Energy Crisi in Pakistan
Tarbela’s 4th extension project to add 1410 MW
Posted by admin on August 22, 2011 in PkToday | 0 Comment
ISLAMABAD (APP) – The total generation capacity of the Tarbela Hydropower Station will touch 4,888 megawatt mark with the addition of 1,410 MW as a result of 4th extension project.
Official sources told APP on Sunday that the detailed engineering design, tender documents and PC-1 of the Tarbela 4th Extension Project were in active progress and would be completed by next month and would cost $5.5 million provided by the World Bank. M/S Mott MacDonald (UK) was hired for the detailed engineering design of the project. The sources said that the project would take four years after award of the contract.
They said the project would not only generate additional 1410 MW cheap hydel power but also save foreign exchange of $ 900 million spent on import of one million tons of furnace oil annually for equivalent generation of electricity from thermal resources. The World Bank has also shown interest in financing civil works and generating units of the project during the construction, they said.
The project will also provide a cushion to undertake rehabilitation and up-gradation of the existing Tarbela Power House during the lean period.
It is pertinent to mention that Tarbela`s 4th Extension Project is a part of least-cost energy generation plan, being implemented by WAPDA (Water and Power Development Authority) on priority to harness indigenous hydropower resources of the country with a view to improving the ratio of hydel electricity in the national grid.
50 MW coal power plant being installed in SIE
Posted by admin on September 23, 2011 in PkToday | 1 Comment
Punjab Industrial Estates (PIE) has completed initial work to install the first ever 50 megawatt (MW) coal power generation plant in Sundar Industrial Estate (SIE) in Lahore while process of getting license from NEPRA is underway.
For this purpose, the Board of Director of PIE has established a power

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Unit 5 Assignment 1

    • 297 Words
    • 2 Pages

    The main problem in the construction of the Dulhasti Power Plant Project is the project cost estimation and delivery. The project was based on a straight concept: Dilhasti was designed as a 390MW hydroelectric power plant to be built on Chenab River in the Doda region, The project was supposed to build a hydroelectric generating station, and string hundreds of miles of transmission lines starting near the headwaters of a system of rivers flowing onto the plain south of the mountain region.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    On June. 12th , 2016, a gun crime took place in a club in Orlando, which took 49 lives and injures 53 people. This issue made people realize that gun violence is a big problem in America. We know that many gun crime happened in the USA in history and guns control became a hot spot nowadays.…

    • 886 Words
    • 4 Pages
    Good Essays
  • Good Essays

    * Power from running water currently supplies 1.25% of the country's electricity, providing virtually emission-free power once the initial impact of building the plant has been…

    • 741 Words
    • 3 Pages
    Good Essays
  • Better Essays

    What makes Thailand to one of the best locations for a solar power project - except its sun?…

    • 1905 Words
    • 8 Pages
    Better Essays
  • Satisfactory Essays

    Dependency on Technology

    • 638 Words
    • 3 Pages

    Starting in 1957, the initial phase of the construction was completed in 1962. By this time the dam, spillway, penstock and two 40 MW Kaplan turbine-generators were built within the power station. In August 1982 a 50MW generator was comissioned. In October 1988 the 4th and 5th generating units, both 50 MW Kaplan-type turbines, were installed which raised the total generation capacity to 230MW.[3] The total cost of Unit 1, Unit 2 and a part of Unit 3 was Rs. 503 million and the total cost of extension was Tk. 1,900 million. The project was financed by the East Pakistan…

    • 638 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    A World Bank-funded project in Tajikistan is due to start in 2014. It will comprise a large hydroelectric power station in the mountains and 100km of four-lane carriageway, which will extend from the power station to a new retail park. There will also be 100 new apartments next to the retail park. The retail park and apartments will be powered by the electricity from the new power station.…

    • 3804 Words
    • 14 Pages
    Powerful Essays
  • Best Essays

    This project will handle issues of using renewable sources of energy, such as wind power, to generate electricity side by side to the old school generator that runs on oil. The goal of this paper is to determine if this project would save money for the company in Saudi Arabia. If the project proves to be successful, Saudi Electric Company will implement the solution. Through this research, surveys and interviews are going to be personally conducted with people who are in charge. Online sources such as, ebrary will be used during this research to establish facts.…

    • 1700 Words
    • 6 Pages
    Best Essays
  • Good Essays

    Location of raw material: Raw material oriented factories; weight of input >>> weight of output.…

    • 903 Words
    • 4 Pages
    Good Essays
  • Good Essays

    SUMMARY OF ENERGY SAVINGS ACHIEVED BY INDUSTRIAL UNITS PARTICIPATING IN MINISTRY OF POWER’S ENERGY CONSERVATION AWARD SCHEME (1999, 2000, 2001, 2002, 2003, 2004 & 2005)…

    • 637 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Hydroelectricity and its Potential in Pakistan Muhammad Uzair Khan (2010-MC-07) Hassan Javaid (2010-MC-20) Syed Muhammad Talha Zaidi (2010-MC-54) What is Hydroelectric power? Renewable source of energy…

    • 591 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    Energy Crisis in Pakistan

    • 947 Words
    • 4 Pages

    According to a forecast by Pakistan’s Private Power & Infrastructure Board, the power supply and demand gap will grow to over three times its current size by 2020…

    • 947 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Progress Report

    • 596 Words
    • 3 Pages

    On 21 November 2011 the Brightside Municipal Council approved electrification of Zone 11, based on the applications received from households, community centers and businesses. Approved project dates: 15 February 2012 to 15 March 2013.…

    • 596 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Swot Analysis

    • 524 Words
    • 3 Pages

    To help household to lessen their payment from expensive and not reasonable cost of electrical bills…

    • 524 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Ta Energy Case Study

    • 1790 Words
    • 8 Pages

    Long-term stable customer was a key for the success of the project. Ayhan made a contract with RG Holding to sell 19MW for 10 years. From the purchase contract of RG Holding, he could finance in total $32million from bank loans. The supply of gas and oil was also important to run the power plant. Ayhan made 20 years’ contracts with BOTAS and British Petroleum for the supply at fixed prices. For the opertation of the plant, he made an agreement with International Power Corporation for three years.…

    • 1790 Words
    • 8 Pages
    Good Essays
  • Powerful Essays

    Nuclear

    • 2567 Words
    • 11 Pages

    Together they produce 273 billion kWh per year, all from fossil fuels (2003) and 5-7% annual demand growth. They have total installed capacity of about 80 GWe, with a common grid. There is also a large demand for desalination, currently fuelled by oil and gas (directly or indirectly). A 2009 report projects GCC electricity demand increasing 10% annually to 2015, and desalination demand growing at 8%, implying the need for 60 GWe of new capacity by 2015.…

    • 2567 Words
    • 11 Pages
    Powerful Essays