Preview

Investment Avenue

Satisfactory Essays
Open Document
Open Document
6660 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Investment Avenue
Feasibility Study Report Of Existing 11kV Transmission Line from Lakwa GGS- I to Lakmani GGS - IV for catering the Existing and Proposed additional loads

Megha Engineering & Infrastructure Ltd.
S-2, Technocrat Indl. Estate, Balanagar, Hyderabad-500037,

February-2013

Power Research and Development Consultants Private Limited
No 5, 11th Cross, 2nd Stage, West of Chord Road, Bangalore - 560086, Karnataka, INDIA. Ph: +91- 80-42455555, FAX: 23192210, E-mail – prdc@vsnl.com, Web site: www.prdcinfotech.com

Load flow Analysis – MEIL

Feb – 2013

Document reference details:
Purchase Order details • SREE-MEIL-VNGS/PRDC/ARP/WO/HYD4/02/328 dated 17-12-2012.

Document reference No. • PRDC/2012-2013/MEIL/1811

Revision Index: Revision Description Date Remarks Based on the data collected during site visit.

0

Draft report

04.02.13

Project Team: Prepared by Mr. Harsha Vardhana BS Mr. Kiran Kumar S Mr. Jagannatha Gupta 04.02.13

Reviewed by

04.02.13

Approved by

Mr. T.Gurucharan Das

04.02.13

Power Research and Development Consultants Pvt. Ltd.

1

Load flow Analysis – MEIL

Feb-2013

EXECUTIVE SUMMARY
1.0 ONGC have established a 11 kV transmission line stated to have been 30 years old for Power evacuation from 3X3 MW Captive generation plant at Lakwa GGS-I to cater the loads to Lakmani-GGS-IV, ONGC colony, Oil Pumps and nearby villages. 2.0 The 11kV Transmission line particulars as per the GPS survey conducted by are as furnished in the below Table PRDC

11 kV Transmission Line particulars Conductor details Sl No Type of line supports Length in kms Aluminum No of strands/ dia in mm 6/2.425 6/4.4 Steel wire Total No of aluminum Strands/ area in dia in Sq mm mm 1/2.52 1/4.43 27.72 91.24 D.C.resista nce in at 20°C Current Carrying Capacity in Amps at 65°C 102 260

Particulars

1 2 3

Trunk line Spur line Total line length

9.5 Mtrs Steel Tubular poles

12.048 15.597 27.645

1.162 0.337

3.0 Load Details
3.1. The abstract of DTCs connected on the feeder are furnished in

You May Also Find These Documents Helpful

  • Better Essays

    D1 Unit 4 Essay

    • 1719 Words
    • 7 Pages

    Qu6. Analyse the need for selecting the different voltages used for different parts of the generation, transmission and distribution systems drawn for Qu.5.…

    • 1719 Words
    • 7 Pages
    Better Essays
  • Good Essays

    unit 7

    • 845 Words
    • 4 Pages

    Solid dielectric cable has become the national standard for underground electric transmission lines less than…

    • 845 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Costa Blue Essay

    • 492 Words
    • 2 Pages

    Pole 2367’ from DER, 764’ left of centerline, 55’ AGL/184’ MSL. () 6 AJAYE Transmission line tower 2800’ from DER, 992’ left of centerline, 82’ AGL/192’ MSL. Transmission tower 2856’ from DER, 926’ left of centerline, (1 5) 82’ AGL/192’ MSL. FABRA 02 GHART 3000 (ATC) 1300 ENNEY 20 60 5000 (ATC) 1300 7 () 1 32 5 21 5 21 8 ( 5 20 5 20 NOTE:…

    • 492 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Nike, Inc. is an American multinational corporation that is engaged in the design, development and worldwide marketing and selling of footwear, apparel, equipment, accessories and services. The company is headquartered near Beaverton, Oregon, in the Portland metropolitan area. It is the world 's leading supplier of athletic shoes and apparel and a major manufacturer of sports equipment, with revenue in excess of US$24.1 billion in its fiscal year 2012 (ending May 31, 2012). As of 2012, it employed more than 44,000 people worldwide. The brand alone is valued at $10.7 Billion making it the most valuable brand among sports businesses. Nike and Precision Castparts are the only Fortune 500 companies headquartered in the state of Oregon, according to The Oregonian.…

    • 1350 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    This is a highly important issue, power lines are a huge threat on people’s lives due to the electromagnetic radiation and should be taken into…

    • 406 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    8. Fink, D.; Rho Jae Jeung; , "Feasible connectivity solutions of PLC for rural and remote areas," Power Line Communications and Its Applications, 2008. ISPLC 2008. IEEE International Symposium on , vol., no., pp.158-163, 2-4 April 2008…

    • 3916 Words
    • 16 Pages
    Best Essays
  • Good Essays

    Transmission Lines Construction: It undertakes Turnkey as well as Task/ Scope oriented Projects for Transmission and sub-Transmission Lines in India. Scope of work for the company as an EPC contractor broadly includes Design & Detailing of Towers, Testing, and Manufacturing including Galvanization of Towers, Survey, Route Optimization, Foundations/Civil Works, Erection, Stringing, Testing and Commissioning of Transmission Lines. The company has completed more than 1000 km of 400 kV Lines & 1500 km of lines below the voltage level of 400 kV for several power utilities.…

    • 741 Words
    • 9 Pages
    Good Essays
  • Powerful Essays

    Ambuja Cement

    • 4426 Words
    • 18 Pages

    The plant with an installed capacity of 0.7MTPA (million tone per year) was a huge success with some equipment changing and optimizing the existing plant company had produced 1MTPA from the plant. Then another plant “Gujarat Line-1” again with an installed capacity of 1MTPA was erected in the same area and commissioned in 1992. Then a new unit “Gujarat Line-2” with an installed capacity of 1MTPA was beside the existing plants at Kodinar and commissioned in 1996. Then through continues improvement Ambuja unit and Gajambuja line -1 have upgraded by 0.5 MTPA each. In addition to these plants G.A.C.L. has packing units at Surat (Gujarat) and Panvel (Maharastra). Loose cement is dispatched to these locations by sea-route.…

    • 4426 Words
    • 18 Pages
    Powerful Essays
  • Good Essays

    POWERAPPS

    • 735 Words
    • 3 Pages

    Network was represented from 33 kV to last relay location at LV side. The Single Line Diagram is shown in the following…

    • 735 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    The construction practices in the transmission wing of RVPN have been built over the past 40 years and passed on from seniors to juniors. The new generation of Engineers, skilled Technical Supervisors and Workmen has, from time to time, constantly updated the construction practices according to the latest developments in the field of Transmission Engineering.…

    • 38732 Words
    • 155 Pages
    Powerful Essays
  • Satisfactory Essays

    Modernization Project

    • 307 Words
    • 2 Pages

    This project focuses primarily on the mainline that runs from Tbilisi to the Black Sea, in particular to the terminals at Poti and Batumi. As part of the project, the Company intends to modernise the railroad and electric supply infrastructure between Tbilisi and Batumi (315 kilometres), including the 40-kilometre mountainous gorge region in Central Georgia, with the aim of achieving passenger train speeds of 80 km/h on the gorge section and 120 km/h on the rest of the mainline, as compared to current average speeds of approximately 55 km/h in the gorge section and approximately 65-90 km/h on the rest of the mainline.…

    • 307 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Corona Phenomenon

    • 1449 Words
    • 6 Pages

    For an overhead transmission system the atmospheric air, which is the dielectric medium, behaves practically like a perfect insulator when the potential difference between the conductors is small. As long as the air is subjected to uniform electric field intensity, the flow of current between the two conductors of the line is negligibly small.…

    • 1449 Words
    • 6 Pages
    Satisfactory Essays
  • Good Essays

    Student

    • 1805 Words
    • 8 Pages

    KANIZSA-300 (DKG) - mast 42 m (137') max. hook load with 10 lines = 200 tons…

    • 1805 Words
    • 8 Pages
    Good Essays
  • Good Essays

    Answer: Because a fast moving train or vehicle leans inwards while taking turn and the…

    • 608 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Power Line Communication

    • 17540 Words
    • 71 Pages

    presented based on the findings of the research done at various European cities on exploring powerline…

    • 17540 Words
    • 71 Pages
    Satisfactory Essays