CDYV Company.Inc Introduction:
Orange Creek, Inc., a Fortune 500 company, has moved into Lexington and is requesting bids for implementing a network infrastructure for their banking software company. The primary function of the new building is to provide office space for software development and testing of their homegrown banking software. Both levels of the building are dedicated to development, test, onsite IT staff, management, and administration.
Body: RFP Request for Proposal
PROJECT SCOPE ● Goals and Objectives Goals
Objectives
The main objective of the project is to create and present a bid for designing and implementing a network infrastructure for Orange
Creek, Inc.
1. The entire building must have secure WiFi.
2. The network must be speedy enough to accommodate
VoIP traffic as well as large spikes of Web traffic.
3. Each floor requires five “servers” for development and test.
One floor must contain two additional “servers” to serve as a QA environment.
4. The corporate backbone must have a robust email server, along with LDAP authentication and Active Directory permission for intranet sites.
● Project Deliverables
Milestone
Deliverable
1. December will be for Initiation and Design
2. January is for checking the final design 3. February is for Execution/
Implementation
4. March is for Closing system testing, bug fixes.
● A fully functional wired and wireless network infrastructure.
● A fully functional setup for the servers of the deployment and test team and also the email server.
● Complete connection of all the VoIP phones.
Network Design
: (Microsoft Visio)
Timeline:
Equipment configuration ●
●
●
●
●
●
●
●
●
●
●
Firewall + Router
Uninterruptible Power
UPS Network Manager Controller
NAS
Network Switch
Desktop PC
Wireless Manager Controller Switch (with PoE)
Wireless