Preview

Km Greater

Good Essays
Open Document
Open Document
757 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Km Greater
PROJECT ENVIRONMENTAL MONITORING AND AUDIT PRIORITIZATION
SCHEME (PEMAPS) QUESTIONNAIRE
Project Name
Project Location
Proponent
Pollution Control Officer
Tel. No./Fax No./Email

:
:
:
:
:

Project Type
Project Status

:
:

I.

MONTGOMERY FARMS CORP.
Brgy. Cabatang Tiaong, Quezon
Clarissa Vallada
02-659-5509 / 0917-8545-491
Poultry – Contract Growing Farm
On- going

PROJECT CONSIDERATIONS

Size and Type
Size based on number of employees
Specify number of employees:

12

Type
ECP
Non-ECP but in ECA
Non-ECP and Non-ECA

X

Waste Generation and Management
Enumerate Waste Type and Specify Quantity of Wastes generated in your facility. (Identify
/Enumerate)
Category
Air

Liquid

Waste
Waste 1
Waste 2
Waste N
Waste water during cleaning

Hazardous

Type
Non-Hazardous
X
X
X

Quantity

X

X
Solid

Pollution Control System (PCS)
Enumerate PCS or Waste Management Method Used in your facility.
(Identify /Enumerate)
Category

PCS/Waste Management Method Used
PCS 1

Air
PCS 2
PCS N
Primary
Liquid
Secondary
Tertiary

Remarks
2 standby generator set with mufflers and air cleaner Waste water during cleaning were treated on the waste water facility of the farm ( septic tank )

Solid waste management in the farm is being practiced.
(Biodegradable and nonbiodegradable ) Recyclable wastes are being sold to junk shop, while biodegradable are being composted. Solid

II.
PATHWAYS
Prevailing wind towards barrio or city? (mark the corresponding point) Yes _

No X

Rainfall (impacts surface & groundwater pathways)
Average annual net rainfall:
Specify amount:
Maximum 24-hour rainfall:
Specify amount:

Terrain (select one and mark) Flat X

Steep _

Is the facility located in a flood-prone area? (select one and mark) Yes ___ No X
Ground Water
Depth of groundwater table (meter)
0 to less than 3
3 to 10
Greater than 10

III.
RECEIVING MEDIA/RECEPTORS
Air

You May Also Find These Documents Helpful