Illumination & Communication System, etc. as per requirement on Turn-key basis.

ELCTRICAL & MECHANICAL DEPARTMENT MAHANADI COALFIELDS LIMITED JAGRITI VIHAR,BURLA SAMBALPUR-768020 PHONE : 0663 – 2542973 FAX : O663 – 2542797 EMAIL : gm-enm.mcl@nic.in

BHUBANESWARI CHP & SILO

1

CONTENTS
Section PART - I Section - 1 Section - 2 Section - 3 Section - 4 Notice Inviting Tender Instruction to Bidders Forms of Bid and Qualification Information Conditions of Contract General Terms and Conditions of Contract Additional Terms and Conditions of Contract General Technical Conditions Erection Conditions of Contract Section - 5 Forms of Bank Guarantees, Form of Article of Agreement & Annexure 3 - 6 7 - 21 22 - 29 30 - 85 31 - 54 55 - 59 60 - 69 70 - 85 86 - 113 Contents Page Ref.

BHUBANESWARI CHP & SILO

2

SECTION -1
NOTICE INVITING TENDER

BHUBANESWARI CHP & SILO

3

TENDER NOTICE

COMPANY : MAHANADI COALFIELDS LIMITED PROJECT / AREA: BHUBANESWARI OCP, JAGANNATH AREA TENDER NOTICE NO: E&M/2011-12/NIT1. DT. / / 2011

Sealed turn-key tenders are invited from

You May Also Find These Documents Helpful

  • Powerful Essays

    Dddddddddddddddddddddddddd

    • 2588 Words
    • 11 Pages

    The Group has an ambitious plan to set up 20,000 MW thermal power, 200 MMTPA coal mines and 200 MMTPA port facilities by 2020. Currently, the Group is setting up 16,500 MW of coal based thermal power capacity, developing 100 MW solar PV plant and constructing a largest coal import terminal at Mundra Port. By 2012 the Group will be handling 100 MMTPA coal imports at Mundra Port and will produce 10.8 MMTPA coal at Indonesia Mine. Recently, in Queensland, Australia, the Group has acquired one of the largest coal tenements and has also been declared as a Preferred Proponent for building and developing port at Dudgeon Point. Besides, the Group also secured a rail and port project in Indonesia for transporting minimum 35 MMTPA of coal (expandable to 60 MMTPA) on a 'take or pay ' basis with off-take rights for 60% of that quantity. Consequently the Group will invest USD 1.65 Billion in Indonesia for building rail,…

    • 2588 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    •With the present rate of around 0.8Mt average daily coal extraction in the country, the…

    • 1722 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    High Vol Petro Analysis Coal Analysis As Received Dry Basis % Moisture 7.52 xxxxxx % Ash 5.10 5.51 0.79 % Sul 0.86 %Volatile 37.35 34.54 Fixed Carbon 57.14 52.84 13,522 BTU/lb 14,622 MAF BTU 15,475 FSI 7 Oxidation 96 ____________________________________________________________…

    • 1294 Words
    • 6 Pages
    Satisfactory Essays
  • Better Essays

    Mining is the extraction of valuable mineral or any other geological mineral from the earth. The first mining operation started at the beginning of human civilization. Modern mining operation consists of prospecting of ore bodies, reserve estimation, detailed geological study, profit calculation, ore or coal extraction by any process and after the ending of mining process reclamation of the mining area. Coal/Ore may be extracted by Open pit or Surface mining method and Underground mining method. The different underground mining methods used in India for extraction of coal are conventional method i.e. Bord and Pillar method, Longwall method, Shortwall method, Miniwall method etc. In India about 90% of U/G coal output is obtained by Bord and Pillar method and barely about 10% around by Longwall and other method. Bord and Pillar method is a conventional method but main disadvantage of this method is that in this method percentage of extraction is very less than other mining methods because a considerable amount of coal is lost in rib pillar which is left…

    • 1204 Words
    • 5 Pages
    Better Essays
  • Good Essays

    In a coal based thermal power plant, the initial process in the power generation is “Coal Handling”. So in this article i will discuss the overall processes carried out at a Coal Handling plant in a coal based thermal power generating station. T he huge amount of coal is usually supplied through railways. A railway siding line is taken into the power station and the coal is delivered in the storage yard. T he coal is unloaded f rom the point of delivery by means of wagon tippler. It is rack and pinion type. T he coal is taken f rom the unloading site to dead storage by belt conveyors. T he belt deliver the coal to 0m level to the pent house and f urther moves to transfer point 8. T he transf er points are used to transf er coal to the next belt. T he belt elevates the coal to breaker house. It consists of a rotary machine, which rotates the coal and separates the light dust f rom it through the action of gravity and transf er this dust to reject bin house through belt. T he belt f urther elevates the coal to the transfer point 7 and it reaches the crusher through belt. In the crusher a high-speed 3-phase induction motor is used to crush the coal to a size of 50mm so as to be suitable f or milling system. Coal rises f rom crusher house and reaches the dead storage by passing through transfer point 8.…

    • 1222 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Sands Corporation

    • 1011 Words
    • 5 Pages

    Sands Corporation has received a new contract from the government which cannot be full filled by them based on their existing capacity and therefore the need to start a new plant arises.…

    • 1011 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Mordenisation in Rly

    • 13702 Words
    • 55 Pages

    Railtel Corporation Of India Limited M/s Shambhu Singh Sr Goods Guard -TRAFFIC-OPTG C/o Snr DSTE DRM Bldg Eastern Rly DRM Building Asansol WB 713303…

    • 13702 Words
    • 55 Pages
    Satisfactory Essays
  • Powerful Essays

    Category Attractiveness

    • 1644 Words
    • 7 Pages

    Submitted By: Varun Puri Sr. No. :28 (AG 2) Roll No.R1805 A 19 Reg. No. : 10800464…

    • 1644 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Prior to that the environment ministry had carried out a joint exercise with the coal ministry studying nine major coal mining areas. fields (Singrauli,IB valley,Mand Raigarh,Sohagpur,Talcher,Vardha valley,Hasdeo-Arand, North karanpura and West bokaro). The ministry classified these blocks into categories:…

    • 1006 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Sample Tenancy Agreement

    • 2593 Words
    • 11 Pages

    THIS AGREEMENT is made on the 1st date of September 2001 BETWEEN COUGAR LOGISTICS (M) SDN BHD (Company No. 211819K), Lot 16, Lebuh Sultan Muhammad 1, Kawasan Perusahaan Bandar Sultan Suleiman, 42000 Port Klang, Selangor Darul Ehsan (the “Landlord”) of the one part and SUMISO (M) SDN BHD (Company No. 175561-H), B610, 6th floor, East Wing, Wisma Tractors, No. 7, Jalan SS 16/1, Subang Jaya, 47500 Petaling Jaya, Selangor Darul Ehsan (the “Tenant”) of the other part.…

    • 2593 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    hgghgh

    • 2274 Words
    • 10 Pages

    Other terms and condition of the said employment notice no 113 dtd 07/02/2014 will remain unaltered/…

    • 2274 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    Coal Handling Plant

    • 7246 Words
    • 29 Pages

    It is expected to keep a minimum ground stock of coal to cater to the requirement of the station for the period of 45 days. Thus besides unloading the coal received by various mode of transportation, coal handling plant has to perform two main functions (i) Stacking and reclaiming of cool to feed the boilers in case direct supply from mines fails (ii) To feed the boilers with the coal directly received from mines.…

    • 7246 Words
    • 29 Pages
    Powerful Essays
  • Satisfactory Essays

    orihainl oujkl

    • 378 Words
    • 2 Pages

    South Eastern Coalfields Limited is the largest coal producing company in the country. It is one of the eight subsidiaries of Coal India Limited (A Govt. of India ...…

    • 378 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Eco Health Center

    • 3363 Words
    • 14 Pages

    An asset can be defined as something that is of value to the holder of it. It ceases to be an asset at the point when the holder of it feels it no more valuable and when it so ceases to be an asset, he hurries to dispose it considering it a waste. An individual strives to protect his assets while he throws away the waste. This is the natural course of any transaction.…

    • 3363 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    The work safety of coal mines shall always be on top of all works, and the construction of large-scale coal bases and the cultivation of large-scale coal enterprises and enterprise groups shall be the mainstream. Pursuant to the requirements for the overall arrangement of collaborative development of the coal industry and other relevant industries, the overall arrangement of collaborative development of the coal exploitation and the ecological environment, the overall arrangement of collaborative development of the economy of mines and the regional economy, a new type of coal industrial system suitable for the socialist market economic mechanism shall be built, the continuous, stable and sound development of the coal industry shall be realized, and the construction of a conservation-minded society shall be accelerated so as to provide reliable energy resources for building a well-off society in an all-round way.…

    • 522 Words
    • 3 Pages
    Good Essays

Related Topics