Second, jaw crusher , the battery in a dry and frost place arrangements jaw crusher , construction machinery electrical systems are due to negative ground jaw crusher , such as the paver screed , bucket loaders , graders machine scraper and so on.
Third, after the park covered with drop cloths jaw crusher . Restraint fuel tank rust. And held its thorough order. Then connect the negative cable jaw crusher , from the curb negative line tension jaw crusher . Long-term storage jaw crusher jaw crusher before .
Fourth, jaw crusher mechanical fuel control lever should be placed in the idle position , as conditions permit, should participate in preservative jaw crusher . So that all parts of the oil film lubrication at creating a new jaw crusher , change the engine oil. Rust problem : storage before , will not corrupt the engine metal parts diesel fuel tank fill .
This article comes from vipeak strong jaw crusher official website www.vipeakgroup.com/ strong_Jaw_Crusher.html, reproduced, please renowned provenance