Komatsu Target Costing System
Komatsu, Ltd. (A)
Target Costing System

Komatsu
• • • • • • • Founded 1917 Takeuchi Mining Co.,Komatsu Ironworks 1921 Komatsu, Ltd. 1991- International Firm Revenue Y989 bn NI Y31bn Construction Equipment, Industrial Machinery- Core Business. Electronics applied products – New Business : 80% • Rest from construction, unit housing, cheimcals, plastics and SW Development • 1989: “3G” : Growth, Globalisation and Group Diversification • 1995 : Exp Y 1.4 Tn; Worldwide production by 2000; Develop electronics, plastics, robotics; By 2000: Non construction products: 50%

Construction Equipment
• World’s second largest Mfr. • 300 models: bull dozers, excavators, wheel loaders, dump trucks • Market leader, Japan 30 % MS: Hitachi, Kobelco, Caterpillar Mitsubishi, Sumitomo. • Komatsu and Caterpillar Mitsubishi only bulldozers • Small country, many infra projects-popularity of excavators: digging,carrying, moving and loading dirt.

Product Development Process
• Approx 2 years: 6 months to 3 yrs • Product Planning Long range production plan: Mix of products and conceptual designs: Detailed description of structure • Design
– Prepare product for prototype production – Conceptual drawings: ’A’ study- Feasibility of TC, Manufacturability of design – Layout drawings: ‘B’ Study: Firm’s ability to achieve TC – Detailed parts drawing: ‘C’ study: Real time achievability of TC and Mfg process and facilities

Product Development Process
• Trial Production
– Finalize design. Produce prototype. ‘D’ Study: Ease of production, Assembly of new product, Quality. If problem, trial Manufacture problem Document. Reestimate production cost and tests to ensure quality

• Preparation for full production
– Final TC and various studies to Marketing Committee for final approval for Mass production. Once approved, readied for full production. Production drawings prepared and pre-production plans developed. Confirm and rectify ‘D’ study problems. Released for mass production


You May Also Find These Documents Helpful

  • Satisfactory Essays

    OPS 571 Week 1 Summary

    • 460 Words
    • 3 Pages

    Pick one product with which you are familiar. Complete three to five line items such as Job shop, batch, assembly line, or continuous flow approach, on the Process Design Matrix.…

    • 460 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    OPS 571 Week 4 Summary

    • 454 Words
    • 3 Pages

    Pick one product with which you are familiar. Complete three to five line items such as Job shop, batch, assembly line, or continuous flow approach, on the Process Design Matrix.…

    • 454 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    OPS 571 Week 5 Summary

    • 449 Words
    • 3 Pages

    Pick one product with which you are familiar. Complete three to five line items such as Job shop, batch, assembly line, or continuous flow approach, on the Process Design Matrix.…

    • 449 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    2 Background ......................................................................................................... 3 2. Project Description and Goals.................................................................................3-4 3. Technical Specification ............................................................................................... 4 4. Design Approach and Details 4.1 4.2 4.3 Design Approach .................................................................................................. 5 Codes and Standards............................................................................................. 6 Constraints, Alternatives, and Tradeoffs .............................................................. 6…

    • 2605 Words
    • 16 Pages
    Powerful Essays
  • Better Essays

    When developing a brand new product to be sold in the marketplace, it is crucial that all aspects of production are considered before beginning. Many factors need to be considered, including but not limited to which machinery will be used in production, where will the pricing be set,…

    • 867 Words
    • 4 Pages
    Better Essays
  • Best Essays

    Se571 Aircraft Solutions

    • 1896 Words
    • 8 Pages

    The company strategy is to offer low-cost design and computer-aided modeling packages to customers to reduce their development expenses. AS will help the customer through all phases of new product deployment, from initial prototypes through final large-volume production and assembly. By involving itself in all phases of customer product development, AS hopes to establish long-term relationships and secure repeated follow-on business with its customers. In addition, AS continues to invest heavily in workforce education and training, so as to improve capability to serve its customers.…

    • 1896 Words
    • 8 Pages
    Best Essays
  • Powerful Essays

    Hnc Forms of Construction

    • 3301 Words
    • 14 Pages

    Contents 1.0 Introduction 2.0 Methodology 3.0 Inception 4.0 Feasibility 4.1 Overview of stage 4.2 Assessing the feasibility 4.3 Site investigation 4.4 Effects on design 5.0 Then brief 5.1 Overview of stage 5.2 What the brief should cover 5.3 What the brief should include 5.4 Consultants at this stage 6.0 The concept/outline proposals 6.1 Overview of stage 6.2 Requirements to proceed with concept design 6.3 Developing the brief into concept design 6.4 Planning permission 6.5 Building regulations approval 6.6 Achieved at this point 7.0 The design development 7.1 Overview of stage 7.2 Developing the design 7.3 Finalisation of design 7.4 Planning proposal 7.5 Building regulations 7.6 Sampling and testing 7.7 Health and Safety 7.8 Achieved at this stage 8.0 Technical design 8.1 Overview of stage 8.2 Implications on design 9.0 Production phase 9.1 Overview of stage 9.2 Design implications 10 Other construction projects…

    • 3301 Words
    • 14 Pages
    Powerful Essays
  • Better Essays

    The Product Life Cycle (PLC) occurred in just over two years. Most of the time was used in the defining stage. This took the longest amount of time because the specifications, goals, tasks, and responsibilities are developed during this instance (Gray, &…

    • 1074 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Scenario Two

    • 1368 Words
    • 6 Pages

    The company strategy is to offer low-cost design and computer-aided modeling packages to customers to reduce their development expenses. AS will help the customer through all phases of new product deployment, from initial prototypes through final large-volume production and assembly. By involving itself in all phases of customer product development, AS hopes to establish long-term relationships and secure repeated follow-on business with its customers. In addition, AS continues to invest heavily in workforce education and training, so as to improve capability to serve its customers.…

    • 1368 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Komatsu Case Study

    • 475 Words
    • 2 Pages

    1. How was Komatsu able to evolve from a $169 million company with low-quality products to become a real challenge to Caterpillar by the early 1980s? How would you evaluate Mr. Kawai's performance?…

    • 475 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Duff = “responsibility is a necessary but not a sufficient condition of liability” An actor is responsible when they are sufficiently blameworthy in causing the harm or committing the wrong = we blame those who have control over their actions (committing a crime is a mental process)…

    • 2945 Words
    • 85 Pages
    Good Essays
  • Satisfactory Essays

    U&E, PD&D, 4th Edition, Chapters 4 (Identifying Customer Needs); Chapter 5 (Product Specifications); Chapter 6 (Concept Generation), Chapter 16 (Managing Projects)…

    • 499 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Boeing 767 Case Study

    • 1104 Words
    • 5 Pages

    Boeing adopts a very thorough, well planned out process to manage the project. The stages are defined clearly and tasks involved in each stage are carried out sequentially. The first stage of their approach is the project definition phase during which Boeing identified holes in the market not met by existing planes, assessed future airline needs, considered alternative plane configurations, explored feasibility of possible technologies and performed preliminary estimation of costs. During the market assessment, analysts gathered information regarding future needs of airlines by speaking directly to major airlines. Design specifications are then identified during configuration followed by formation of technological divisions. Technology development includes four major areas, and each area has its own chief engineer responsible for overseeing research, development and application of the technology. Audit teams are active during the program definition phase; auditors are usually experienced managers within the company and they are assigned to review every significant element of the program. The second stage is cost definition phase during which a parametric estimating technique is used to predict costs from initial design characteristics and to estimate the number of labor hours. The third phase consists of supplier and production managements. The suppliers are risk-sharing program participants or major subcontractors who worked closely with Boeing engineers from initial to final phase to meet deliverables of the project. After part fabrication process begins, a management visibility system is adopted with schedules prominently posted and marathon status meetings held to ensure that preset deadlines are met. During the final stage, a First Flight Committee, who reported directly to the general manager and met daily during the six…

    • 1104 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Develco: A Case Study

    • 98 Words
    • 1 Page

    Out of the conviction that a product can ultimately only succeed if it can be provided to the patients timely and in a faultless in reproducible quality. Methods of production, in place within Develco have a special meaning. Therefore, it undertakes…

    • 98 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    New product is crucial because the market is changing... the old trend might become new again... but it never stay still. Only constant is change. That’s why we have to do the new product development process. There is a 7-step process comprising the key elements of new product development.…

    • 480 Words
    • 2 Pages
    Good Essays