Preview

How to prolong chain grate boiler operating life

Satisfactory Essays
Open Document
Open Document
310 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
How to prolong chain grate boiler operating life
How to prolong the chain grate boiler operating life
The longer service life of chain grate boiler can reduce investment costs,accord with the requirement of national energy saving at the same time,in addition to the requirements of maintaining a relatively stable furnace conditions by avoiding stopping,decreasing,and increasing the wind frequently,we also should take the following measures to prolong the operating life of the chain grate boiler.
Masonry stove operation:masonry quality has a significant impact on the chain boiler furnace life, there should be someone to check ramming knot density.Refractory brick masonry cracks should be less than 1 mm,and mortar joint mud should be full to prevent drilling iron.Furnace bottom of the cylinder adopting the aluminum carbon bricks adding plastic and carbon ramming material can effectively slow down the bottom erosion,especially after adopting the dry hearth and pressure eliminating slag process,the furnace service life has been greatly improved.
Strengthening the furnace blow-in operation:according to the stipulated time and temperature to warm the furnace,add the batch of material after the bottom coke pass the fully burning,after adding the iron material,damping down for 30min to preheat the furnace burden thoroughly,and strictly control the bottom coke height at about 2000 mm,make sure to see the iron drops at about 30min after the air supply,supply air strength shall be controlled in a certain range according to the production requirements of melting rate,the initial re-open of furnace should not blindly use large air volume.
The above is the simply analysis about prolonging the operating life of chain grate boiler,we still have many to do to achieve that.ZG chain grate boilers has been hailed as the best design solution,has the world advanced level,pleasure feel free to contact us for more details!
http://www.zgvessel.com/coal-fired-boiler/

You May Also Find These Documents Helpful

  • Powerful Essays

    Unit 4222-371

    • 20924 Words
    • 84 Pages

    CONVENTIONAL FLUE AND ROOM SEALED BF FLOOR STANDING COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER…

    • 20924 Words
    • 84 Pages
    Powerful Essays
  • Good Essays

    Bricks made from silica (silicon dioxide) are used to line furnaces that operate at high…

    • 272 Words
    • 2 Pages
    Good Essays
  • Good Essays

    When you order a custom fire pit, it is very important that you know how to maintain it so you stay safe and get the most out of your purchase. I will go over the owner's manual with you before I close the purchase so you understand everything you need to know. If you have any questions once your fire pit is complete and ready to go, I am always available to assist you long after the purchase was made. You can turn to me for any of your fire pit or oven needs and I will be there for you without…

    • 1654 Words
    • 7 Pages
    Good Essays
  • Good Essays

    dksd dksmdfklda dksmdfmsd dfdsa sdfds sdfas d gfgdsf sd fsd d s d sd d gsdf gs d fgsd f g sd d g d g df d dfgf d g dff d sf s f sf d s f s f s f sdgfsdf sdf s d g sdf d d f f d sdddddddddd f gf d f ff f f s d gs df sdfgwsgsd gfsdfljkljgs sjgfskjflskjgsl sjflskjsjg skgsjjljdf s jskjljlsjlkjs sjfkjsdflgsenters the boiler at a pressure of 18 MPa, and…

    • 838 Words
    • 3 Pages
    Good Essays
  • Good Essays

    The first type of iron was the “pig iron”, produced with a high carbon level that makes it rigid, hard and fragile. In 1710 were introduced the coke smelting iron, but until 1750 this new product was not widely used; the reduced costs of pig-iron allowed the use of cast iron in many more applications, especially in constructions. In this case the innovation is not due to the costs of the material but to his resistance to fire hazard, caused by an increase in the use of steam energy in the textile mills.…

    • 2670 Words
    • 11 Pages
    Good Essays
  • Good Essays

    The first Grate-Kiln System pellet plant was installed in 1960. The plant took iron ore concentrate and produced superior iron ore pellets for blast furnace and direct reduced iron feed. Since then, Grate-Kiln Systems have been used for over 50 plants, on both magnetite and hematite ores, with an installed capacity of over 115 million tpy.…

    • 978 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Induction heating is a non-contact heating process, in which intense electromagnetic field generated by an AC current is used to heat the job. The shorter and higher temperature cycle in Induction heating yields the same mechanical properties as obtained in a conventional roller furnace where the tempering cycle time is higher. The high frequency induced generates skin effect, which ensures that the current will flow in a thin layer in the surface of the work-piece. This increases the effective resistance of the metal and enhances the heating effect.…

    • 1684 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    When the ignition, rotary kilns occur blasting because of low temperature, the reason is a low ignition temperature in the kiln, with coal combustion is bad, when the coal falls to a certain extent ,burning fierce,causing local concentration of heat, blasting phenomenon occurs. Prevention method is to maximize improve the ignition temperature, reducing coal consumption, shorten the ignition time. The rotary kiln in the application area, the numbers to be most cement industry. The whole process ofcement production line summarized as "two ground a burn," with "a burning," is made by grinding good raw material, in the high temperature of kiln under the action of the process of burning become clinker. The equipment is also widely used in metallurgical, chemical, building, refractory material, environmental protection, and other industries.…

    • 351 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    competitive technologies like DC is limited. In all furnaces fluxes are used to optimize the slag composition.…

    • 1834 Words
    • 8 Pages
    Good Essays
  • Good Essays

    Arcelormittal Case Study

    • 987 Words
    • 4 Pages

    In addition, ArcelorMittal will invest around PLN 200 million in its Krakow-based plant for the relining of the blast furnace 05, which is coming to the end of its life cycle in mid 2016. Once the relining is complete, it will increase Krakow's hot-rolling mill capacity by 900,000 tons per annum, while the hot dip galvanizing capacity will increase by 400,000 tons per annum. Thus, it is evident that ArcelorMittal is taking the right steps to address the opportunity in the end…

    • 987 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    1. Setting, coal feeding point position and quantity, to consider the raw material before charging with sufficient space for the fuel combustion, especially for difficult combustion of anthracite, but also introduced three times the position of the wind direction, etc., not only to ensure uniform pulverized coal combustion in full, the whole furnace in the thermometer minimum temperature difference between both should not exceed 20 ~ 30 degrees Celsius.By improving the mixing of the raw material and coal powder level, how to improve the heat transfer equilibrium.For the larger, should not only set a charging point and coal point, need appropriate layout more.…

    • 385 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Thermo

    • 343 Words
    • 2 Pages

    Newton’s Law of cooling applies – the rate of heat transfer from the surface is proportional to the surface area, As, and to the temperature difference between the boiler surface and the surroundings ( T- T).…

    • 343 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    The ZG traveling grate steam boilers have won the high praise form customers at home and aboard because of its significant advantages such as strong adaptability of coal and high operating efficiency,customer satisfaction is our…

    • 354 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    engineering design project

    • 1079 Words
    • 5 Pages

    The specimen erected onto the test furnace with the brick wall constructed of ordinary bricks of nominal size 240mm x 120mm x 60mm, with 240mm side as the wall thickness, surrounding it.…

    • 1079 Words
    • 5 Pages
    Good Essays
  • Better Essays

    Industrial Boilers

    • 4041 Words
    • 17 Pages

    External examination of the boiler should include the visual inspection of the outer surfaces during operation as stated earlier. Other external points that should be inspected and examined include the gauge glasses, water column(s), water level controls, high and low-water alarms and cutoffs, blowoffs, blowdown, feed water valves, check valve, feed line at the entry to the boiler, safety valves, and boiler stop valves or non-return valves. All piping connecting these various controls and accessories should be checked to make certain there are no deposits to stop or impede proper flow through the piping and to the controls.…

    • 4041 Words
    • 17 Pages
    Better Essays

Related Topics