After creating the resource pool, copy the screen image of Resource Sheet and paste into the Word document.
After assigning resources, copy the screen image of the data entry screen and paste into the Word document.
After time-constrained scheduling, copy the screen image of Resource Sheet and paste into the Word document. The Resource Sheet should show the resources that over-allocated.
After resource-constrained scheduling, copy the screen image of Resource Sheet and paste into the Word document. The Resource Sheet should show the resources that over-allocated.
Part 3B
After adding the two internal development teams and doing time-constrained resource scheduling, copy the screen image of Resource Sheet and paste into the Word document. The Resource Sheet should show the resources that over-allocated.
After adding the two external development teams and doing time-constrained resource scheduling, copy the screen image of Resource Sheet and paste into the Word document. The Resource Sheet should show the resources are no longer over-allocated.
After generating the Cashflow report, copy the screen image and paste in to the Word document. Change time scale to months.
Answer all the questions given in Part 3 (five questions from Part 3A and three questions from Part 3B) and Part 4 (all questions). Submit your answers along with the screen shots as listed above as Appendices to the instructor through the Assignment tab on the Blackboard for evaluation.
In addition to the general instructions included in the Overview of this topic, you might find the following notes helpful in doing the Conveyor Belt homework.
Part 3A Notes
Enter resource names from Table A2.12 For “Assembly/Test” enter “Assembly” for consistency with Table A2.11.
Enter one team as 100% and two teams as 200% under Maximum Units.
Part 3B Notes
1. Add the two internal development teams for a total of four internal development teams to the resource pool. Level within the available