Job Saftey Analysis
Job Safety Analysis and Cost Safety Analysis

Table of Contents

Introduction The following document outlines lines the domestic works conducted on a new garage area, which includes the preparation and application of epoxy coatings to the floors and walls. This will include the scope of the works, as well as a job safety analysis and a costing analysis on the intended works. The job safety analysis is presented as it was written by the sub-contractor, Epoxy Coating Services and to be received by the Work supervisor which in this case will be Sam Sommerville to be approved before works can commence. A cost safety analysis will also be performed on the job safety analysis to identify a rough estimate of cost, of the safety equipment required to allow this job to commence.
Background Information
The domestic works involve a newly constructed two door garage, with a reinforced concrete slab for the base and three reinforced concrete walls. This job required the floors and walls of the garage to be prepared and have epoxy coatings applied to the concrete surfaces; these works will be conducted by the sub-contractor and monitored by the work supervisor.
Scope of Work
The scope of work will outline the inclusions and exclusions of the entire job regarding the epoxying preparation and application on the floor and walls of the newly constructed garage.
Inclusions
Subcontractor shall provide all labour and supervision
Subcontractor shall provide all materials, plant and equipment,
Internal exposed concrete floors
Preparation of concrete surfaces i.e. Grinding, acid, water blasting
Preparation of epoxy products
Application of Epoxy coating of the Garage concrete floor base Application of Epoxy coating of the Garages three concrete walls
Removal of debris and general clean-up of work site

Exclusions
Sub-contractor will not conduct the Painting of the walls and floors
Sub-contractor will not

You May Also Find These Documents Helpful

  • Powerful Essays

    The statement of work defines the construction project for the Phoenix family's new garage with second level living quarters. Fales Construction is the general contractor for the project. The excavation and foundation work will be sub-contracted to Mural Excavation and Landscaping. The carpentry work will be sub-contracted to Fox Construction. The plumbing work will be sub-contracted to Soldiers Plumbing. The electrical work will be sub-contracted to Amps-R-Us.…

    • 1988 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    Palmer Bird

    • 4419 Words
    • 17 Pages

    and masonry work on the exterior cladding of the building and hired an engineering firm,…

    • 4419 Words
    • 17 Pages
    Powerful Essays
  • Satisfactory Essays

    Eco 550 Assignment 2

    • 421 Words
    • 2 Pages

    Office building maintenance plans call for the stripping, waxing, and buffing of ceramic floor tiles. This work is contracted out to office maintenance firms, and both technology and labor requirements are very basic. Supply and demand conditions in this perfectly competitive service market in New York are:…

    • 421 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Use personal protective equipment (PPE) and access equipment/ working platforms safely to carry out the activity in accordance with legislation and organisational requirements when installing external wall insulation.…

    • 552 Words
    • 4 Pages
    Satisfactory Essays
  • Better Essays

    The reason for this belief is that according to Melendez and Surbey (2013),The U.S. Department of Labor 's Wage and Hour Division and the franchisor of the world 's largest restaurant chain are collaborating to increase compliance with federal labor laws at SUBWAY locations nationwide. Although these restaurants are independently owned and operated, the franchisor is providing a forum and resources to assist the division in educating franchisees. Subway does this across the board at each restaurant even though most of these businesses are franchisee stores. Subway is making a conscience effort to ensure that they stay in compliance with local and federal labor…

    • 978 Words
    • 4 Pages
    Better Essays
  • Better Essays

    Psy302 Job Analysis Paper

    • 1222 Words
    • 5 Pages

    Applicants applying for the assistant manager position must meet these requirements: valid drivers license, be 21 years of age or older, have at least one year of management experience, must have high school diploma or equivalent, and must have reliable transportation.…

    • 1222 Words
    • 5 Pages
    Better Essays
  • Better Essays

    Unit 13 P1 Job Analysis

    • 1095 Words
    • 5 Pages

    *Advert-a paid/free announcement in newspapers or magazines, internet, TV or radio, etc. Which main purpose it’s to attract people and get their attention.…

    • 1095 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Business Law

    • 383 Words
    • 2 Pages

    The purpose of this assignment is to discuss the renovation of Danile and Sondra Estelle home. To finance the cost they obtained a line of credit from Banc One, Indiana, which periodic does inspections to disburse funds. When the bank did the inspection they found the work to be of poor quality. When Allen failed to act on the Estelle’s complaints, they filed a suit in an Indiana State court against Allen Construction and Allen personally.…

    • 383 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    building a new structure

    • 1808 Words
    • 8 Pages

    (a) The successful contractor must be a certified installer of the infrastructure components being provided and show proof thereof.…

    • 1808 Words
    • 8 Pages
    Good Essays
  • Good Essays

    Psy 435 Job Analysis Paper

    • 1081 Words
    • 5 Pages

    Job analysis is the studying and evaluation what a job entails; describing precisely the skills needed and the qualifications to fulfill the job accurately. Job analysis is when personnel functions because the methods of any non need to be precise. For instance, in a job the positions and the duties should be clearly stated, therefore; the job analyst would need to observe an individual in the current position. This means that the individual who are the job analyst should be very familiar with jobs and the position. According to Riggio (2008) “a job analysis is leads directly to the development of several other important personnel; a job specification, a job evaluation, and performance criteria” (Riggio, 2008, p. 57).…

    • 1081 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Research Paper

    • 722 Words
    • 3 Pages

    Recently you made inquiry with my firm as to the ramifications involved in starting up your own business as a contractor performing painting and roofing of residential homes. You informed us that you have been working approximately five years in the construction business, and now wish to start your own business. The attached sheet will give you some idea as to what would be involved should you decide to take this step. Based on our research, we have broken down your questions regarding contracts with customers including any requirements and/or limitations involved.…

    • 722 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    duty of quantity surveyor

    • 2400 Words
    • 9 Pages

    Q.3b) Given the progress in construction industry and techniques, what other tasks would you propose to be included to the existing list to demonstrate the potentials and expand the services of the quantity surveyor.…

    • 2400 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    China International Concrete Technology & Equipment Expo is an interactive feast held each year by more than ten national authority associations in concrete materials and engineering industry, and is also the sole expo covering concrete industry chain in China. Since establishment, this exhibition has attracted more than 600 companies from 22 countries, offering a platform for advanced products, industry trend as well as cooperative projects.…

    • 439 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    (ii) Supplying, fabricating, shop painting, transporting and erecting light steel work in open web joists, bracings, bridgings, sag rods, sway frames etc.…

    • 3580 Words
    • 15 Pages
    Powerful Essays
  • Satisfactory Essays

    Nebosh Inspection

    • 645 Words
    • 3 Pages

    Instruction for use: All items marked as unsatisfactory on page 1 must be referred to on page 2 along with the category, action to be taken, by whom and the date for completion / close out. When remedial action has been taken, the person who received the report must confirm in writing close out with the person who carried out the inspection. Note: Guidance on completing the form can be found on SF054 Contract Name: SAMPLE Site Location: SAMPLE Client: Matrix Compliance Check List Key Ref. 1 2 3 4 5 6 Inspected Item Offices and Welfare Mess facilities, drinking water Office cleanliness and integrity Toilets Fire prevention and safety First aid kits Prescribed signs and notices Monitoring and Control 7 8 9 10 11 12 13 14 15 Supervision of work Registers and Certificates Assist Reports (retained on site) Induction Training (SHEQ) Dissemination of information Plant authorisation Compliance with SHEQ Plans Compliance with risk assessments Compliance with method statements Site General 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Stores/ Control of goods and materials Site access and egress Site security and demarcation Traffic Mgt Plan and Rights of Way Overhead power cables Public safety Chapter 8 compliance (street works) Personal protective equipment Emergency contact Site Specific Excavations, shafts and tunnels Access to electrical areas Barriers and fencing Scaffolding and mobile towers Ladders and steps Cranes and lifting equipment Other plant Permanent electrical plant Temporary electrical supplies Power tools Sub totals (Satisfactory) Note: For Audit close out refer to SP17 52 53 54 55 56 57 58 59 60 a) b) c) d) e) 42 43 44 45 46 47 48 49 50 51 41 Contract No: SAMPLE Project Manager: SAMPLE Date: Satisfactory…

    • 645 Words
    • 3 Pages
    Satisfactory Essays