Which of the following is conducted as a follow up to a system's recent implementation?
A) Troubleshooting
B) a systems survey
C) a post-implementation review
D) systems maintenance
Points Earned:
1.0/1.0
Correct Answer(s):
C
2.
After the conversion is completed, the systems development project team writes the project completion report.
A) True
B) False
Points Earned:
0.0/1.0
Correct Answer(s):
True
3.
Which of the following is not a task required to complete structured systems analysis?
A) develop the budget for the next two system development phases
B) develop the physical requirements for the selected design
C) develop the system survey
D) develop logical specifications for the selected design
Points Earned:
1.0/1.0
Correct Answer(s):
C
4.
Which of the following ranks each alternative on its relative capability to satisfy the user's requirements (goals) for the system?
A) the cost/effectiveness study
B) the intangible benefits analysis
C) the effectiveness analysis
D) the cost/benefits analysis
Points Earned:
0.0/1.0
Correct Answer(s):
C
5.
Which development phase has the purpose of developing specifications for the new or revised system?
A) implementation
B) design
C) operation
D) analysis
Points Earned:
1.0/1.0
Correct Answer(s):
D
6.
Systems maintenance is the modification of existing applications.
A) True
B) False
Points Earned:
1.0/1.0
Correct Answer(s):
True
7.
Systems operation includes the post-implementation review.
A) True
B) False
Points Earned:
1.0/1.0
Correct Answer(s):
True
8.
The GL/BR process is an interacting structure of people, equipment, activities, and controls that is designed to accomplish both operations and information system functions with the purpose of generating accounting and other reports.
A) True
B) False
Points Earned:
0.0/1.0
Correct Answer(s):
True
9.
Inputs to a GL/BR process typically include all of the following except:
A) adjusting entry journal voucher
B) adjusted trial