SCHEME (PEMAPS) QUESTIONNAIRE
Project Name
Project Location
Proponent
Pollution Control Officer
Tel. No./Fax No./Email
:
:
:
:
:
Project Type
Project Status
:
:
I.
MONTGOMERY FARMS CORP.
Brgy. Cabatang Tiaong, Quezon
Clarissa Vallada
02-659-5509 / 0917-8545-491
Poultry – Contract Growing Farm
On- going
PROJECT CONSIDERATIONS
Size and Type
Size based on number of employees
Specify number of employees:
12
Type
ECP
Non-ECP but in ECA
Non-ECP and Non-ECA
X
Waste Generation and Management
Enumerate Waste Type and Specify Quantity of Wastes generated in your facility. (Identify
/Enumerate)
Category
Air
Liquid
Waste
Waste 1
Waste 2
Waste N
Waste water during cleaning
Hazardous
Type
Non-Hazardous
X
X
X
Quantity
X
X
Solid
Pollution Control System (PCS)
Enumerate PCS or Waste Management Method Used in your facility.
(Identify /Enumerate)
Category
PCS/Waste Management Method Used
PCS 1
Air
PCS 2
PCS N
Primary
Liquid
Secondary
Tertiary
Remarks
2 standby generator set with mufflers and air cleaner Waste water during cleaning were treated on the waste water facility of the farm ( septic tank )
Solid waste management in the farm is being practiced.
(Biodegradable and nonbiodegradable ) Recyclable wastes are being sold to junk shop, while biodegradable are being composted. Solid
II.
PATHWAYS
Prevailing wind towards barrio or city? (mark the corresponding point) Yes _
No X
Rainfall (impacts surface & groundwater pathways)
Average annual net rainfall:
Specify amount:
Maximum 24-hour rainfall:
Specify amount:
Terrain (select one and mark) Flat X
Steep _
Is the facility located in a flood-prone area? (select one and mark) Yes ___ No X
Ground Water
Depth of groundwater table (meter)
0 to less than 3
3 to 10
Greater than 10
III.
RECEIVING MEDIA/RECEPTORS
Air