FORMS OF SUBSTRUCTURE

Tutor: David Brooke

Submission Date: 14 December 2012

FORMS OF SUBSTRUCTURE * Table of Contents
Site 1 1
Site 2 2
Site 3 3
Precautionary actions and temporary works 4 1 Bibliography 5

*
Site 1
Dry compact gravel, or gravel and sand subsoil’s are usually suitable for strip foundations. Mostly 700mm to 1000mm deep foundations are acceptable as long ground has suitable bearing capacity.
If the water level is high than the bearing capacity will reduce, so in this case foundations should keep higher than normal. In this condition a shallow and wide strip foundation can be used, and reinforced foundations can also be useful.
As the safe bearing capacity of compact gravel sub soil = 100kN/m² (Chudley & Greeno, 2010)
This safe bearing capacity is for 1 m², for .5 m² it will be 50kN.
W = LoadBearing Capacity
W = 68kN/m ÷100kN/m²1000mm
Required Width = 680mm
It can also be chose from table provided, according to which because loading size is nearly 70kN/m for which 650mm wide foundation is required.
As per table accurate measure can be: 650mm70kN/m×68kNm=631 mm
So foundation width can be 635 mm wide or for safety it can be increase up to 650mm.
As the plot is adjacent to coast it is difficult to pump the water outside. Piled foundations can be another option which can be use to do the construction in coastal environment.

* Site 2
As the subsoil is Clay, Short Bored Piles foundation can be used it will be suitable for two story domestic building. As the plot was used as an orchard before so the moisture which was stopped due to trees will come again and cause soil swelling. So heave will occur on this type of plot. Due to heave deeper foundations need to build, by this cracks will not occur in foundations. Again pile foundations can be use on this type of land. Water can be pump out from the site. (Chudley & Greeno, 2010)
Heave is upward movement of soil. It is the process when moisture added



Bibliography: Chudley, R., & Greeno, R. (2010). BUILDING CONSTRUCTION. Oxford: Elsevier Ltd.

You May Also Find These Documents Helpful

  • Good Essays

    Strategic Management

    • 1245 Words
    • 5 Pages

    References: to block size are based upon a standard block which is up to 700m2 with up to 1m fall across the block. "M" class soil classification, all services within boundaries, garage setback up to 5.5m from front boundary, even cut and fill.…

    • 1245 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Soil Investigation: Prior to any foundation design or excavation work to take place, soil Geotechnical Investigation using process is carried out by a competent contractor, this to explore the surface and subsurface of each foundation. A CME-45B Truck Mounted Auger Drill is used retrieve soil samples, all samples are tested in an off-site laboratory. The truck operators are usually exposed to various types of…

    • 456 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Report1

    • 274 Words
    • 1 Page

    = 1 Mg. Start your analysis by drawing the free body diagram for the configuration, and identify what data you are using. The manufacturer’s installation suggests sufficient concrete…

    • 274 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Add 2-3” of moist sand to the bottom. Coarse sands are good to use. Do not use beach sand.…

    • 442 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    it you fix it to a foundation of 3 to 5 feet deep and up to 4 to 10 feet…

    • 110 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    1. Determine the overall cavity width by adding the thickness of insulation required to the residual cavity width (50 mm minimum).…

    • 1075 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    5.2 Safety Meeting

    • 1621 Words
    • 7 Pages

    All piers and excavations are required to have a 6 foot perimeter around the hole/excavation to prevent objects from falling inside the hole.…

    • 1621 Words
    • 7 Pages
    Powerful Essays
  • Best Essays

    Building Technology

    • 1732 Words
    • 7 Pages

    The type of foundation used to support a building is dependent on the type of in-situ soil, the bearing pressure of that soil and the loads imposed by the structure on the soil. The Building regulations state that the minimum depth to the underside of a strip found is 0.45 for frost protection and this should be extended to 0.75 in clay soils, largely due to the water retention in these materials ( Osbourn and Greeno 2007). This depth is also required to protect the foundation from seasonal variations of moisture content in a clayey soil.…

    • 1732 Words
    • 7 Pages
    Best Essays
  • Good Essays

    Gman

    • 525 Words
    • 3 Pages

    The second design improved drastically on the first by utilizing Matlab to produce contour maps of the sandbox. The advantage of this was the computation of a perfect location, given the program directions, of the footprint. A position was calculated by Matlab in an area which put the total sand useage at 5.05 litres. Although it calculated that 0.05 litres would have to be brought onto the site, the cost of doing this was significantly less than the previous at $5 000 due to the $100/mm^3 penalty. This was an important improvement on the first design which calculated the removal of sand as $81 250. An issue arose however that involved the numerical model not taking into account the fact that the embankment could not come into contact with the edge of the sand box. With this, a third design was conducted.…

    • 525 Words
    • 3 Pages
    Good Essays
  • Good Essays

    The Atomic Blazer 7’ Hockey Table was manufactured by Escalade Sports and this company is an Indian archer and toy company which started its operation in 1927. Ever since, the company has grown to become an international brand manufacturer and distributor of sporting goods.…

    • 838 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    What Is a Good Doctor

    • 1821 Words
    • 8 Pages

    What is a good doctor? What makes a good doctor perfect? In the articles "Phlebitis" by Lair Eigther,"The Doctors as Stranger" by David Rothman, and the book "The Spirit Catches You and You Fall Down" by Anne Fadiman these authors state different situations and outlooks the patients were in. For instance the writers explored whether the patients had good medical treatment. Furthermore the authors view the disconnection between the doctors and the patients on how physicians should be able to train differently so we can enrich the relationship between the doctor and patient.…

    • 1821 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Dampness & Waterproofing

    • 292 Words
    • 2 Pages

    Since we live in an environment that has vast temperature changes, and endure freezing, poorly built foundations can crack, which leads to water infiltration. Backfilling is important, both as to the method and materials used to avoid problems. Backfill soil should allow infiltrating water to drain to the drainage tile, as stated in the code “backfill shall be graded to prevent drainage towards the foundation after settling” 9.12.3.2 . Proper backfilling should start around the corners, then along shorter walls, and finally along the longer sections, this will help prevent stress cracking during backfill. Soil should be placed carefully, so you do not disturb the drainage tile and granular cover.…

    • 292 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    a. Write the equation for the reaction observed. (When you blow your breath in the…

    • 286 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    FISHPOND SITTING

    • 850 Words
    • 4 Pages

    The first thing you need to consider when preparing a fishpond construction site is the type of fishpond you are going to build. Primarily, there are two types of fishponds namely dugout concrete fishponds and dugout excavated fishponds. In the former, the fishpond is built of concrete materials and therefore, it is relatively costly to prepare the site. In the latter, the fishpond is built by simply digging out the selected fishpond construction site and as a result, it is easier and more economical to build.…

    • 850 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    drugs

    • 3447 Words
    • 14 Pages

    1.7. The net shall be 760 mm in depth and at least 6.1 metres wide.…

    • 3447 Words
    • 14 Pages
    Powerful Essays