IndianOil Major Projects IndianOil continues to lay emphasis on infrastructure development. Towards this end, a number of schemes have been initiated with increasing emphasis on project execution in compressed schedules as per world benchmarking standards. Schemes for improvement and increased profitability through debottlenecking / modifications / introduction of value added products are being taken up in addition to grassroots facilities. Project systems have been streamlined in line with ISO standards.
INTEGRATED CRUDE OIL HANDLING FACILITIES AT PARADIP
Project Cost: Rs. 1492.33 crore Expected Com m issioning: Both the SPMs have been commissioned with receipt of crude oil in onshore tanks on
31.12.2012 and 22.1.2013. Completion of onshore activities anticipated by March 2013.
Benefit: The proposed facilities would enhance crude handling capacity at Paradip port. Brief Description: The proposal is for installation of 2nd SPM for Paradip Refinery and 3rd SPM & sub-sea crude oil
transfer pipeline with associated facilities as a part of Integrated Offshore Crude Handling Facilities at Paradip.
CONSTRUCTION OF TANKS AND BLENDING FACILITY AT VADINAR (5 X 85000 KL)
Project Cost: Rs. 267.00 crore Expected Com m issioning: Project is mechanically completed and integrated with existing system. However,
commissioning will be taken up after completion of rim seal fire protection works, progressively from March 2013 onwards.
Benefit: The proposed scheme would ensure the reduction in demurrage being paid at Vadinar crude oil receipt
terminal.
Brief Description: Project consists of construction 5 tanks of 85000 KL capacity each to store HS-Heavy crude oil along
with crude oil mixing facility at Vadinar.
STYRENE BUTADIENE RUBBER (SBR) AT PANIPAT
Project Cost: Rs. 890 crore Expected Com m issioning: 1st quarter 2013 Benefit: Value addition for naphtha / butadiene by forward integration with SBR. Brief Description: As part of integrating