There are some lessons that I have gained from the assignment 3 as described below
1. How to prepare a presentation for business customer, not a technical presentation.
When preparing the presentation power point, the team made it more on technical presentation. After the dry-run, the team found out that this presentation is for a client. It must be more in business context. The lesson is if we miss a target audience then we may lose a chance to get success of this project.
2. How to estimate time frame for the whole project using the SCRUM method. Especially for two people in a very small team. At beginning to estimate time frame for the whole project, the team based on own experience, which is very shallow, to give time frame for whole project. I knew that it should not be done by this way because the risk probability is very high.
3. The Quality Plan is very important. It sets an assurance for the project. I did not clearly understand the Quality Plan until I do the dry-run of the assignment 3 and get the helpful feedback. After that I did research for this and realize that for every Sprint in this project, the processes of handle the Quality are really not just about testing.
List of lessons learnt from Assignment 3:
There are some lessons that I have gained from the assignment 3 as described below
1. How to prepare a presentation for business customer, not a technical presentation.
When preparing the presentation power point, the team made it more on technical presentation. After the dry-run, the team found out that this presentation is for a client. It must be more in business context. The lesson is if we miss a target audience then we may lose a chance to get success of this project.
2. How to estimate time frame for the whole project using the SCRUM method. Especially for two people in a very small team. At beginning to estimate time frame for the whole project, the team based on own experience, which