Hazards and consequences CONTROL MEASURES
Immediate and longer-term actions TIMESCALE
1. Working at high in hopper area while mixing. Immediate: Workers should keep the hopper gate closed. Immed Longer-term: Sign of closed door to be in place 2 weeks
RISK: RISK OF FALLING FROM HIGH 2. Crane boom holding in any equipment while operating crane at high level. Immediate: banks man to be in place. Immed Longer-term: Always use banks man while using any operation machine. 3 days
RISK: RISK OF LAKE OF VISION 3. Unwanted material kept on the rig floor. Immediate: housekeeping should be done. 1 day Longer-term: Tours and inspection must be carried. 2 weeks
RISK: RISK OF TRIPPING HAZARD 4. Fire Extinguisher available in All vehicles Immediate: No action required. Cont Longer-term:
RISK: NO RISK 5. Web slings not certified and in poor condition can cause Risk of falling object. Immediate: Damage the old sling and use new web slings 1 day Longer-term: All lifting Equipment must be certified and certificate must be in place. 1 Month
RISK: RISK OF FALLING OBJECT 3 days
6. Fire hose is in bad condition and it leaks. Immediate: change the Hose with new one. Longer-term: drills to be carried out and check the hose regularly weekly
RISK: RISK OF FIRE PROCEDURE 7. Eye wash station on top of an electric panal. Water can leak on the electric panel. Immediate: remove the eye wash to other safer location Immed Longer-term: check all electric panels condition. 2 weeks
RISK: RISK OF ELECTRIC FIRE 8. Food provide in bad containers and warmers. Immediate: provide good quality of containers and wormers. 3 days Longer-term: make a check list for the warmers 3 weeks
RISK: RISK OF FOOD POISON AND CONTAMINATED 9. OBS leak in BOP pipe ram this can cause well control issue. Immediate: stooped operation and fix the leak. Immed Longer-term: pressure test before starting any