1. The plant has a poor quality attitude. Quality department isn’t taken seriously by production people. We can understand this from the behavior of the foreman. Wayne Simmons vented the products without even consulting any inspector or employee of the quality department.
2. Operators for the filling equipment are not trained enough to run the equipment. As it is mentioned in the text, operators were transferred from a different department only two weeks ago without any experience.
3. Filling equipment was not designed for the production of Greasex. Therefore the machines are needed to be adjusted and repaired to fit the manufacturing. With respect to this requirement, twelve work orders were placed in the last six months.
4. The plastic nozzle heads purchased from out sources do not fit to Greasex cans and this problem is not properly fixed. They force the heads to fit the cans.
5. The design of the cans have been changed due to market research without any further testing. But this design may cause some problems on filling speed or hydrodynamics.
6. Due to the high pressure in defective cans, venting holes on the cans was