CHECKLIST
Checklist B4 (Rev 1)
Site:
Date:
Inspected by:
Sl. No.
Check Points
1
Is the electrical power taken from an approved source? 2
Is the site electrical load calculated?
3
Is the insulation resistance tests carried out for the electrical system before commissioning?
Does it match with the power source capacity?
4
5
Is the Fuse Switch Unit provided with High Rupturing
Capacity (HRC) fuses?
6
Is a canopy is installed above electrical switchboard or weather protected equipment used? IP 65?
Is Miniature Circuit Breaker (MCB) distribution board provided for load distribution?
Is load balancing aspect considered while distributing loads?
7
8
9
14
Is 100 milli ampere Residual Current-operated
Circuit Breaker (RCCB) provided for leakage protection? Is double earth connections with two separate earth pits (as per IS 3043) provided at the main switch board?
Is Armoured Aluminium or Copper armoured (AYFY
/YFY) PVC cables with cable glands used for incoming cable?
Are extension boards provided with 30 milli Ampere
RCCBs and MCBs?
Are the extension board cords flexible & without joints and have tough rubber / PVC insulation & with cable glands /bush ends?
Are the extension boards weather proof? IP 65
15
Are plug tops to be used for all equipment?
16
Is the maximum load assessed before plugging equipment into extension boards?
Are all electrical equipment (portable tools, welding machines, extension boards, cords, cables, switch boards) are checked in the quarantine area?
Are electrical equipment checked & tested before issue of electrical equipment from stores?
10
11
12
13
17
18
Yes
No
Frequency
Initial
Check
Initial
Check
Initial
Check
Initial
Check
Initial
Check & M
Initial
Check & M
S
Initial
Check & M
Initial
Check & W
Initial
Check
Initial
Check
S&W
W
Initial
Check & M
Initial
Check & W
S
W
W
Sl. No.
Check Points
19
Is mechanical protection provided for cables? atop poles/ inside metal pipes
Are ELCBs trip