construction and other related projects executed by the company.
We have grown and developed since those early days and many changes have taken place over the intervening years. Throughout these years of change, our philosophy has remained constant: to build quality and cost effective roads for our esteemed clients and this we believe is the reason of our continued success.
The company's desire to be better equipped to handle various road construction projects spurred it into the commissioning of an Asphalt plant at Asaba in 1992. This was followed by the acquisition of an assemblage of Stone Crushing Plant and allied Quarry Equipment in order to facilitate the availability of granite chippings for use on its construction sites. As the company continued to grow from strength to strength and the road contracts we handle increased astronomically with every passing day, INTER-BAU braced up to the challenge by commissioning another Asphalt plant of 200 tons per hour capacity in 2001 at Asaba, followed by the purchase of another 160 tons per hour Asphalt Plant in 2007.
At INTER-BAU, our major areas of specialisation include Civil/Highway Construction and Engineering Works, Building Engineering Construction, Bridges and allied structures, Flood and Erosion Control Works, Architectural/Structural Design Works and Engineering Consultancy Services. We have proven record of quality service in all these specialisation areas, and we shall continue to respond positively to challenges posed by Nigeria's