Preview

Hp Case - Deskjet

Powerful Essays
Open Document
Open Document
1397 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Hp Case - Deskjet
MARKETING CHANNELS

EXECTIVE SUMMARY
This case study deals with Hewlett-Packard (HP), a famous manufacturer of computers and peripherals. In the early 1990s, HP faced a socalled “Inventory/Service-Crisis” concerning one of their high volume products, the DeskJet printer. Despite growing inventory levels at the distribution centers in Europe and Asia-Pacific, customer service levels were unsatisfactory. Affected by growing competition this problem had to be handled quickly.

EXECTIVE SUMMARY
• Brent Cartier, Manager for Special Projects in the Materials Department of HP Company’s Vancouver Division, had tried his best to find the possible solutions of the issues related with inventory of DeskJet printers that were arisen at world level especially, at Europe. He had short time for these tasks because preparation was needed to be done for Monday’s meeting with Group Management on worldwide inventory levels for the DeskJet Printer product line. • Finally opinions and reactions of different company divisions concerning the implementation of DC localization are analyzed. The solution of problems is the reconfiguration of key strategies related with channel’s management.

Improvement during the early 1980s
– Manufacturing cycle time reduced
» 8-12 weeks ==> 1 weeks

– Average inventory reduced
» 3.5 months ==> 0.9 months

– All finished goods inventory eliminated – Importance of response time and transportation time increased – Further improvements should be made on supply chain

Improvement during the early 1980s
– Manufacturing cycle time reduced
» 8-12 weeks ==> 1 weeks

– Average inventory reduced
» 3.5 months ==> 0.9 months

– All finished goods inventory eliminated – Importance of response time and transportation time increased – Further improvements should be made on supply chain

Improvement of supply chain in 1990
Comparison of Response Time (months)
6 5 4 3 2 1 0
Europe & Asia NorthAmerica

– Time between order and delivery

You May Also Find These Documents Helpful

  • Powerful Essays

    4. In supply chain improvement, it is often necessary to reduce the setup time of equipment dramatically so that smaller lots of the product can be economically produced.…

    • 4131 Words
    • 19 Pages
    Powerful Essays
  • Powerful Essays

    1) It stabilized and improved basic business processes. It developed enhanced supply-chain capabilities, including fast delivery of customized product. It purchased a rash of new software applications. Underlying the entire project was a desire to integrate supply-chain strategy with that of the organization as a whole.…

    • 838 Words
    • 3 Pages
    Powerful Essays
  • Satisfactory Essays

    Case Study

    • 305 Words
    • 2 Pages

    * Too many warehouse, need to reduce the amount to reduce inventory can only reduce the fixed cost, will rake longer time and cost more like transportation…

    • 305 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Describe the organization, the inventory problem it faces, and the expected benefits that are motivating the organization to implement a solution.…

    • 285 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    1. Improvement in days sales outstanding and inventory turnover and increase in same day shipments…

    • 383 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    CASE STUDY WESTMINSTER

    • 1008 Words
    • 4 Pages

    Westminster Company is a giant Global manufacturer of health products whose brand has been recognized by the world. As the company they have three different operations which produce and distribute different product lines. Their main strategy on which they are working and which is a major success for them is decentralized management. Now they are re-evaluating their traditional supply chain strategy because the company is getting too much pressure from their large domestic’s customers and global customers. Now the company has to study on customer’s composition and customer service requirement. The Westminster Company has to identify accurate and efficient inventory delivery would be another key to success in future. Westminster Company is trying to implement three major changes for their company which are focus on reducing of their order cycle time, focus on customer requirements and changing to forecast response based on sales information.…

    • 1008 Words
    • 4 Pages
    Satisfactory Essays
  • Better Essays

    Blozis Case

    • 1182 Words
    • 5 Pages

    The Blozis Company currently face challenges in their supply chain due to a variety of reasons. The company which manufactures products that are complex, technological and engineering driven have poor procurement procedures that are creating issues for various departments in there organization. Blozis needs to make changes to a variety of steps in the supply chain in order to maximizes there employees skill sets and insure product is ordered to specification, timely, accounted for properly, received and expedited in order to maximize the companies efficiencies and create less problems in the supply chain. I recommend that Blozis should change make changes to some of the procurement staff duties to better utilize their skill sets and create an easier purchasing process for the operations department. The company must also invest in up to date software to gain the ability of tracking expenses to particular areas as well as knowing when and where goods have been received in the organization.…

    • 1182 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    According to various performance metrics, Amphlett could report to Senior VP for Supply Chains that Thor Industries was managing inventory well compared with its competitors in the industry. If they implemented a more frequent production cycle, so to reduce the inventory level one step further, the company might eliminate waste and reduce costs.…

    • 330 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    strategies in order to achieve this goal. Some of them focus on customer satisfaction and quick delivery, while others may be more concerned about minimizing inventory holding costs. d. In general, different parts of the supply chain have objectives that are not aligned with each other. 1. Purchasing: Stable order quantities, ßexible delivery lead times and little variation in mix. 2. Manufacturing: Long production runs, high quality, high productivity and low production costs. 3. Warehousing: Low inventory,…

    • 12423 Words
    • 50 Pages
    Powerful Essays
  • Good Essays

    Body Shop International

    • 1594 Words
    • 7 Pages

    • To achieve operational efficiencies in the supply chain by reducing product and inventory costs;…

    • 1594 Words
    • 7 Pages
    Good Essays
  • Good Essays

    to identify the most serious problems in global supply chains and begin to improve them.…

    • 719 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Spartan Heat Exchange

    • 606 Words
    • 3 Pages

    4. Based on new product category, review the vendor list and reduce the number of vendors from 350. Especially in area of aluminum products.…

    • 606 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Supply Chain Management

    • 1921 Words
    • 8 Pages

    In 1990’s, Hewlett-Packard faced several problems with inventory levels for the Deskjet Printer product line. This printer was produced in Vancouver’s facility and from there was shipped to a distribution center. HP has three distribution centers (DC), in North America, Asia Pacific and Europe that at the moment were filled of Deskjet stock.…

    • 1921 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    Inventory: As describe above, the current inventory levels held at the regional offices already reflect a 75% reduction in comparison to historical…

    • 1424 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Case Analysis GAP Inc

    • 1079 Words
    • 7 Pages

    h. Improve vendor relationship, optimized store fleets to quicken response time, better inventory system, improve promotions, improve store facilities, and improve on-line interactive facilities.…

    • 1079 Words
    • 7 Pages
    Good Essays

Related Topics