development of a country.
it is considered to be life line of
any economy and most vital instrument of socioeconomic development of a country.
There are many types of energy in this world which are obtained from different sources,
But in Pakistan main sources of energy are
(fossil fules, petroleum products, natural gas, coal, wind, nuclear, hydro power)
Pakistan is producing very less energy then demand. Main issue of energy is because of
Growing Energy Demand, Lack of proactive and integrated planning for production of Energy
and Imbalanced Energy mix.
Because of energy crices Pakistan is facing many issues like bad economic factors, less agriculture production,
shut down of many industries social issues and the issue which is worse and effecting Pakistan badly is unemployment.
To control these issues Pakistan main project is kalabagh Dam.The energy generated at Kalabagh would be equivalent to 20
million of oil per year.
Kalabagh wit its installed capacity of 2400 MW (ultimate 3600 MW) would add to the system a very large chunk of
cheap hydro-power.
In an average year, 11413 million kilowatts hours (MKWh’s) of electricity would be generated at Kalabagh.
Pakistan needs Kalabagh Dam not only because of energy issues but to control Floods are detrimental.Kalabagh would store
surplus water in the flood season and make it available forcontrolled utilization during the low flow season.
Kalabagh Dam Project was designed in 1984, with the assistance of the United Nations
Development Program; supervised by the World Bank, for the client Water and Power
Development Authority of Pakistan.It was estimated to cost US$ 3.46 Billion at June 1987
level and was scheduled to be completed in 6 years, Kalabagh Dam Project would be
located on river Indus 100 miles south-west of Pakistan’s capital